    Design And Installation Of A 1818 Tonnes, 273 Meter Lift, Vertical Conveying System At White County Coal Pattiki 2 Mine, Carmi Illinois

    By S. Crewdson

    Vertical hoisting of materials using hoists and skips is common in the Mining Industry. These systems have a number of drawbacks, one being limited hoisting capacity at medium depths. FKC-Lake S

    Jan 1, 2003

  • SME
    Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water System

    By Jean-Pierre Nossereau, Allen J. Hulshizer

    The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in

    Jan 1, 1981

  • SME
    Design And Manufacture of Conveyor Pulley Assemblies for Drummond Coal Shoal Creek Slope Belt

    By Rick Sarkisian, Albert D. Bonneau, David Keech

    The Drummond Co. Inc.'s Shoal Creek Coal Mine Slope Belt Conveyor transports 5000 mtph (5500 tph) of material over a length of 1400 m (4600 ft.) and a lift of 3609 m (1180 ft.). Four 1500 kW (200

    Jan 1, 1996

  • SME
    Design And Operating Characteristics For Large Flotation Cells ? Historical

    By Nathaniel Arbiter

    The development of flotation machines since the first industrial use of the process can be divided into three stages. The first, up to about 1930, was marked by diversity in the means for contacting f

    Jan 1, 1979

  • SME
    Design and Operating Considerations for the Application of a Dry Grinding and Roasting Circuit for Refractory Gold Ore

    By P. G. Semple, K. W. Major, P. Eng.

    The recent increase in development of refractory gold deposits has resulted in changes to the traditional treatment processes. The selection of the preferred refractory treatment process is dependent

    Jan 1, 1990

  • SME
    Design And Operating Experiences With Flotation Columns In China

    By Guoming Liu, Weibai Hu

    The designing aspects of column profile, cross-section and height, types of aerator or air sparger, and feeding and discharging devices have been designed and tested. In operating aspects, the flotati

    Jan 1, 1988

  • SME
    Design and Operating Results of the Nitrox Process ®

    By Ken J. Fair, Vicken H. Aprahamian, Gus Van Weert

    A consortium of Canadian mining companies, engineering firms and the Ontario Government has supported Hydrochem's efforts in the last year to design and cost a 10 tpd NITROX PROCESS® demonstrati

    Jan 1, 1988

  • SME
    Design And Operation Of A Microwave Pilot Plant For Calcining Refractory Gold Ores And Concentrates

    By P. Brooks, W. LaRochelle, J. M. Tranquilla

    EMR's recently commissioned Pilot Plant in Fredericton, N.B. Canada, the latest and largest in the company's sequence of prototype and demonstration systems, is being used as a process development fac

    Jan 1, 1998

  • SME
    Design And Operation Of The Circulating Fluid Bed Roaster System For The Syama Gold Deposit Project

    By S. A. Bunk, W. P. Wood

    In the early 1980's BHP identified several potential gold deposits in West Africa. One of these deposits was located in Mali, near the village of Syama. As a result of extensive explo­ration activitie

    Jan 1, 1996

  • SME
    Design And Operation Of The Hydrochem Flotation Column

    By J. C. Schneider, G. Van Weert

    Hydrochem Developments Ltd. has developed and put into full scale operation a novel type of vertical flotation column incorporating a multiplicity of mechanically agitated stages. Characteristics of t

    Jan 1, 1988

  • SME
    Design And Operation Of Two Stage Rod-Pebble And Autogenous-Pebble Grinding Circuits At Boliden?s Aitik Plant ? 1. General

    By Per H. Fahlstrom

    The story of the Aitik mine begins in the early thirties. At that time blocks of low grade chalcopyrite impregnations were found in Swedish Lapland not far from the present mine, some 40 miles north o

    Jan 1, 1974

  • SME
    Design And Operation On Sintering Plants Incorporating Cooling Of The Sinter On The Strand ? Introduction

    By J. Astier

    The idea of using only one strand for both sintering and cooling of the sinter is not new. In 1952, in the U.S.A. a sintering plant was built at Benson Mine (Star Lake, N.Y.), including : - 68 m2 o

    Jan 1, 1974

  • SME
    Design and Optimization of Mineral Processing Using Simulation Technology in Brazil

    By M. A. S. Martins, J. C. Guillaneau

    Steady-state simulation has been proving its usefulness and efficiency in process design and optimization for many years. Steady-state simulation is a very effective approach for plant design since

    Jan 1, 1998

  • SME
    Design And Performance Of Curved Sag Mill Pulp Lifters

    By D. Royston, D. Denlay

    Pulp lifters are used to discharge ground pulp from non-overflow grinding mills. In straight-radial channel pulp lifters, discharge is often incomplete and back-flow down the pulp lifter can occur. Le

    Jan 1, 1999

  • SME
    Design And Performance Of The National Steel Pellet Plant High Temperature Heat Recuperation System

    By E. F. Draskovich

    In 1984 a high temperature heat recuperation system was installed in the pellet plant of the National Steel Pellet Company located in Keewatin, Minnesota. The system is similar to those of Cleveland C

    Jan 1, 1986

  • SME
    Design And Performance Verification Of A Booster Fan Installation At The Red Lake Mine

    By L. Sletmoen, P. Rocque, E. DeSouza

    Plans for achieving planned production rates at the Red Lake Mine High Grade Ore Zone required that the mine ventilation system be upgraded. Time constraints required that only a site assessment of th

    Jan 1, 2003

  • SME
    Design and Planning of New Passageway Tunnel for Circulation Improvements at Grand Central— 42nd Street Station, New York City - RETC2023

    By Alfredo Valdivia, Dominic Reda, Vojtech Gall

    The design and planning for the construction of a new passageway to improve access and circulation to better accommodate anticipated increased passenger flow within Grand Central—42nd Street Station.

    Jun 13, 2023

  • SME
    Design and preliminary testing of a low-energy planetary excavator - SME Transactions 2010

    By L. Gertsch, R. Gustafson, J. Rostami, C. Swope

    Development of a permanent human base on the moon for exploration requires a self-sustaining system. Such a system entails the production and processing of limited amounts of raw material on the moon.

    Jan 1, 2010

  • SME
    Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134

    Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a

    Jan 1, 2009

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005