Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Design Considerations And Operating Experience On A Semi-Autogenous Milling Installation At A South African Gold Mine

    By J. V. G. Middleton

    The paper gives a comprehensive review of the design considerations which determined the choice of the milling plant, a description of the plant and comment on the operating experience to date. Opera

    Jan 1, 1989

  • SME
    Design Considerations For A High Tonnage Counter Current Decantation (CCD) Thickener Plant

    By D. Anthony, R. A. Williams, R. Raponi

    Barrick Gold Corporation in conjunction with SNC Lavalin Engineers and Constructors have developed basic engineering design for counter current decantation thickener (CCD) plants capable of processing

    Jan 1, 2002

  • SME
    Design Considerations For Closure Caps For Waste Piles And Tailings

    By Marc E. Orman, Mark E. Smith

    Regulatory and environmental concerns continue to broaden the range of mine wastes that must be capped with low permeabili­ty liner systems at closure. The mining industry has been a leader in develop

    Jan 1, 1996

  • SME
    Design Considerations For Impounding Valley Leach Pads Vs. Conventional

    By Allan Breitenbach

    Leaching has been used since the 1600s on unlined ore dumps and since the late 1970s on lined leach pads for the recovery of metals from mined ore, the latter typically called ?heap? leaching and the

    Jan 1, 2012

  • SME
    Design Considerations for Main Exhaust Fan Systems at Underground Coal Mines

    By Richard E. Ray

    INTRODUCTION Main mine fan installations at underground coal mines must be designed to comply with the requirements outlined in 30 CFR (Code of Federal Regulations) Part 75. However, very little e

    Jan 1, 1997

  • SME
    Design Considerations for Main Surface Fan Installation

    By A. D. S. Gillies, A. Haghighat

    "A study has been undertaken at the Missouri University of Science and Technology (MS&T) limestone Experimental Mine to determine new fans set up and wiring options.to install additional mine ventilat

    Jan 1, 2015

  • SME
    Design Considerations For Merrill-Crowe Plants

    By R. L. Atwood

    This paper discusses the metallurgical and Manufacturing input to Merrill-Crowe plants. Topics treated are pregnant solution chemistry, clarification, degassing, zinc addition, product filtration, acc

    Jan 1, 1985

  • SME
    Design Considerations For Mining Thick Seams And Seams Lying In Close Proximity To One Another

    By J. W. Wilson, S. Nakajima, B. D. Singh

    According to the Project Independence blueprint, a 270 percent increase in coal production is expected from western coal fields compared to an increase of 100 percent for the nation as a whole. Furthe

    Jan 1, 1977

  • SME
    Design Considerations For Reclamation Purposes At Iron Mines In The Upper Midwest

    By James P. Ludwig

    While we are all aware of the need for reclamation of mine sites, few managers and engineers seem to be aware that good reclamation begins with the earliest plans for mining and processing of ores. Fa

    Jan 1, 1984

  • SME
    Design Considerations For Small Flotation Concentrators

    By J. M. Keane

    SMEThis loaner is concerned with important criteria relative to the design of small flota¬tion concentrators. For the purpose of this discussion a small flotation concentrator is defined as a facility

    Jan 1, 1980

  • SME
    Design Considerations For Structures To Be Built On Subsidence Prone Land

    By R. D. Begley

    This paper will present detailed design drawings of a flexible single floor residential superstructure proposed for both longwall and room and pillar mining conditions. All efforts were made to provid

    Jan 1, 1986

  • SME
    Design Considerations For Subsidence Control

    By M. Karmis

    Subsidence planning and control must be an integral part of mine design in order to minimize the economic impact of underground mining on the surface. Pre-calculation of surface deformations which may

    Jan 1, 1990

  • SME
    Design Considerations For The Henderson Project Tailing And Mill Process Water System ? Introduction

    By William W. Shriver

    When the Henderson Project is completed in 1975, it will become one of the Free World's largest primary molybdenum producers. The Henderson Mine will be located approximately 50 miles west of Den

    Jan 1, 1970

  • SME
    Design Considerations For The Use Of Slurry Walls As Permanent Walls For Deep Rectangular Shaft Structures In Seismic Areas?Silicon Valley Rapid Transit Project

    By Michael J. Lehnen

    Slurry diaphragm walls are commonly used as both temporary excavation support walls, and permanent structural walls, for circular shafts and long rectangular structures (such as underground subway sta

  • SME
    Design Considerations for Top-Down Wall Construction in Carbonate Rock for Ohio River Bridges—East End Crossing Tunnels

    By Charles A. Stone, Eric C. Wang

    "Top-down wall construction was selected to excavate the tunnel portal headwall areas of the ORB East End Crossing tunnel. Benefits included an expedited construction schedule realized by staging exca

    Jan 1, 2016

  • SME
    Design Considerations For Underground Structures In Rock

    By A. Bumanis, K. S. Bawa

    INTRODUCTION A rail rapid transit system called the "Metro" system is presently under construction in the Nation's Capital area. The agency responsible for the design and construction of the M

    Jan 1, 1997

  • SME
    Design Considerations of a Carbon-in-Leach Circuit at Newmont Gold

    By K. Chandrasekaran

    Carbon-in-leach (CIL) is conventionally used in gold processing operations when preg robbing components are present in the ore. The CIL process is becoming attractive even in other situations when pre

    Jan 1, 1991

  • SME
    Design Considerations Of A CIL Circuit

    By K. Chandrasekaran

    Carbon-in-Leach (CIL) is conventionally used in gold processing operations when preg robbing components are present in the ore. CIL process is becoming attractive even in other situations when preg ro

    Jan 1, 1991

  • SME
    Design Considerations When Blasting In The Proximity Of Inhabited Areas

    By S. Bozinis

    In this paper, blast design considerations and implementation that lead to reduced vibrations will be presented. In addition, blast vibration data collected during hard and semi-hard rocks blasting in

    Jan 1, 2006

  • SME
    Design Criteria For Bin Feeders ? Introduction

    By H. Colijn

    Feeders are used to provide a means of control for the withdrawal of bulk materials from storage units, such as bins, bunkers, silos and hoppers. This control function can only be performed properly a

    Jan 1, 1968