Effect of Sample Density and Configuration on the Accuracy of Reserve Estimation (Abu Tartur Area, Western Desert, Egypt)By Rashad MZ
The evaluation of ore deposits consumes much effort, cost and time, hence research work must aim to minimize these inputs with no loss of accuracy. The present study is devoted to assess the optimum
Jan 1, 1987
-
How to Deal Effectively with the Media, Public, and GovernmentExternal pressures are being exerted on busi- ness, and especially the mining and energy in- dustries, as never before. These pressures are burdensome, they emerge in unique forms, and they constitu
Jan 1, 1978
-
What Gives a Shoreline Heavy Mineral Potential on the Swan Coastal Plain?By Deverux M
Heavy mineral deposits accumulate on shorelines with interrupted sediment input. Beach deposits, which form on shallowly dipping coastal plains, are most favourable. However, shallow shelves seawa
Jan 1, 1986
-
Management of the Outburst Risk in the Southern Coalfield, New South WalesCoal mining in the Bulli seam in the Southern Coalfield in New South Wales has experienced the dangers of outbursts of coal and gas. These incidents present a major risk to the safety of mine workers
Jan 1, 2003
-
Integrating Environmental Factors into Mining ProjectsThis paper discusses a number of examples of how environmental factors have been incorporated into the water management aspects of mining projects. One example is the Kingston Lignite Project in t
Jan 1, 1987
-
Review of the Mobile Miner at Isa MineThe search for an efficient and economic machine to excavate hard rock continues. Development of the Robbins Mobile Miner commenced in 1983 with the formation of a joint venture between Mount Isa
Jan 1, 1988
-
Prediction of Rock Mass Properties Ahead of Tunnel Face Using Drilling ParametersBy K-S Kim, C-Y Kim, D-G Kim
In tunnel construction or other underground construction, a detailed knowledge of the rock mass ahead of the face is essential for both safety and efficiency of work. Many tunnel collapses have been r
Jan 1, 2008
-
HellyerÆs Exploration DevelopmentBy Viney K. G, Molinia A. B
The Hellyer Pb-Zn-Ag orebody in western Tasmania was discovered in 1983, and mine production at a rate of 250 000 tonnes/yr commenced in 1987. Expansion to 1 million/yr will be completed by early
Jan 1, 1988
-
The Development of an Ore Reserve Methodology for the Olympic Dam Copper Uranium-Gold DepositThe accuracy of an ore reserve is only as good as the geologist's understanding of the deposit. The methods that are applied to resource and reserve estimation reflect that understanding. At th
Jan 1, 1987
-
Dry Granulation to Provide a Sustainable Option for Slag Treatment**Add abstract here**
Jun 1, 2010
-
Ignition of Elura Lead Concentrate Under Flash Drying ConditionsBy Turner T. M, Jorgensen F. R A
The tendency of the concentrate to ignite was studied using four techniques, namely, laminar flow furnace, fluid bed, thermal analysis and boat-in-furnace. Exothermic activity occurred at two temp
Jan 1, 1987
-
In-Situ Measurement of Thermal Diffusivity of Rock and Prediction Calculation of Transient Underground ClimateBy Biao Q, Mizuta Y
Thermal constants such as thermal con- ductivity and thermal diffusivity of rock and coefficient of heat transfer of airway wall are the most important characteristic values which decide accuracy o
Jan 1, 1988
-
Geotechnical Investigations for Urban Road Tunnels in SydneyBy Hosking IA, Mirkov P
Among the solutions currently being considered for improving traffic flow in Sydney are the construction of major road tunnels, principally the Eastern Distributor Tunnels, leading from the end of
Jan 1, 1987
-
The Underground Connection Line Between South and North Stations BeijingBy Shugen T
Due to the increase of passenger traffic, a new station is proposed which is about 6.8km from south station. An underground connection line is under feasibility study for connecting these two sta
Jan 1, 1987
-
Highwall Trench Mining as a Primary Production Method of Coal ExtractionOaky Creek Coal (OCC) has embarked on an ambitious program to fast track the introduction of Trench Mining into its current mining operations. The project has the capacity to allow the extraction of r
Jan 1, 1992
-
The Isasmelt Pocess doe Copper Smelting.By Fountain C. R
In April 1987, Mount Isa Mines Limited (MIM) commissioned an ISASMELT reactor to smelt 15t/h of copper concentrate at the Mount Isa Copper Smelter. This unit was based on the Sirosmelt lance techno
Jan 1, 1989
-
Optimising Pit Slope Design at Kidston Gold MinesKidston Gold Mines Limited (70 per cent Placer Pacific and 30 per cent Public Shareholders) has been mining the Wises Hill Pit since late-1984. The Wises Hill Deposit is a large low grade gold deposit
Jan 1, 1992
-
Understanding the Kegold ElectrodeBy Wright D. C
The operation of the cyanide-sensitive Mintek/TB1 kegold electrode was studied in the laboratory, with regard to equilibration time and drift, the effects of pH, stirring, salinity, dissolved oxygen
Jan 1, 1996
-
The Mineralogy of Platinum Group Elements in Ophiolite Peridotite, New CaledoniaIn the Massif du Sud ophiolite complex platinum group elements occur predominantly as ultrafine-grained inclusions of rutheniridosmine, laurite and iridosmine. These form primary inclusions less th
Jan 1, 1989
-
Perth City Rail Tunnel Project - Overview, Geotechnical Conditions and Building ProtectionBy M Grinceri
The New MetroRail City Project was completed in 2007 in Perth, Western Australia. The project included construction of two underground stations, twin bored rail tunnels of 1.4 km combined length and c
Jan 1, 2008