Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Role of Mathematical Optimization in the Macro Design and Analysis of Particulate Processing PlantsBy F. A. Aplan, Richard R. Klimpel
This article discusses the role of mathematical optimization techniques as applied to the design and analysis of particulate processing plants. The emphasis will be placed on the macro engineering vie
Jan 1, 1991
-
Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)By D. Kump
The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.
Jan 1, 1999
-
Part 1: Wet Coarse Particle Concentration Section 1: Dense MediaBy Byron C. Hardinge, E. R. Palowitch, Albert W. Deurbrouck, David J. Akers, Edward R. Torak
During 1983, 42.2% of the 686.0 (624.3 Mt) million tons of coal reported, 289.6 (263.5 Mt) million tons were mechanically cleaned, of which 107 (97.4 Mt) million tons were cleaned by dense media (magn
Jan 1, 1991
-
Modern Coal Flotation PracticesBy Gary F. Meenan
The industrial practice of froth flotation for upgrading the quality of fine coal is a relatively complex, expensive, and inefficient process when compared to the coarse- and intermediate-size coal cl
Jan 1, 1999
-
The Quota System In Mining --- Particularly Lead And Zinc - ?Two Years of Lead-Zinc Quotas?By R. A. Young
Effective October 1, 1958, President Eisenhower imposed, by Presidential Order, fixed import quotas on lead metal and lead concentrates and also on zinc metal and zinc concentrates. He did this in res
Jan 1, 1961
-
Charge motion in a semi- autogenous grinding millBy J. A. Herbst, Z. Rogovin
In order to develop more accurate procedures for scale-up and design of semi-autogenous grinding mills through detailed mathematical models, a better understanding of the charge motion and rocklball s
Jan 1, 1990
-
AA Pad Reclamation Performance Review At Barrick’s Goldstrike MineBy K. L. Myers, R. Espell, C. Deringer
Construction of the AA Pad reclamation was completed in the fall of 2000. Seeding of the ET cover began in the late fall of 2000 and continued through May of 2001. On Saturday afternoon, June 1, 2002,
Jan 1, 2003
-
Slurry Wall Test ProgramBy Thomas J. Regan
The first stage of the Massachusetts Bay Transportation Authority's Red Line Extension Northwest, is a two-track rapid transit extension from Harvard Square in Cambridge, through three stations,
Jan 1, 1979
-
Analysis of TBM Performance and Disc Cutter Consumption in Yinhanjiwei Water Conveyance Tunnel ProjectBy Zhen-xing Diao, Feng Zhao, Ya-dong Xue
"Two important aspects of excavation performance of TBM are advance rate and cutter replacement/ring consumption, which is closed to the cost and construction duration of the project. To achieve this,
Jan 1, 2016
-
City of Los Angeles Large-Diameter Interceptor Sewer TunnelsBy Baron Miya, Keith Hanks, William Edgerton, Francis Fong
The City of Los Angeles capital improvement program includes the construction of a new 35-km interceptor sewer. This sewer will be built as a deep tunnel with finished diameters ranging from 2- to- 4
Jan 1, 1999
-
Waste Water Treatment Plant for Sewage Water in the Sharrcem PlantBy John Mastoris, Shkurta Gashi, Kostis Dragasakis, Kostas Kouklidis, Halil Berisha
Water is increasingly recognized as a critical issue for sustainable development, becoming as important as carbon to corporate responsibility and reputation. Although the cement industry’s overall ‘wa
Jan 1, 2017
-
A Computer Design Of Ultimate Pit Limit By Using Transportation AlgorithmBy Panlop Huttagosol
The use of computer models to design ultimate pit limit of an open pit mine during its feasibility study has become an emphasized procedure in mining. It is a normal practice in open pit mine design t
Jan 1, 1992
-
Design Methodology Used for the Lake Mathews Outlet Facilities ProjectBy S. Dubnewych, S. Kieffer, M. T. McRae, R. R. Redd
The seismic vulnerability of the existing outlet tower at Lake Mathews reservoir, located in Riverside County, California, necessitated the design of a new outlet facility to assure serviceability of
Jan 1, 1999
-
Electrical Resistivity Tomography In Urban Areas: A Case Study In Hania, GreeceBy I. Papadopoulos
Nowadays, geophysical prospecting is implemented in order to resolve a diversity of geological, hydrogeological and geotechnical problems. Though plenty of applications and a lot of research have been
Jan 1, 2005
-
The Origin Of Some Phosphatic Minerals In Coastal Plain SedimentsBy John K. Adams
Phosphorus may be incorporated into sedimentary rocks in at least four different ways: (1) by the accumulation of detrital mineral fragments, (2) by the accumulation of phosphatic organic debris, (3)
Jan 1, 1972
-
Environment ? Air (042e3540-9e2c-4d46-9337-11a96d924b18)By James R. Jones
The concern for air pollution goes back centuries as will be seen from this quotation : "Strife and coal, it seems, have a hand-in-hand historical relationship. It was thought by some . . . in the M
Jan 1, 1981
-
Description of the El Abra PlantBy R. Canello, J. Jenkins
El Abra has the world's largest leach, solvent extraction and electrowinning facility, The crushing plant capacity is 120,000 metric tonnes per day and the cathode production capacity is 225,000
Jan 1, 1998
-
More Than Five Things I Never Want to See in Plant DesignBy Joe Keane
DOUG HALBE: The kickoff speaker, and my unanimous choice, is Joe Keane. Joe was born in Butte, Montana, and began his association with the mining industry as an under- ground miner at age 16. Currentl
Jan 1, 1998
-
On-Stream X-Ray Analysis (c7cb97c3-d08e-4f27-bb50-02e7b661fc16)By E. Woodburn, Harrison R. Cooper, R. Putman
The key to concentrator automation is practical means for obtaining continuous assay data from concentrator streams. The technique most successfully used is x-ray fluorescence analysis. The practical
Jan 1, 1976
-
Geared Up or Wrapped Up?By Kevin DeSomber, Scott Bird
Larger grinding mills continue to utilize large gear-driven drives or electrical wraparound drives. The panel will include presenters from operations with large mechanical and electrical drives. J
Jan 1, 1998