Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effect of Sample Density and Configuration on the Accuracy of Reserve Estimation (Abu Tartur Area, Western Desert, Egypt)

    By Rashad MZ

    The evaluation of ore deposits consumes much effort, cost and time, hence research work must aim to minimize these inputs with no loss of accuracy. The present study is devoted to assess the optimum

    Jan 1, 1987

  • AUSIMM
    How to Deal Effectively with the Media, Public, and Government

    External pressures are being exerted on busi- ness, and especially the mining and energy in- dustries, as never before. These pressures are burdensome, they emerge in unique forms, and they constitu

    Jan 1, 1978

  • AUSIMM
    What Gives a Shoreline Heavy Mineral Potential on the Swan Coastal Plain?

    By Deverux M

    Heavy mineral deposits accumulate on shorelines with interrupted sediment input. Beach deposits, which form on shallowly dipping coastal plains, are most favourable. However, shallow shelves seawa

    Jan 1, 1986

  • AUSIMM
    Management of the Outburst Risk in the Southern Coalfield, New South Wales

    Coal mining in the Bulli seam in the Southern Coalfield in New South Wales has experienced the dangers of outbursts of coal and gas. These incidents present a major risk to the safety of mine workers

    Jan 1, 2003

  • AUSIMM
    Integrating Environmental Factors into Mining Projects

    This paper discusses a number of examples of how environmental factors have been incorporated into the water management aspects of mining projects. One example is the Kingston Lignite Project in t

    Jan 1, 1987

  • AUSIMM
    Review of the Mobile Miner at Isa Mine

    The search for an efficient and economic machine to excavate hard rock continues. Development of the Robbins Mobile Miner commenced in 1983 with the formation of a joint venture between Mount Isa

    Jan 1, 1988

  • AUSIMM
    Prediction of Rock Mass Properties Ahead of Tunnel Face Using Drilling Parameters

    By K-S Kim, C-Y Kim, D-G Kim

    In tunnel construction or other underground construction, a detailed knowledge of the rock mass ahead of the face is essential for both safety and efficiency of work. Many tunnel collapses have been r

    Jan 1, 2008

  • AUSIMM
    HellyerÆs Exploration Development

    By Viney K. G, Molinia A. B

    The Hellyer Pb-Zn-Ag orebody in western Tasmania was discovered in 1983, and mine production at a rate of 250 000 tonnes/yr commenced in 1987. Expansion to 1 million/yr will be completed by early

    Jan 1, 1988

  • AUSIMM
    The Development of an Ore Reserve Methodology for the Olympic Dam Copper Uranium-Gold Deposit

    The accuracy of an ore reserve is only as good as the geologist's understanding of the deposit. The methods that are applied to resource and reserve estimation reflect that understanding. At th

    Jan 1, 1987

  • AUSIMM
  • AUSIMM
    Ignition of Elura Lead Concentrate Under Flash Drying Conditions

    By Turner T. M, Jorgensen F. R A

    The tendency of the concentrate to ignite was studied using four techniques, namely, laminar flow furnace, fluid bed, thermal analysis and boat-in-furnace. Exothermic activity occurred at two temp

    Jan 1, 1987

  • AUSIMM
    In-Situ Measurement of Thermal Diffusivity of Rock and Prediction Calculation of Transient Underground Climate

    By Biao Q, Mizuta Y

    Thermal constants such as thermal con- ductivity and thermal diffusivity of rock and coefficient of heat transfer of airway wall are the most important characteristic values which decide accuracy o

    Jan 1, 1988

  • AUSIMM
    Geotechnical Investigations for Urban Road Tunnels in Sydney

    By Hosking IA, Mirkov P

    Among the solutions currently being considered for improving traffic flow in Sydney are the construction of major road tunnels, principally the Eastern Distributor Tunnels, leading from the end of

    Jan 1, 1987

  • AUSIMM
    The Underground Connection Line Between South and North Stations Beijing

    By Shugen T

    Due to the increase of passenger traffic, a new station is proposed which is about 6.8km from south station. An underground connection line is under feasibility study for connecting these two sta

    Jan 1, 1987

  • AUSIMM
    Highwall Trench Mining as a Primary Production Method of Coal Extraction

    Oaky Creek Coal (OCC) has embarked on an ambitious program to fast track the introduction of Trench Mining into its current mining operations. The project has the capacity to allow the extraction of r

    Jan 1, 1992

  • AUSIMM
    The Isasmelt Pocess doe Copper Smelting.

    By Fountain C. R

    In April 1987, Mount Isa Mines Limited (MIM) commissioned an ISASMELT reactor to smelt 15t/h of copper concentrate at the Mount Isa Copper Smelter. This unit was based on the Sirosmelt lance techno

    Jan 1, 1989

  • AUSIMM
    Optimising Pit Slope Design at Kidston Gold Mines

    Kidston Gold Mines Limited (70 per cent Placer Pacific and 30 per cent Public Shareholders) has been mining the Wises Hill Pit since late-1984. The Wises Hill Deposit is a large low grade gold deposit

    Jan 1, 1992

  • AUSIMM
    Understanding the Kegold Electrode

    By Wright D. C

    The operation of the cyanide-sensitive Mintek/TB1 kegold electrode was studied in the laboratory, with regard to equilibration time and drift, the effects of pH, stirring, salinity, dissolved oxygen

    Jan 1, 1996

  • AUSIMM
    The Mineralogy of Platinum Group Elements in Ophiolite Peridotite, New Caledonia

    In the Massif du Sud ophiolite complex platinum group elements occur predominantly as ultrafine-grained inclusions of rutheniridosmine, laurite and iridosmine. These form primary inclusions less th

    Jan 1, 1989

  • AUSIMM
    Perth City Rail Tunnel Project - Overview, Geotechnical Conditions and Building Protection

    By M Grinceri

    The New MetroRail City Project was completed in 2007 in Perth, Western Australia. The project included construction of two underground stations, twin bored rail tunnels of 1.4 km combined length and c

    Jan 1, 2008