Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Coal Resource Planning in the Hunter Region

    By Short KC

    The Hunter Region, with a major part of the coal resources of New South Wales and a long history of coal mining, has experienced a rapid expansion of coal resource development in recent years. Whi

    Jan 1, 1987

  • AUSIMM
    Development of a rail-running pipe conveyor for the iron ore industry

    By M Carr, C Wheeler, M Lurie, B Chen

    The demand for steel products in modern society is prompting the iron ore industry to optimise their operations to ensure sustainability of fines and lump products. One of the key components in the ir

    Nov 8, 2021

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    An Investigation of the Corrosive Impact of Groundwater on Rock Bolts in Underground Coalmines

    By P Craig, A Crosky, P C. Hagan, E Elias, B Hebblewhite, S Saydam, D Vandermaat

    "Premature failure of rock bolts has been recorded at twelve underground coalmines over the past 15 years in Australia. Over the last four years, UNSW Australia has been conducting an Australian Resea

    Nov 5, 2014

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Laboratory Studies in Comminution: Part V Simulation of an Industrial Rod MIll Product

    It is possible to closely simulate the product sizing distribution from an industrial rod mill by the correct choice of parameters in laboratory batch milling. For laboratory batch rod milling, change

    Jan 1, 1998

  • AUSIMM
    Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical Methods

    By A Garvie, D Kentwell, J Chapman

    "Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi

    Jul 10, 2012

  • AUSIMM
    Outside the Dyke Bulge - The A1 Gold Mine Extension, Gaffneys Creek, Victoria

    By D J. Clark, R F. Wright, M D. Goodz

    The A1 Gold Mine is a Devonian-age narrow vein high-grade gold deposit located 115 km east of Melbourne. The mine operated almost continuously from 1861 to 1992 producing 442 334 ounces of gold (13.8

    Jan 1, 2009

  • AUSIMM
    The Filblast Cyanidation Process

    By Bodnaras G. E, Sceresini P. A

    The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th

    Jan 1, 1994

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    Future Mining - Workers' Skills, Identity and Gender When Meeting Changing Technology

    By J Johansson

    The aim of this paper is to discuss how to form work and organisations in the mines of the future. The Kiruna underground iron ore mine in the far north of Sweden is used as an example on how technica

    Jan 1, 2008

  • AUSIMM
    Some Comments on How Mining Departments and Schools Can Survive a Cyclic Downturn

    By S Thomas, E Grimsey

    Mining education in Australia has undergone another cyclical downturn over the past five years and several departments have been discontinued while others are still teetering on the brink of destructi

    Jan 1, 2004

  • AUSIMM
    Designing Flotation Circuits for High Fines Recovery

    By D C. Curry, M F. Young

    Many flotation operations need to improve liberation to increase recovery, yet often plant operators are concerned that finer grinding will produce æslimesÆ with low flotation recovery. Yet simple cir

    Jan 1, 2005

  • AUSIMM
    A Three-Dimensional Model of MuckpileFormation and Grade Boundary Movement in Open Pit Blasting

    By Kavetsky A

    In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits, this is largely dependent on muckpile shape and looseness with

    Jan 1, 1989

  • AUSIMM
    Development of Newmont's Minahasa Gold Mine in Indonesia

    The green field discovery of a two million ounce high-grade refractory gold ore deposit in the Indonesian Province of Sulawesi Utara, led Newmont to utilise its proven technical expertise in dry grind

    Jan 1, 1997

  • AUSIMM
    Geochemical Assessment of Mine Waste Materials and Prediction of Final Pit Lake Water Quality at a Proposed Gold Mine in Mongolia

    By I Swane, R Rait, A Robertson

    Geochemical assessment of mine waste materials prior to commencement of a proposed mining operation is a fundamental component of mine feasibility studies and the regulatory approvals process. Static

    Sep 29, 2013

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Metallugical Plant ù Have We Run Out of Developments?

    I have headed this paper with a question and for the impatient among you ûthe answer is no we have not run out of developments but, and it is a big æbutÆ, we need to be innovative and ahead of the gam

    Jan 1, 2002

  • AUSIMM
    Challenges in Modelling Large Complex Orebodies at the George Fisher North Mine

    By M Haydon

    How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?

    Jan 1, 2006