Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reaction Kinetics Of Ferrous Regeneration For Alternate Anode Reaction Technology
By E. A. Sarver
The Fe(II) regeneration process is an important aspect of Alternate Anode Reaction Technology (AART) for copper electrowinning (EW). In AART, Fe(II) is oxidized to Fe(III) at the anode during EW, and
Jan 1, 2007
-
Mystery Of The Missing Grade And Recovery
By S. Ripke
Between 2002 and 2004, the performance of a six million ton per year iron ore beneficiation plant dropped significantly. In a classic case of “who done it,” was it the mine, the concentrator, an ore c
Jan 1, 2007
-
TRI-FLO: A Multistage High Sharpness Separation Process That Opens To New Applications
By G. Ferrara
During several years of operation in Europe, South Africa and other countries, the Tri-Flo has demonstrated to represent a substantial improvement of the dense medium dynamic separation systems. The r
Jan 1, 1993
-
The Safety Performance In The Tunneling Industry
By Richard Snyder
Secretariat of the Coal Mining and Mining Executive Committees' of the National Safety Council (NSC) and Manager of the memberships to both Mining Sections; Senior Consulting Safety Engineer, NSC
Jan 1, 1997
-
Sustainable Change of Coal Mining Regions
By J. Kretschmann
According to the model of product life cycles, the global coal mining industry is in the stagnation phase. The coal demand of the main consumer, China, has peaked in 2013 and is slowly declining. The
Jan 1, 2019
-
Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.
By V. Galla
Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding
Jan 1, 2011
-
The Hallandsås Dual Mode TBM
By Werner Burger
The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third at
-
Design Evaluations for the San Vicente Pipeline Tunnel
By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein
The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab
Jan 1, 2005
-
High Performing HMA Design Optimization
By O. F. Brown
The use of quality materials (aggregates and asphalt binder) in optimal proportions is the key to producing optimally performing hot mix asphalt (HMA). The Superpave mix design standard in the US intr
Jan 1, 2012
-
Using Bucket Force/Torque Feedback For Control Of An Automated Excavator
By X. Shi
This paper presents design and implementation details of a fuzzy-behavior-based controller for an automated excavator. The robotic excavator is equipped with sensors, actuators and an embedded control
Jan 1, 1997
-
Convection Mechanisms For Geothermal Heat Exchangers In A Vertical Mine Shaft
By R. Thornton
Montana Tech is located in the historic mining town of Butte, MT and is adjacent to the Orphan Boy mine. This abandoned underground mine will be the heat source for a down-hole heat exchanger (DHE)/he
Feb 27, 2013
-
Sustainability For Nature And Mankind
By M. Javier
Defining the concept of sustainability is an important step for industry and society. It is necessary in order to clarify what it means when debunking the many misinterpretations pervasive in differe
Jan 1, 2012
-
Influence of Rock Mass Properties on Performance of Hard Rock TBMs
By Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh
Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec
Jan 1, 2005
-
Approach to Selecting Research and Development Investment Projects in Mining - SME Annual Meeting 2025
By Antonio Nieto, Jesus Castillo
Research and Development (R&D) departments in the mining sector are essential for creating new solutions on productivity, safety, and sustainability. Nevertheless, the selection of R&D projects is com
Feb 1, 2025
-
The Cost And Benefit Of The Phase 2 Investigation For The Reach 4 Tunnel, How A Roll Of The Dice Came Up BIG In Las Vegas
By Ray Brainard
The subsurface investigation for the Reach 4 Tunnel was expected to be completed in a single phase. This assumed that data from two nearby previous tunnels, combined with limited new subsurface inform
-
A Discussion On TBM Cutter Change Time And Cutter Life
By E. Farrokh
Estimation of the cutter life and cost is a part of evaluating performance for a hard rock TBM in any project. Various approaches has been proposed for calculation of disc cutter life in various rock
Feb 27, 2013
-
Evaluation Of Capillary Rise Methods For Determining Wettability Of Powders (5db810bc-2051-4544-80b4-3fdee5f4e379)
By R. L. Wolfrom, R. Hogg, S. Chander
A gravimetric method for measuring rates of capillary rise in powders was explored. Methods to improve reproducibility and consistency of the results were investigated. In particular, the effects of
Jan 1, 2002
-
DPM dispersion study using CFD for underground metal/nonmetal mines
Diesel Particulate Matter (DPM) is considered carcinogenic after prolonged exposure. With increasing use of diesel-powered mining equipment in underground mines, miner?s exposure to DPM has been incre
Jan 1, 2009
-
Identifying and Controlling Heat-Induced Health and Safety Problems in Underground Mines
By M. Sunkpal, K. C. Kocsis
"An underground environment with high air temperature and humidity conditions generated from various heat and moisture sources can significantly affect the thermoregulation processes of the human body
Jan 9, 2017
-
Problem of Tunnel Construction in Himalayan Region: An Actual Encounter
By M. D. Khattar
Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr
Jan 1, 1999