Search Documents

  • ISEE
    Construction of Free Faces in a Single Event

    By Iván E, Alex Araya Jofre, Jean Guiroux Toro, Eduardo Valdés Guerra

    Currently, it is important for companies to have controlled mining operations and adhere to production schedules. To achieve this, one of the key factors is maintaining high reliability in the P&T pro

    Jan 26, 2026

  • SME-ICGCM
    Truss Systems For Longwall Tailgate Support - Update

    By John C. Stankus

    At the 13th Conference on Ground Control in Mining, a paper was presented detailing a successful test in which a new truss system was utilized, in lieu of wood cribs, for tailgate support in the Pitts

    Jan 1, 1995

  • SME
    Monitoring Reclaimed Mine Land For Stray CO2 Hazards

    By M. Moagabo

    CO2 emissions from carbonate laden reclaimed mine spoil has been shown to pose a hazard to residents in homes built on or adjacent to such land. The objective of this project was to develop a soil CO2

    Jan 1, 2012

  • DFI
    Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test Data

    By Ramin Motamed, Joseph A. W. Toth

    Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte

    Jan 1, 2018

  • AUSIMM
    Experiment of Improving the Quality and Decreasing the Impurity of Titanium Concentrate in Panzhihua Mine in China

    Experiment of Improving the Quality and Decreasing the Impurity of Titanium Concentrate in Panzhihua Mine in China

    Sep 13, 2010

  • AUSIMM
    Risk "Thinking" for Australian Tunnelling

    A paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in

    Jan 1, 2008

  • SME
    Doing It All: Cut, Crush, And Load With One Machine Wirtgen Surface Miner

    By D. van der Veen

    Mining companies and contractors are looking at Wirtgen Surface Miners to provide flexibility at their operations. Wirtgen Surface Miners have been used in the surface mining industry for over fifteen

    Jan 1, 2002

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • ISEE
    Evaluating Airblast Damage Complaints

    By Lawrence W. Gubbe

    Air blast associated with detonation of explosives in mining, construction or military applications is often responsible for complaints by people who live or work in the vicinity of the activity. Most

    Jan 1, 2004

  • DFI
    Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette Construction

    By Thoedtida Thipparat

    The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord

    Jan 1, 2006

  • AUSIMM
    Study on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite Ore

    Study on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite Ore

    Sep 13, 2010

  • SME
    Drainage Ph, Acid Production, And Acid Neutralization For Archean Greenstone Rock

    By K. A. Lapakko, D. A. Antonson

    Fourteen samples of pyrite-bearing Archean greenstone rock (d < 6.35 mm, 0.04% < St < 1.22%) were characterized (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing.

    Jan 1, 2002

  • SME
    Discussion - Commercialization of eastern US oil shales — a review - Technical Papers, MINING ENGINEERING, Vol. 97, No. 12, December 1985, pp. 1381-1385

    By V. Rajaram

    R.K. Leininger, N.R. Hasenmueller, and D.D. Carr The content of the paper by V. Rajaram does not fulfill the expectations of the title. But Rajaram submitted the article in October 1983, and he cou

    Jan 10, 1986

  • IIMP
    AG-DAS: la siguiente generación del método geofísico de polarización inducida en modelamiento geofísico tridimensional

    By José Arce

    El sistema AG-DAS entró en operaciones en 2015 y su aplicación tiene diversas ventajas sobre el método de polarización inducida convencional. El concepto del sistema fue el uso de múltiples receptores

    May 22, 2019

  • IIMP
    Sistema de gestión de demanda y consumo de energía eléctrica

    By Jorge Meza

    El presente texto señala la aplicación del sistema de gestión de demanda y consumo de energía eléctrica en la fundición de Southern Perú. El sistema está compuesto por un módulo predictor de demanda

    Sep 24, 2008

  • CIM
    Biological Sulphide Production for Process and Environmental Applications

    By Lyn Jones, Mike Bratty, Rick Lawrence, David Kratochvil

    "The treatment of water is required at many mining operations to remove metals and prevent the discharge of contaminated water to the environment. In other cases, water treatment is used to provide be

    Jan 1, 2006

  • SAIMM
    Manufacturing Of Anhydrous Zirconium Tetrafluoride In A Batch Reactor From Plasma-Dissociated Zircon And Ammonium Bifluoride - Synopsis

    By M. M. Makhofane

    Anhydrous zirconium tetrafluoride can be used as a precursor for the manufacturing of nuclear-grade zirconium metal. This can be done by fluorinating plasma-dissociated zircon with ammonium bifluoride

    Jan 1, 2012

  • IIMP
    Optimisation of Crushing and Grinding Circuits Using Steady-State Simulation

    By C. A. Brown

    "Steady-state simulation has been used for over 20 years to optimise the operation of crushing and grinding circuits. Throughout that period continuing comminution research has been the basis for impr

    Sep 12, 2005

  • AUSIMM
    Avoid Average Design in Processing Plants

    The quantity, quality and detail of project information increases as project development moves from initial scoping level studies, to pre-feasibility and option studies, then definitive feasibility st

    Jan 1, 2004

  • SME
    Improving Truck-Shovel Energy Efficiency Through Discrete Event Modeling

    By K. Awuah-Offei

    Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The

    Jan 1, 2012