Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-99-77 Surveying Inhalation Contaminants In Above Ground Coal Mining And Processing Work Areas (For Company Safety Officers)
By Walter D. Holland
This is one of a series of instruction guides developed to help instructors present health and safety training courses to workers in the coal mining industry. This course is intended for training thos
Jan 1, 1976
-
OFR-62-78 Automated Continuous Miner Preliminary Design - Section I - Introduction
By K. C. McMahon
This report is the result of the engineering efforts performed by the Mining Equipment Operations of FMC to develop methods of automating a continuous miner. This work was done as part of modification
Jan 1, 1975
-
RI 3777 Wartime Application of Air-Gas Injection and Oil-Well Reconditioning in the Appalachian Region
By Sam S. Taylor
"INTRODUCTION This report deals with a comparatively simple application of some of the engineering principles involved in the evaluation, installation, and operation of air- or gas-injection projects
Sep 1, 1944
-
RI 3519 Underground Transportation Of Coal - Progress Report 1
By Albert L. Toenges, Frank A. Jones
"INTRODUCTION The introduction of mechanized pining in coal mines, which has speeded loading, has emphasized the importance of efficient underground transportation systems. The purpose of this invest
Jun 1, 1940
-
RI 4288 Flood-Prevention Projects at Pennsylvania Anthracite Mines Progress Report for Fiscal Year Ended June 30, 1947
By W. E. Cassan, W. L. Eaton, James Westfield, W. M. Romisher, Karl Hughes, S. H. Ash
"INTRODUCTION Funds were made available to the Bureau of Mines, United States Department of the Interior, for anthracite investigations during the fiscal year ended June 30, 1945. One of the approved
Apr 1, 1948
-
OFR-105(2)-84 Ground And Air Vibrations Caused By Surface Blasting. Volume 2 Ground Vibration Monitoring And Assessment Of Conventional Predictors
By Sally A. Shoop
Thirty-seven blasts have been monitored using either three or four seismographs, at four coal strip mines and at a limestone quarry. Statistical analysis of the data shows that square-root, cube-root,
Jan 1, 1983
-
RI 4928 Progress Report on Pegmatite Investigations in South Dakota for Fiscal Year Ended June 30, 1951
By D. H. Mullen, S. M. Runke, J. B. Cunningham
"SUMMARYThe coarse-grained granitic pegmatities of the United States have long been a source of many important industrial minerals, because of this, they have been studied intensively by geologists, m
Dec 1, 1952
-
IC 8227 American Standard Safety Rules For Installing And Using Electrical Equipment In And About Coal Mines (M2.1) (Revision Of American Standard Safety Code For Installing And Using Electrical Equipment In Coal Mines, M2.1, 1952) - Introduction (5314e5b6
Safety rules for installing and using electrical equipment in and about coal mines covered in this information circular supersede those previously included in Bureau of Mines Bulletin 514, issued in 1
Jan 1, 1964
-
RI 6331 Willett Range Coal Deposits, Mackay Glacier Area, Victoria Land, Antarctica
By John J. Mulligan
Coalbeds were discovered in outcroppings of the Beacon group of sediments on the north end of the Willett Range ( altitude 77 ° 11 ' S , longitude 160 ° 20 ' E ) , Victoria Land , Antarctica , in Dece
Jan 1, 1963
-
RI 3480 Progress Reports - Metallurgical Division - 34. Annual Report Of The Metallurgical Division, Fiscal Year 1939 ? Introduction (f8adc79d-0782-459e-ad3a-6ff2d4c4a06e)
By R. S. Dean
[During t!~c past f isc.~l y~:-.r the Xetzllvz-gicd 3ivi oion has made im- portant contribution-, don,- tlie lines rlictnteil by the Bureau policy of con- servation of domestic rnker~l rcsoul-ces thro
Jan 1, 1940
-
OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? Intro
This appendix contains the list of equipment selected for the capitol cost estimate, with the respective quotations from their vendors/manufacturers. A vendor response report along with a separate equ
Jan 1, 1979
-
RI 3480 Progress Reports - Metallurgical Division - 34. Annual Report Of The Metallurgical Division, Fiscal Year 1939 ? Introduction
By R. S. Dean
[During the past fiscal year the Metallurgical Division has made important contributions along the lines dictated by the Bureau policy of conservation of domestic mineral resources through Its inve
Jan 1, 1940
-
OFR-122(3)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume III - Appendix A - Equipment List, Specifications And Quotations - Areas 8 - 25 ? Intro
This appendix contains the list of equipment, their corresponding number and their specifications with the quotations from the vendors/ manufacturers who can supply this equipment. The listings are ar
Jan 1, 1979
-
RI 3519 Underground Transportation Of Coal - Progress Report I ? Introduction
By Albert L. Toenges
The introduction of mechanized mining in coal mines, which has speeded loading, has emphasized the importance of efficient underground transportation systems. The purpose of this investigation is to s
Jan 1, 1940
-
IC 6737 Petroleum And Natural-Gas Studies Of The United States Bureau Of Mines
By H. C. Fowler
The social economy, or public interest, and national defense require wise development and efficient use of the oil and gas resources of the United States. In this development and use, and in the preve
Jan 1, 1933
-
IC 6107 Mining Practice At Morenci Branch, Phelps Dodge Corporation, Morenci, Ariz. ? Introduction
By McHenry Mosier
This paper describing mining practice at Morenci, Ariz., is one of a series of articles on mining method, and practice in the various mining districts in the United States. At present (1929) practi
Jan 1, 1929
-
OFR-75-78 Final Report - Hydraulic Transport Research Facility - Volume I
[This Report represents the culmination of work perfomed under Contract No. .,JG1551A8 for the U.S. Bureau of Mine.The '.:o-< embeded a site evaluation, engineering E:-y- ,, esign, and preparati
Jan 1, 1976
-
The Electrothermic Metallurgy Of Zinc. - Introduction.
By B. M. Harra, O&apos
Zinc smelting is frequently termed a backward art. The term is hardly true, for great progress has been made in recent years in the design and in the thermal efficiency of the retort furnace, in the q
Jan 1, 1923
-
OFR-165-77 Evaluation Of Experimental And Developmental Communication Systems Used In Underground Coal Mines - Performance Of Trapped-Miner Communication System
By P. L. Michael
Several evaluations were made by Modified Rhyme Test (MRT) word lists transmitted through various simulations of the Trapped-Miner Communication System being developed by the U.S. Bureau of Mines. The
Jan 1, 1977
-
OFR-38(1)-74 Survey Of Electromagnetic And Seismic Noise Related To Mine Rescue Communications - Volume I - Emergency And Operational Mine Communications ? Introduction
By Robert L. Lagace
This final report documents the work done by Arthur D. Little, Inc. (ADL) on behalf of the U.S. Bureau of Mines, Pittsburgh Mining and Safety Research Center (PMSRC), on Contract R0122026 (which began
Jan 1, 1974