Search Documents

  • DFI
    Underpinning The Existing No. 1 Subway Line At The World Trade Center

    By Richard Crockford

    The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne

    Jan 1, 2008

  • SME
    Building Better Haul Roads: Designing For Structural Strength

    The structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo

    Jan 1, 2011

  • SAIMM
    Interaction Of Mgo-Mgr2o4(R: Al, Cr, Fe) Refractories With SO2-Containing Gases

    By N. Z. Fotoyi

    Keywords: MgO-MgR2O3 refractory, SO2-containing gases, chemical attack The reaction mechanisms occurring when MgO-MgR2O3 refractories are exposed to SO2-containing gas atmospheres were examined. T

    Jan 1, 2011

  • AUSIMM
    Resource Estimation Practice, Macraes Gold Project

    By M Stewart

    In January 1994, Macraes Mining Company started a new phase of exploration to find additional resources along strike and down dip of identified resources for a mill that was being expanded from 2.1 Mt

    Jan 1, 1997

  • CIM
    Exploration activities and results for the Fort a la Corne diamond project, Saskatchewan

    By Brent C. Jellicoe, Phil Robertshaw, J. Murphy, Peter Williamson

    Kimberlites and associated diamonds have been the focus of extensive exploration in central Saskatchewan since 1988. During 1989, Uranerz Exploration and Mining Limited identified 71 shallow magnetic

    Jan 1, 2001

  • IIMP
    Geología del yacimiento pórfido cuprífero Escondida, Región Antofagasta, Chile

    By Miguel Rutti

    El presente trabajo señala la geología, litología y mineralización del yacimiento minero El Tapado del distrito Yanacocha, situado al norte de Cajamarca. Este se encuentra conformado por diferentes de

    Apr 22, 2003

  • SME
    Practical Application Of A Partial Cab To Reduce The A-Weighted Sound Level At The Operator’s Station On Surface Drill Rigs (16e0ea79-d925-4b2c-a99c-4b4744e63b41)

    By P. Jurovcik, D. Yantek, D. Ingram

    The National Institute for Occupational Safety and Health (NIOSH) identified hearing loss as the most common job-related disease in the United States in its 1996 National Occupational Research Agenda.

    Jan 1, 2007

  • SAIMM
    Design Of A Modern Large Capacity FeNi Smelting Plant

    By J. Kempken, R. Degel, J. Kunze, R. König

    The FeNi technology is currently dominated by high-power submerged arc furnaces, often designed as smelter as "two-inline-solution". To achieve the intended high efficiency, state-of-the-art design in

    Jan 1, 2007

  • SAIMM
    Refining Testwork On Crude Magnesium Produced In The Mintek Thermal Magnesium Process

    By M. Abdellatif

    Keywords: Magnesium, pyrometallurgy, Mintek Samples of crude magnesium produced by the Mintek Thermal Magnesium Process were refined in two stages. The first stage consisted of co-melting of batc

    Jan 1, 2006

  • NIOSH
    RI 9425 - Relationship of Coal Seam Parameters and Airborne Respirable Dust at Longwalls

    By S. J. Page, R. A. Jankowski, J. A. Organiscak

    The U.S. Bureau of Mines investigated the relationship of bituminous coal seam parameters and the amount of airborne respirable dust generated at longwalls. Dust and coal samples were obtained from 20

    Jan 1, 1992

  • NIOSH
    RI 8759 Alumina Miniplant Operations - Overall Mass Balance for Clay-HCI Acid Leaching

    By Dwight L. Sawyer

    To provide technology that can help decrease the dependence of the U.S. aluminum industry on imported bauxite, the main ore of aluminum, the Bureau of Mines is investigating the extraction of aluminum

    Jan 1, 1983

  • AUSIMM
    Petrographic Notes on Mineralised Hydraulic Breccias from the Hauraki and Taupo Epithermal Metallogenic Provinces

    On the basis of field observation, four principal styles of hydraulic breccia are recognised, and their characteristic features noted. In practice, hybrid styles are most commonly encountered. Numerou

    Jan 1, 1987

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • AUSIMM
    The Mine Labour Problem-Wages, Contract or Tribute

    The labour question is one that has caused mine managers much thought and anxiety and is likely to continue to do so as long as human beings exist. The difficulty is to devise some arrangement whereby

    Jan 1, 1901

  • AUSIMM
    Land Reclamation at Waihi û Principles

    By R B. Stewart

    Where pasture production is the intended land use of the areas to be reclaimed, the creation of a suitable growing +medium is a major objective. To achieve this land reclaimers require a sound underst

    Jan 1, 1991

  • SME
    Liner System Protects Oils Sands’ Tailings Area

    Syncrude Canada produces a large part of Canada’s crude oil supply. The company processes about 225,000 bbl/day. The oil produced is used for jet and automobile fuel, home heating oil, plastics and

    Jan 1, 2000

  • SME
    Quarry Expansion – Sustainable Management of Natural Aggregate

    By M. L. Tucker, William H. Langer

    Many countries, provinces, territories and states in the European Union, Australia, Canada, the United States and elsewhere have begun implementing sustainability programs. Most of those programs, ho

    Jan 1, 2004

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • SME
    Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

    By James J. Kabat, James A. McDonald

    Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat

    Jan 1, 2007

  • AUSIMM
    Metallurgical Effects Associated with the use of Cemented Backfill at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited

    The addition of cement to underground backfill at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill commenced in 1967. A deterioration in metallurgical performance at

    Jan 1, 1971