Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development Of New Process And Reagent For Flotation Of Graphite
By G. M. Rao, P. N. Deo
Graphite is soft and easily floatable but it is quite difficult to obtain high purity concentrate at coarse sizes. Chemical treatment can produce high grade concentrate but it is an expensive process.
Jan 1, 1995
-
Surface Mine Blasting Near Transmission Pipelines
Industry and regulatory agencies have requested guidance on safe blasting near transmission pipelines. The US Bureau of Mines (USBM) and Amax Coal Co. studied surface coal mine overburden blasting nea
Jan 1, 1995
-
Alberta Lake Re-Established After Draining to Mine Coal
By Sukru Sumer
East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west
Jan 1, 1995
-
Analysis Of Grinding Actions Of Ball Mills By Discrete Element Method
By Katsunori Okaya, Toshio Inoue
Application of the discrete element method incorporating the simple kinetic model of the ball-to-ball and ball-to-wall interactions enables us to visualize the details of the grinding actions prevaili
Jan 1, 1995
-
Carbon Sorption Potentialities In Thiocarbamide Gold And Silver Extraction Technology
By A. F. Raschenko, V. V. Elschin, Y. E. Golodnov
Kinetics and mechanism of gold and silver sorption from thiocarbamide solutions by activated carbon were studies using tne method of equilibrium-kinetic analysis. The intradiffusonal character of the
Jan 1, 1995
-
The Entrainment, Pressure and Flow Process of a Jet Fan Modeled in a Square Section Wind Tunnel
By Allan E. Hall, Kuda R. Mutama
Jet fan (ductless fan) ventilation in underground mines and tunnels is a subject requiring further attention. At present there are no accepted procedures or guidelines for this type of ventilation. Th
Jan 1, 1995
-
Removal of dolomite and silica from apatite by selective flocculation
By S. Mathur
The southern Florida phosphate deposits that will be mined in the future contain significant amounts of dolomite. Because high MgO levels are undesirable in phosphoric acid production, several flotati
Jan 1, 1995
-
Optimization Of The Autogenous Grinding In "Cascade" Mill At Iron Ores Processing
By Alexandr A. Abramov, Svetlana M. Angelova, Oleg P. Maljuk
In this paper the effect of the ratio of grinding and grindable size classes (ore lumps, particles and grains) and the guantity of intermediate size classes in the feed of the primary wet autogenous g
Jan 1, 1995
-
Animation Models Of Mines To Assist In Mine Planning And Production
By J. R. Sturgul
Computer simulation models of working mines can be a great benefit to mining engineers. Such models have been used in mine planning (how many trucks-shovels to have, when to add new equipment, etc.) a
Jan 1, 1995
-
The Effects Of Freezing Conditions On Rock Breakage
By S. K. Kawatra, S. A. Moffat, K. A. DeLa’O, T. C. Eisele
It was observed that the efficiency of some autogenous grinding circuits was dependent on temperature, with the energy-efficiency of the grinding process decreasing in the winter months, accompanied b
Jan 1, 1995
-
Discussion – Basics of Paste-Backfill Systems – Mining Engineering, Vol. 46, No. 10, Oct 1994, pp.1175-1178 – Brackebusch, F. W.
By R. Bouzaiene
In the paper presented by F.W. Brackebusch on the “Basics of paste backfill systems,” paste fill was presented as a backfill process that offers many advantages over other alternatives such as hydraul
Jan 1, 1995
-
Discovery of the McDonald Gold Deposit
By M. S. Enders
The McDonald gold deposit is located in the upper Blackfoot Valley in Lewis and Clark County in west-central Montana, about 65 km (40 miles) northwest of Helena and 13 km (8 miles) east of Lincoln (Fi
Jan 1, 1995
-
Competing With the Big Boys: Productivity and Innovation at the Freedom Lignite Mine
By Jack G. Pippenger
The Coteau Properties Co.'s Freedom mine is a surface operation near Beulah, ND that produces more than 13.6 Mt/a (15 million stpy) of lignite. Coteau, a subsidiary of North American Coal Corp.,
Jan 1, 1995
-
Separation Of The Components Of Flue-Gas Scrubber Sludge By Froth Flotation
By S. K. Kawatra, T. C. Eisele
To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disp
Jan 1, 1995
-
GOB Ventilation and Bleeder Systems in U.S. Coal Mines
By John E. Urosek, Timonthy R. Watkins
Room and pillar mining accounts for approximately 73 percent of the active gobs used in the United States in 1993. The Mine Safety and Health Administration conducted field investigations on six diffe
Jan 1, 1995
-
Discussion – New Size Laboratory Ball Mill for Bond Work Index Determination – Mining Engineering, Vol. 46, No.4, pp. 352-353 - Nematollahi, H.
By G. E. Agar
In the April issue of Mining Engineering there is a technical note "New size laboratory ball mill for Bond Work Index determination" written by M. Nematollahi which is very confusing. My recollection
Jan 1, 1995
-
Technology Improvements Aid Room-and-Pillar Coal Mining
By Christopher J. Bise
During the past two decades, the emphasis on technological advances in US underground coal mining has focused on longwall mining. But there also has been a steady, although less spectacular, advance i
Jan 1, 1995
-
Methane Safety Research for Continuous Miners in South Africa
By Alan P. Cook
Methane levels have been measured around continuous miners and compared with computer simulations of methane flow. A multi-channel data logger, reading continuously from six methanometers, has shown m
Jan 1, 1995
-
Baltimore Metro Northeast Extension
By Charles A. Edwards, Kenneth D. Merrill
The Construction of the Northeast Extension of the Baltimore Metro involved soft ground, compressed air tunneling. During the tunneling, gasoline and dry cleaning fluid contamination were encountered.
Jan 1, 1995
-
On-Board Electrical Diagnostic System To Improve The Availability Of Continuous Mining Machines
By J. C. Cawley, J. Sottile, J. L. Kohler
Control circuit failures contribute significantly to continuous miner downtime. The time required to put the machine back into production is a function of the time required to diagnose the problem, ob
Jan 1, 1995