Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation and Control of Self-Heating in Sulphide Concentrates (2a4e2f85-66d7-4fa2-be4e-37d3482156e2)

    By J. Nesset, F. Rosenblum, P. Spira

    "Sulphide concentrates may exhibit self-heating to various degrees during storage or shipping, the worst cases presenting a serious hazard from fire and SO2 emission. Based on measurements of heating

    Jan 1, 2001

  • CIM
    Improving Double Bench Face Performance at the Ekati Diamond MineTM Site

    By Judy K. Todd

    Double benching has been utilized as an excavation technique in open pit mines for many years. This process involves drilling, blasting, and excavating the material for the design bench height. A seco

    May 1, 2002

  • CIM
    Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle size

    By S. Kahraman, K. Develi, E. Yasar

    Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At

    Jan 1, 2004

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Gyratory Crusher Wear Monitoring Using Laser Technology

    By Persio P. Rosario

    Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the

    May 1, 2002

  • CIM
    Upgrading Molybdenite Ores between Mine and Mill Using Microwave/Infrared (MW/IR) Sorting Technology

    By Eugen Gluck, Gus Van Weert, Peter Kondos

    "Microwaves have the capability to heat up sulphides, especially clusters of particles of approx. 1 mm. Some sulphides absorb microwaves more readily than others. Molybdenite is especially effective i

    Jan 1, 2009

  • CIM
    Circuit Modifications at Westmin Resources Myra Falls Operations

    By C. Veloo

    "Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.

    Jan 1, 1992

  • CIM
    The Use of Design of Experimentation Software in Laboratory Testing and Plant Optimization

    By Corby G. Anderson

    "Laboratory testing, plant optimization, and the interpretation and application of metallurgical technologies can be tedious, time consuming and costly. This paper outlines the use of proven statistic

    Jan 1, 2006

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    Frother and Collector Effects on Flotation Cell Hydrodynamics and Their Implication on Circuit Performance (c615fbc8-d724-48ab-a36a-7fd85aca4c5e)

    By J. E. Nesset

    "Significant progress has been made over the past few years on characterizing and understanding the hydrodynamic properties of frothers and collectors and their effect on flotation performance. This n

    Jan 1, 2010

  • CIM
    The Re-emergence of Resin in Pulp with Strong Base Resins as a Low Cost, Technically Viable Process for the Recovery of Uranium

    By Chris Fleming, John R. Goode, James Brown

    "Data will be produced from two uranium feasibility studies that were conducted in 2008, both involving uranium recovery from leached slurry by resin-in-pulp (RIP) with strong base resins. Excellent m

    Jan 1, 2010

  • CIM
    Improving Fine Lead and Silver Flotation Recovery at BHP-Billiton’s Cannington Mine

    By Glenn Clarke, Ben Holloway, Barry Lumsden

    "BHP-Billiton’s Cannington mine in Northwest Queensland produces a silver-rich lead concentrate and a zinc concentrate. The plant has the capacity to treat 3.1 mta and for the year to June 2006 mean f

    Jan 1, 2008

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Mass Balances in Mill Metallurgical Operations

    By R. Tipman, T. C. Burnett

    "A general computer program has been written to calculate material balances using multiple regression techniques. The program can handle metal assays or size distribution data obtained in multiple sur

    Jan 1, 1978

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009