Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Emerald Mining in AfghanistanBy Antoni Kalukiewicz
From 1997 through 2000, a team of Polish experts headed by the author studied the prospects of mining newly discovered emerald deposits in Afghanistan. This article describes the scheme for mechaniza
Jan 1, 2005
-
Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.By Seal. Thom
Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest
Jan 1, 2008
-
TECHNICAL NOTE - Comparative Study of the Vacuum Filtration Behavior of Iron Ore Concentrate SlurriesBy C. Hosten, K. V. S. Sastry, D. J. Kawulok-Englund
Introduction Since the last decade the iron ore processing industry has undergone drastic changes from supplying screened and natural ores to manufacturing tailored concentrates and pellets. Increase
Jan 10, 1983
-
Recent Advancements In Slurry Shield TunnelingBy Yoshihiro Kawarabata
INTRODUCTION With only about 30% of Japan's entire population served by sewer systems at the end of 1980, extensive sewerage construction programs have been implemented. As major sewer network
Jan 1, 1983
-
High Pressure Water Jet Assisted TunnelingBy Russell Miller, Fun-Den Wang
High Pressure Water Jet Assisted Tunneling The high pressure water jet assisted tunneling project was conducted in a granite quarry near Skykomish, Washington, approximately 90 miles east of Seattl
Jan 1, 1976
-
Eight problems examined that point out serious inadequacies in testing for drug useBy James L. Weeks
Introduction This paper attempts to summarize some of the major criticisms of drug testing. Eight problems with drug testing are discussed. These are: • It does not measure something employers have
Jan 11, 1987
-
An Assessment Of Engineering Noise Controls At A Talc Processing PlantBy E. R. Spencer
National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi
Jan 1, 2008
-
Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension TunnelsBy Christophe Bragard
The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project
Jan 1, 2008
-
A Novel Approach To Flotation Cell DesignBy P. Koh
A novel approach incorporating computational fluid dynamics (CFD) and flotation modelling has been used for investigating flotation cell designs. CFD modelling has increasingly been employed to enhanc
Jan 1, 2011
-
Discover mining?s history at Arizona Mining and Mineral MuseumWhile SME is hosting its Annual Meeting at the Phoenix Convention Center, Feb. 28 to March 3, one of the finest collections of mining history will be on display just 15 blocks away at the Arizona Mini
Jan 1, 2010
-
An Improved Hydrometallurgical Route For Tellurium ProductionBy A. Robles-Vega
In recent years, tellurium has been extensively used in the manufacture of semiconductor materials. For this type of application, high-purity tellurium is required. Selenium, lead and silicon are usua
Jan 1, 2009
-
Rock Melting Subterrenes--Their Role In Future Excavation TechnologyBy Charles A. Bankston, John C. Rowley, Robert J. Hanold, Joseph W. Neudecker
The basic concepts and processes of soil and rock melting as applied to excavation technology are reviewed. The electrically heated, small diameter prototype penetrator development sequence is present
Jan 1, 1974
-
Building Human Resources Through Systematically Designed InstructionBy R. E. Mclvor
This is an update of an original dissertation on this topic by Lavallee, McIvor and Stolovitch (1992). A step-by-step, technical procedure used to measure and improve the performance of plant grinding
Jan 1, 2008
-
Michael Karmis: An Interview With the 2002 SME PresidentYour thoughts on the current status of the global minerals industries? The global economic, technological, social and political changes of the last two decades of the 20th century resulted in the e
Jan 1, 2002
-
Potential linkage between thermal degradation and mineral magnetic properties of Cu-rich chimneys in the Southwest PacificBy Jai-Woon Moon, Wonnyon Kim
Deep-sea hydrothermal vents (hereafter chimneys) are commonly found on the new crust forming along divergent plate boundaries. Related to the chimney cycle from birth to death, it is hard to define th
Sep 1, 2014
-
Some Approaches And Methods For Real-Time DPM Ambient Monitoring In Underground MinesBy A. D. S. Gillies
Diesel engine particulate matter pollution is a matter of concern currently in underground mines worldwide. A number of real-time Diesel Particulate Matter (DPM) monitors have been developed in recen
Jan 1, 2012
-
Waste Dump Site Selection By Using Fuzzy VikorBy A. Yazadni-Chamzini
Considering the nature of open pit mines, harvest volume, it usually is required to remove a lot of waste to access to mineral planned grade. So, one of the most important part of open pit mines desig
Jan 1, 2012
-
More Than 1,200 Exhibitors on Hand at MINExpo 2004By Georgene Renner, William R. Yernberg, Steve Kral
Allmand exhibited its LSC 100Light Sequence Commander, the mining industry’s first automatic lighting and command control system. The system is available with all of Allmand’s portable light towers.
Jan 1, 2004
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu