Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Thermodynamic Assessment of Ternary NiCrAl Alloys from Calculations to Experiments

    By R. C. Reed, L. T. Wu, H. C. Harada, K. Kawagish, R. T. Wu

    Oxidation of pure metals is a chemical reaction in which the metal loses one or more electrons, such that the atom of the metal changes from the neutral state to a positively charge ion and reacts wit

    Jan 1, 2010

  • CIM
    Evaluation of Tailings Material for the Preparation of a Low Modulus High Density Backfill for an Operating Mine

    By Dirige. A. P. E.

    A study was conducted for an operating mine to determine the appropriateness of its tailings material to be used for the preparation of a low modulus, high density backfill. The research was initiated

    Aug 1, 2013

  • CIM
    Shareholder Value in Mining: The Shifting Sands

    By Mauro Chiesa

    A. New Dictionary, Since 2007/8 Traditional concept of ?cycle? is dead A dearth of projects AND good metal prices suggests otherwise In a depletion-business, good times for any greenfields in 2-3

    May 1, 2013

  • CIM
    Microstructure and Microhardness of Friction Stir Processed AZ31b-H24 Magnesium Alloy

    By M. Fairman

    The effect of welding speed on the microstructure of friction stir processed (FSPed) AZ31B-H24 magnesium alloy was studied using light microscopy, image analysis, and microhardness tests. The grain si

    Jan 1, 2007

  • CIM
    Maximizing fuel cell test reliability

    By C. Andrews

    Fuel cell testing requires fully automated operation, on-site configuration of tests, and real-time monitoring for performance and failures. Balancing the flexibility and programmability of a test sta

    Jan 1, 2005

  • CIM
    Acid mine water treatment at Les Mines Gallen, Noranda Mines Limited

    By N. Lecuyer

    "During early 1980, pre-production work commenced at the ""Les Mines Gallen"" project, north of Noranda, Quebec. As a result of the acid mine water associated with this property, a major pre-productio

    Jan 1, 1983

  • CIM
    Mixed Integer Programming Models for Intermediate Open Pit Scheduling with Variable Slopes

    By Hooman Askari-Nasab

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. The objective of the mine plan is to maximize the future cash flows within the technical and physic

    Oct 1, 2009

  • CIM
    Productivity improvements for dragline operations using controlled blasting in a single- and multiple-seam opencast coal operation at Rietspruit, South Africa

    By W. A. Crosby, W. K. Smith, K. L. McDonald

    "IntroductionThis paper describes how the introduction of two blasting techniques and the resuItant development of new dragline digging methods have increased the productivity of single- and double-se

    Jan 1, 1983

  • CIM
    The Use of Rubber Screens at Upper Canada

    By E. J. Marcotte

    "INTRODUCTIONThe Upper Canada Mine is located at Dobie, approximately ten miles east of Kirkland Lake, Ontario.The mill contains Upper Canada's cyanide circuit and Upper Beaver's flotation circuit. Th

    Jan 1, 1968

  • CIM
    Technical investigations of iron-working remains from the French Jesuit mission of Sainte-Marie among the Hurons (1639-1649)

    By James R. Hunter, Sandra K. Zacharias, Ursula M. Franklin

    Archaeometallurgical remains can be a valuable source of information about past technological activities and, by inference, the societies that undertook them. Material traces of former metal-producing

    Jan 1, 1999

  • CIM
    Novel Application of a Gold Cyanide Selective Resin in the PGMS Industry

    By M. H. Kotze, V. Yahorava

    A gold-selective ion exchange resin, containing tributylamine groups, was developed by Mintek for the recovery of gold from cyanide leach solutions. The Dow Chemical Company and, more recently, Puroli

    Jan 1, 2014

  • CIM
    Extraction of Dimension Stone as a Co-Product of Civil Engineering Works: A Case Study

    By E. Lovera

    ABSTRACT: The current study analyzes the feasibility of an odd operation: to obtain, using a properly tailored drilling and blasting scheme, blocks suitable for the production of dimension stone from

    Jan 1, 2011

  • CIM
    Electronic Computer Applications to Petroleum Engineering

    By J. G. Debanne

    MOST company-employed petroleum engineers have in their accounting departments punch-card computers that can perform engineering calculations thirty to three hundred times faster than desk calculators

    Jan 1, 1958

  • CIM
    Energy Consumption for Iron Chloride Pyrohydrolysis: A Comparison between Fluidized Beds and Spray Roasters

    By K. Adham

    Iron chloride pyrohydrolysis (ICP) is used as an efficient way to fix iron as an oxide, for sale as a by-product or for safe disposal. Iron chloride is reacted with water at elevated temperatures to y

    Jan 1, 2006

  • CIM
    Zero Gravity Dry Environment Mineral Separation

    By A. Taylor

    This paper considers mineral processing in zero gravity dry environments typical of asteroids or comets. The electro-dynamic separation technique using pneumatic flow systems is explored. Pneumatic de

    May 1, 2001

  • CIM
    Building from the ground up in the Sahara The complexities of project execution in a developing country

    By Olivia Gamache

    When working in remote and extreme environments, projects are faced with new challenges for engineering and project execution. This is heightened when also working in countries with a developing env

    May 1, 2013

  • CIM
    Milling Methods and Costs at Eustis Concentrator of the Consolidated Copper and Sulphur Company

    By H. A. Baxter

    THE Eustis concentrator is located about nine miles southwest of Sherbrooke, on the main line of the Quebec Central railway. The concentrator is served by a side track parallel to the main line, and a

    Jan 1, 1936

  • CIM
    Hydro-Electric Power Possibilities Along the Route of the Pacific Great Eastern Railway

    By E. A. Cleveland

    A glance at the map discloses the fact that the Pacific Great Eastern railway either traverses or crosses some of the most important rivers of the province: the Squamish with its branches the Stawamus

    Jan 1, 1925

  • CIM
    How 3D Images Support Rock Engineering

    By Andreas Gaich

    COMBINED 3D IMAGES _ Highly detailed 3D geometry _ Identification of fine fractures together with a general impression of the situation _ Dealing with unfavourable outcrop geometries

    May 1, 2009

  • CIM
    East Boulder Mine - A River Runs Through It

    By Ken J. Brouwer

    Stillwater Mining Company commenced construction and development of the East Boulder underground mine in 1998. This new PGM mine is situated adjacent to the East Boulder River approximately 35 miles s

    May 1, 2002