Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Stochastic Simulation of Geology for Uncertainty AnalysisBy V. Osterholt
Sustainable development of mineral resources is based on a spatial model of the orebody that is only partly known from exploration drilling and associated geological interpretations. As a result, oreb
Jan 1, 2005
-
Thermal Stability Of Low Melting Point NaNO3-NaNO2-KNO3 Ternary Molten Salts For Thermal Energy StorageBy T. Wang
A new generated NaNO3 ? NaNO2 ? KNO3 ternary thermal energy storage system which has low melting point as 124°C and high specific heat capacity was studied for the short and long?term thermal stabilit
Jan 1, 2012
-
Improvements Seen in Acid-Mine-Drainage TechnologyBy William R. Yernberg
The Fifth International Conference on acid rock drainage (ICARD 2000) was held May 21-24, 2000, in Denver, CO. The three-day conference consisted of about 150 oral presentations and poster sessions t
Jan 1, 2000
-
Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case StudyBy D. Drymonitis, G. Gialoglou
"Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a
Jan 1, 2005
-
8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 MonthsBy Antonio Raschillà
On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p
-
How Blasthole Shock Absorbers Reduce CostsBy Jack T. Work
Spiraling costs in every segment of the open-pit mining cycle is a fact of life that every operator must reckon with. The introduction of various shock absorbing devices for rotary drilling is one rec
Jan 4, 1980
-
60 Years Of Rockbursting In The Coeur D’alene District Of Northern Idaho, USA: Lessons Learned And Remaining Issues (2002 SME Annual Meeting)By W. Blake, J. Whyatt
Sixty years of rockbursting in the Coeur d’Alene district has taught painful lessons and led to a number of practical advances in controlling rockburst hazards. This paper summarizes those lessons, co
Jan 1, 2002
-
Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build ContractBy David Hake, David Salisbury
The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT
Jan 1, 2005
-
The Expectations For Coal: Is Our Government And The Coal Industry Prepared?By M. S. Miller
With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding
Jan 1, 2004
-
Hydraulic Considerations For Leaching OperationsBy J. F. Lupo
Leaching operations combine both metallurgical and hydraulic processes to extract metals from the ore heap. In the design of leaching operations, metallurgical tests and simple hydraulic tests are oft
Jan 1, 2000
-
Missouri-Rolla’s Online Program Gains PopularityBy Tad S. Golosinski, R. Larry Grayson
Online education is not new. During the last decade, it has reached the stage where many universities offer a variety of courses, degrees and programs without any associated residency requirements.
Jan 1, 2002
-
Geographic Information Systems In Borate Exploration: A Case Study At “Old Borate”By J. R. Piper
“Old Borate,” located in the Calico Mountains east of Barstow, California, lead domestic colemanite production from 1884 through 1907. Mineral exploration at “Old Borate” in the early 1980's, e
Jan 1, 2001
-
Investigation and Abatement of Subsidence Damage at the Heltsley Residence, IndianaBy Robert A. Cummings, Madan M. Singh
In April 1984 a subsidence depression formed directly beneath a two-story frame residence, near Linton, IN, causing 2 ft of separation between the floor and walls, and damaging both the foundation and
Jan 1, 1986
-
Using Passive Treatment Systems For Mine Closure A Good Approach Or A Risky AlternativeBy J. Wagner, P. Eger, G. Melchert
In 1991, LTV Steel Mining Company decided to close an open pit taconite mine in northeastern Minnesota, using a passive treatment approach consisting of limiting infiltration into the stockpiles and w
Jan 1, 1999
-
Developing a Softwall Mining MachineBy K. S. Mortensen
The softwall mining system is a novel, new method of mining mineral deposits in soft, shallow, nonrock ground conditions. This method can mine the ore layer without substantially disturbing the exist
Jan 1, 2003
-
Tunnelling on the South East Transit ProjectBy T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Modification Of Waelz Kiln Processing Of La Oroya Zinc FerriteBy P. C. Holloway
La Oroya zinc ferrite (19.5% Zn, 26.6% Fe, 0.052% Ga, 0.075% In) was roasted with coal under conditions more oxidizing than normally used in a Waelz kiln, and the roasted residues were leached with 20
Jan 1, 2008
-
Reliability of Conventional Ground SupportBy Davorin Kolic, Harald Wagner
Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar
Jan 1, 2001
-
Correct Identification Of Chrysotile Asbestos In OresBy Allison
During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the
Jan 1, 2005
-
Coping with Boulders in Soft Ground TBM TunnelingBy Peter B. Dowden, Robert A. Robinson
Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper
Jan 1, 2001