Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Application Of L-TOPS To Project Evaluation
By B. Tolwinski
Long-Term Open Pit Scheduler or L-TOPS is a new software package for evaluating, planning, and design of open pit mines. L-TOPS transforms geological, economic, and technical information about a miner
Jan 1, 1996
-
An Application Of Queueing Theory To Equipment Selection For A Large Open Pit Copper Mine
By George Hufford
An investigation is made into the applicability of queueing theory to simulating the operation of a large open pit copper mine in the southwestern United States. Actual data from a working mine was us
Jan 1, 1981
-
An Application Of Statistics To Reagent Testing
By R. Maurice King
In the operation of today's large scale ore-processing mills, it is extremely important to have some way of making an objective evalu¬ation of the performance of the available flotation reagents.
Jan 1, 1964
-
An Application of the Digital Computer to Mill Design, Research and Operation
By Ralph L. Merklin
One of the most commonly employed set of calculations in mill design and research is the material balance, known in wet beneficiation plants, as an Ore and Water Balance. For mill designers, the balan
Jan 1, 1967
-
An Application Of The Topsis Method To Solve Hydraulic Excavator Selection Problem In Mining
By M. Yavuz
Decision Making (DM) can be defined as a selection process of the best one among the alternatives sets in order to obtain goal, and mostly has an uncertain situation [7]. Every mining engineer is subj
Jan 1, 2008
-
An Application Of' Estimation Error Studies For Decision-Making Regarding Sampling Patterns On A South African Gold Mine
By Peter McKenna
Different reefs being extracted from a mine will, in all likelihood, have significantly different semi-variogram models - and these will probably vary from geozone to geozone. As errors of estimation
Jan 1, 1989
-
An Appraisal Of Accuracy Of Various Formulas For The Design Of A Simple Auxiliary Ventilation System
By Venkata S. Vutukuri
Assuming a number of discrete leakage paths and treating the airflow through leaky duct line as a series-parallel combination of airflows along the duct and through leakage paths, exact solutions for
Jan 1, 1993
-
An Appraisal Of The Total Environment At Prieska Copper Mine - Introduction
By W. Holding
Since the 1975 International Mine Ventilation Congress in Johannesburg there has been a trend in South Africa towards making the mine ventilation departments responsible for monitoring the total envir
Jan 1, 1980
-
An Approach For Instrumentation Design
By J. Sanko
When faced with the task of designing a process control system the control engineer must consider the following: 1. The type of process to be controlled and the manner in which the process must be co
Jan 1, 1981
-
An Approach for Numerical Modeling of Gob Compaction Process in Longwall Mining Mining, Metallurgy and Exploration
By S. K. Sahoo, S. K. Sharma, A. Yadav, B. Behera, G. S. P. Singh
A field representative modeling of the gob behavior is critical for the understanding of the associated mechanics of strata behavior in longwall workings. The findings of theoretical models and labora
-
An Approach for Numerical Modeling of Gob Compaction Process in Longwall Mining Mining, Metallurgy and Exploration (34166bc5-5d27-4470-9d1e-791221fa2772)
By S. K. Sahoo, S. K. Sharma, A. Yadav, B. Behera, G. S. P. Singh
A field representative modeling of the gob behavior is critical for the understanding of the associated mechanics of strata behavior in longwall workings. The findings of theoretical models and labora
-
An Approach To Computerized Open-Pit Production Scheduling
By William L. Rose
Production scheduling is an integral part of intermediate- and long-range open-pit mine planning, affecting equipment selection, manpower requirements and project economics. The development of mining
Jan 1, 1985
-
An Approach To Decrease Error And Increase Data Reliability In Drill Sampling For Gold
By F. P. Schwarz
Even in an otherwise care-fully done sampling procedure, reducing subsample weight, or splitting, when the grain size of material is too large commonly generates significant error. Such error can be e
Jan 1, 1992
-
An Approach To Environmental Problems On The Marquette Iron Range
By Ralph E. Magnuson
The quality of our environment is of great importance to all of us. Today, there is a great public concern about the degradation of our air, land, and water and the resultant slow death of our planet
Jan 1, 1970
-
An Approach To Mineral Particle -Air Bubble Interaction In Turbulent Flow Of Flotation Cell
By Shaoxian Song, Shouci Lu, Jingyon Gou, Pan Yiuwen
The calculated potential energies of interaction between hydrophobic particle of three minerals (rhodochrosite, quartz and talc) and air bubble show that the energy of hydrophobic interaction is the d
Jan 1, 1995
-
An Approach To Preparing Reclamation Permit Applications
By K. W. Grubaugh
The recently enacted federal surface mine law (P.L. 95-87) will increase further the complexity of securing a reclamation permit. This law intensifies the need to present the required reclamation plan
Jan 1, 1978
-
An Approach To Successful Development Of International Mineral Projects
By T. L. Owen
Since 1993 Cyprus Amax has brought $2.5 billion dollars of greenfield and expansion projects into production, taking it from a mid-sized domestic minerals company into a major international minerals o
Jan 1, 2000
-
An Approach To The Automation Of Concentrators
By R. E. Hamilton
Automation is a word whose meaning has been broadened by popular usage to include any labor saving device. We with restrict our usage to the replacement of human judgement by instrumental measurement
Jan 1, 1971
-
An Approach to the Classification of Weak Rock for Tunnel Projects
By Steve Klein
Weak rock is an important consideration in tunnel design and construction due to the difficult ground conditions that are often encountered. Nevertheless, when conditions are favorable high advance ra
Jan 1, 2001
-
An Approach To The Mining Design System Based On A Deposit Model
By Chen Chuanqing
The Mining design system is a CAE (Computer Aided Engineering) software and was developed as designer-oriented, interactive mode software to perform geological and mining design calculation and graphi
Jan 1, 1989