Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Comparative Studies In The Mechanics Of Grouted Roof Bolts

    By Stephen P. Signer

    To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure

    Jan 1, 1988

  • SME-ICGCM
    Estimation of in-situ material strength

    By Danell. R. E.

    A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com

    Jan 1, 1989

  • SME-ICGCM
    Failure mechanisms in ultra-close seam mining

    By Yingxin Zhou

    Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie

    Jan 1, 1989

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME-ICGCM
    Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, Utah

    By J. R. Koehler

    Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie

    Jan 1, 1996

  • SME-ICGCM
    The Development and Application of Polyurethane Injectable Cable Bolts

    By Dakota D. Faulkner

    Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United

    Jan 1, 2012

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Innovative Secondary Support Technologies For Western Mines

    By Thomas M. Barczak

    With the development of the shield support, the primary requirement for successful ground control in longwall mining is to provide stable gate road and bleeder entries. Wood cribbing has been the domi

    Jan 1, 1996

  • SME-ICGCM
    Direct determination of failure surfaces in earth slopes

    By S. L. Huang

    The location and shape of potential failure surfaces in soil slopes were directly determined based on the stresses induced in the soil mass and the strength of the soil itself. Stress calculations wer

    Jan 1, 1989

  • SME-ICGCM
    Deformation and failure-time prediction in rock mechanics

    By Barry Voight

    The law [ ] where [ ] is a measurable quantity such as strain and A and cu are empirical constants, describes the behavior of materials in terminal stages of failure under conditions of approximately

    Jan 1, 1989

  • SME-ICGCM
    Assessment and Mitigation of Subsidence Effects on a Tall Self-Supporting and Free-Standing Communication Tower

    By Yi Luo

    A longwall mining operation went under a tall, self-supporting and free-standing wireless communication transmission tower. In anticipation of that the ground subsidence process might affect the trans

    Jan 1, 2008

  • SME-ICGCM
    Sub-Surface Cracks Due To Disc Cutter Spacing For Improved Rock Breakage And Ground Control (9409c703-a463-4470-b9b9-4f86b64581d4)

    By N. I. Aziz

    The importance of using disc cutters for rock excavation is reflected by their wide application in hard rock cutting machines such as tunnel boring machines and raise borers. The forces involved in th

    Jan 1, 1992

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Regional Two-Seam Stress Analyses At The Deer Creek Mine (58f624e3-fdec-4f72-b0ef-8ec1e65d9bd2)

    By Hamid Maleki

    A geotechnical monitoring program has been implemented at Energy West Mining Company for enhancing site-specific evaluation of longwall stress conditions. This program consists of underground measure

    Jan 1, 2009

  • SME-ICGCM
    Coal Pillar Strength Based On The Ground Reaction Curve - A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME-ICGCM
    The Influence Of Massive Sandstones In The Main Roof On Longwall Support Loading

    By A. M. Richardson

    The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d

    Jan 1, 1996

  • SME-ICGCM
    Three-Seam Stress Analyses at Bowie Mines, Colorado

    By Hamid Maleki

    In this paper, the authors present a review of data gathering programs and stress analyses for improving mine layout designs at BRL mines located near Paonia, Colorado. BRL and other companies have

    Jan 1, 2007

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    Investigation of Some Alternatives to Timber Posts and Cribs

    By Gavin J. Faulkner

    This paper presents an investigation of some alternatives, and improvements to timber posts and cribs. The purpose is to find a cheaper, better, easy to install, and effective means to replace or impr

    Jan 1, 1986

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995