Search Documents

  • SAIMM
    Separation Performance Of Raw Coal From South Africa Using The Dense Gas-Solid Fluidized Bed Beneficiation Technique

    By J. He

    The separation performance of a raw coal sample from South Africa based on the dense gas-solid fluidized bed beneficiation technique was investigated. Analysis showed that the raw coal sample distribu

    Jul 1, 2013

  • NIOSH
    OFR-5(1)-77 Comprehensive Ground Control Study Of A Mechanized Longwall Operation - Final Report - Volume I

    Under contract from U. S. Bureau of Mines, Harza Engineering Company in cooperation with Eastern Associated Coal Corporation, conducted a ground control study of two mechanized longwall panels at the

    Jan 1, 1976

  • NIOSH
    OFR-68-73 EM Location System Prototype And Communication Station Modification (3f90e3fe-7df3-4a30-87c7-cb58a9840560)

    A prototype EM Location System was fabricated and tested at the Geneva Mine near Dragerton, Utah. This system consisted of six manpack transmitters and six manpack receivers covering the frequency ban

    Jan 1, 1973

  • AUSIMM
    Mineral Matter in Australian Bituminous Coals

    The mineral matter has been isolated from a selection of Australian bituminous coals using low temperature (radio-frequency) oxidation or hydrogen peroxidation techniques and the species present ident

    Jan 1, 1978

  • NIOSH
    Specialized Fortran Computer Programming And Analysis Services To Upgrade Capability Of MFIRE Program - Introduction

    By Xinquan Zhou, Rudolf E. Greuer

    MFIRE, written in Fortran 77, is a computer program for ventilation state simulation in the steady state or transient state condition. It can be applied for the calculation of normal ventilation syste

  • AUSIMM
    Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.

    By Hemingway P, Boag J

    Major operating aspects of the Mary Kathleen Uranium Ltd. treatment plant are discussed with partkular reference to those which are peculiar to this operation.Problems associated with the production o

    Jan 1, 1961

  • SME
    Feasibility And Implementation Of Shield Machine Tunnel Passing Through An Operating Airport Runway

    By Hongjie Yang

    The No. 10 metro line of Shanghai city is 36 kilometers in length and will pass through the operating airport runway by using tunnel boring machine with earth pres-sure balance mode. Although there ar

  • AUSIMM
    Performance of Model Predictive Control on the Crushing Circuit at Sishen Mine

    By E K. Leeka

    Process control limitations have led to suboptimal performance of the crushing section of Sishen MineÆs Jig Plant. The performance of the PID (proportional-integral-derivative) controller implemented

    Aug 12, 2013

  • AIME
    The 125th Meeting Of The Institute

    THE 125th meeting of the Institute was held in New York, Feb. 20-23, 1922, inclusive, and was the most successful annual meeting of the Institute ever held; there was a larger registration, there were

    Jan 3, 1922

  • NIOSH
    OFR-42(2)-74 Protection And Troubleshooting Of Coalmine Electrical Cables - Continuous Miner Cable Reel System Design - I Introduction

    Electrical trailing cables are frequently damaged in usage, especially on continuous minors, and because of their weight and damaged condition present a safety hazard to personnel required to handle t

    Jan 1, 1972

  • NIOSH
    OFR-143-77 Recommendations To Improve Premining Investigations In Metal And Nonmetal Mining ? Introduction

    Mining and the related extractive and processing industries are chiefly responsible for America's high standard of living. Enormous quantities of sand and gravel, limestone, copper, iron and a my

    Jan 1, 1977

  • NIOSH
    OFR-50-74 Air Curtain Respiratory Protection Device - 1 Introduction

    By T. G. Donnelly

    This final report summarizes the prototype development and testing of an air curtain respirotory protective device under Bureau of Mines Contract HO122087. The air curtain respiratory protective devic

    Jan 1, 1973

  • DFI
    Minipiles In Soft Marine Deposits Rescue Sinking Warehouse

    By Bruno Gemmi

    A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c

    Jan 1, 2011

  • AIME
    Another Big Annual Meeting Assured

    By AIME AIME

    FIVE days, extending from Monday, Feb. 18 to Friday, Feb. 22, inclusive, will be required for the annual meeting this year. The first fours days will be devoted to reading and discussion of papers, ge

    Jan 1, 1929

  • SME
    Homestake’s McLaughlin mine : One of the largest US gold mines comes onstream in 1985

    Introduction The Homestake Mining Co. has always been big on gold. After 108 years in the business, the company and its principal product are almost synonymous. The relationship continues. On Sept.

    Jan 1, 1986

  • NIOSH
    OFR-37-72 Development Of An Air Quality Simulator For Coal Mines - Foreword

    By G. E. Geiger

    The purpose of this research was to develop a computer simulator fur predicting the air quality in existing coal mines as well as a design aid for developing new mines. In addition to the air quantity

    Jan 1, 1972

  • NIOSH
    RI 7168 Investigation Of Operating Variables In The Attrition Grinding Process

    By Martin H. Stanczyk

    Bench scale, laboratory batch attrition grinding tests were made of a coarse commercial kaolin in a stainless steel, 5-inch-diameter attrition grinding machine to study the effect of a number of basic

    Jan 1, 1968

  • NIOSH
    RI 9089 - Extended Bumper Designs for Large Haulage Trucks

    By Stephen A. Swan

    This Bureau of Mines report discusses research to analyze and evaluate extended bumper systems in order to determine the degree of protection provided to equipment operators in the event of rear-end c

    Jan 1, 1987

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • SME
    Tunnel Excavation Grand Coulee Third Power Plan

    By D. J. Duck

    INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos

    Jan 1, 1997