Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Material Balancing and Estimation of Equilibrium Constants: Application to Solvent Extraction Tests of Rare Earth ElementsBy K. Turgeon, D. Larivière, L. Whitty-Léveillé, J. -F. Boulanger, C. Bazin
"The processing of ore containing rare earth elements leads to the production of an impure solution of these elements. The separation of the rare earths from the impurities and the production of indiv
Jan 1, 2016
-
Participative Management at the Golden Giant Mill, A Co-Ordinators PerspectiveBy K. Barr, F. Grenier, J. Hettinger
"To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build
Jan 1, 1988
-
Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper ProjectBy S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton
"Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub
Jan 1, 2013
-
A Simulation Model For Underground Roadway Development ProcessesBy Ernest Baafi
A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr
Oct 1, 2009
-
Plant Scale Trial of Isobutyl Xanthate at Raglan Concentrator Using Reference DistributionsBy Norman O. Lotter, Dominic Fragomeni, Lori J. Kormos, Guy Comeau, Antonio Di Feo
"A performance opportunity was identified for the Raglan concentrator operation by changing the selection of xanthate from Potassium Amyl Xanthate (PAX) to Potassium Isobutyl Xanthate (PIBX). This opp
Jan 1, 2009
-
The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical ProjectBy Jan E. Nesset, Phillip J. Mackey
"Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain
Jan 1, 2003
-
Capturing unrealized capacityBy M. W. Lewis
A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th
Jan 1, 2004
-
Capturing unrealized capacityBy M. W. Lewis, B. Sambirsky, J. Werner
A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh
Jan 1, 2004
-
Stratigraphic and Structural Constraints on Limestone Exploration: A Case Study from Northern New Brunswick, CanadaBy I. Dimitrov, S. R. McCutcheon
"Industrial-grade limestone is found in both the Lower Silurian La Vieille Formation and Upper Silurian LaPlante Formation of the Chaleurs Group in northern New Brunswick. Currently, between 150 000 a
Jan 1, 2007
-
Quality of Life in Remote Mining Communities: a Multiple Case Study in The Brazilian AmazonBy Silvana Costa
The quality of life in remote mining communities is a significant factor that impacts the mining industry?s ability to attract and retain high quality workers in remote areas. The rapid growth of mini
May 1, 2007
-
Expert System Technology at the Polaris MineBy G. A. Kosick, C. A. Harris
"Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr
Jan 1, 1988
-
Leaching of Bulk Flotation Concentrate as an Alternative to Treat a Complex Sulfide OreBy C. A. Sosa-Blanco
Minera Sabinas in central Mexico treats a complex sulfide ore containing galena, chalcopyrite, sphalerite and argentite as valuable minerals, and in some cases important amounts of non-magnetic pyrrho
Jan 1, 2007
-
Lac Minerals Development of HemloBy C. Patel, George H. Hope
"INTRODUCTIONThe Hemlo area is located in Northern Ontario, some 350 km east of Thunder Bay along highway 17. Hemlo is Canada's largest, recent discovery of gold ore. Three companies, Lac, Noranda, an
Jan 1, 1985
-
In Situ Measurements for Geomechanical Design of Cemented Paste Backfill SystemsBy M. W. Grabinsky
Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su
May 1, 2007
-
An Evaluation of the Rietveld Method for Modal Analysis at CANMETBy John Wilson
"The Rietveld numerical method was used to calculate the relative abundances of phases in both synthetic binary mixtures and synthetic and natural ores, using X-ray diffraction data. The results were
Jan 1, 2003
-
The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek MineBy Sergio Cattalani, David J. Kerr, Harold L. Gibson
Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13
Jan 1, 2000
-
A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine DrainageBy Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois
"Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai
Jan 1, 2004
-
A Review of Flotation Columns Application in Rougher CircuitsBy M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh
"Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut
Jan 1, 2011
-
Mechanism of Slag and Matte Formation in Copper Flash SmeltingBy Zhuo Chen, Jun Zhou, Jiemin Zhou
Samples of the reacting suspension particles were taken from the reaction shaft of a commercial flash furnace at different heights. The processes of matte and slag formation and morphology of the samp
Jan 1, 2019
-
Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, TurkeyBy C. O. Aksoy
There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary
Jan 1, 2005