Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, ZimbabweBy Peter Makuvise, Alain M. Bantshi
"The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w
Jan 1, 2017
-
Design, Construction and Commissioning of the Ridgeway Concentrator Regrind Circuit at NewcrestÆs Cadia Valley OperationsBy F Cesnik, P Griffin, S Green
In July 2004 a flotation concentrate regrind circuit was commissioned in the æHigh GradeÆ Ridgeway concentrator at NewcrestÆs Cadia Valley Operations. This was the culmination of two years of project
Jan 1, 2005
-
Design, Construction and Monitoring of a Secant Pile Compression RingBy Jason Weck, Alper Turan, Ali Chehadeh
"Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro
Jan 1, 2014
-
Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? IntroductionBy M. D. Scott
Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972
Jan 1, 1976
-
Design, Construction and Performance of PKC Dams on Northern TerrainBy James W. Cassie
The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros
May 1, 2003
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization ProjectBy H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Design, Construction, and Start-up of Stillwater Mining’s East Boulder ConcentratorBy P. Lefebvre, J. Sargent, K. Major, B. Darnton
"Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin
Jan 1, 2003
-
Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring MachineBy Steve Polegato, J. Coady Marsh, Gary Landry
The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne
Jan 1, 1985
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Design, Installation And Operation Of The Pinto Valley Moly Flotation ColumnsBy R. Rodgers
The Pinto Valley Concentrator of BHP Copper Inc. restarted its sulphide mining operations in September 2007 to produce copper and moly concentrates. During the plant production ramp up, the copper/mol
Jan 1, 2010
-
Design, Installation And Testing Of The No 250 Wemco Smartcell? Flotation Machine At Minera Los PelambresBy A Weber, L MacNamara, H Schreiber
Design and development of the world?s largest flotation cell was completed in 2002. This was the first 257 m3 flotation cell installed in the mineral industry and represents a major development in t
Jan 1, 2007
-
Design, Simulation and Operation of a New Generation of Column Flotation MachinesBy Gerasimenko MP
The authors consider the features and advantages of a new promising trend in mineral processing - column flotation. Design aerohydrodynamic and process characteristics of pilot-scale columns are stu
Jan 1, 1993
-
Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding TechnologyBy Lyne Côté, Jose Adante
"The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n
Jan 1, 2009
-
Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production LocomotiveBy Marc C. Bétournay
A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop
May 1, 2003
-
Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotiveBy A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté
"A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr
Jan 1, 2004
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and ShaftBy Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, UtahBy Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLOBy Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie