Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Performance Monitoring Of A Block Cave Mine Using Signal Processing And Waveform Analysis Of GPS Data

    By D. Rutledge

    Discrete (digital) signal processing techniques are proving to be very valuable tools for miners using the block cave method. Waveform analysis of different measured signals associated with active min

    Jan 1, 2008

  • SME
    Super Cycle: The Future

    By Douglas B. Silver

    Super Cycle future The final topic is mining?s future. The most important questions are ?How much longer is the Super Cycle going to last? What should we expect to see going forward? How will the Sup

    Jan 1, 2008

  • SME
    Does The Capital Budgeting Process Inhibit Corporate Competitiveness? (AIME PRIPRINT 98-64)

    By B. W. Cavender

    Capital investments are made for a variety of purposes, from providing incremental capacity at existing operations to developing and implementing new technologies intended to radically improve a compa

    Jan 1, 1998

  • SME
    The Treatment Of Copper Ores And Concentrates With Nitrogen Species Catalyzed Pressure Leaching

    By C. G. Anderson

    Today, with a stringent economic and environmental climate prevailing in the copper business, there is increased interest in evaluating new processing alternatives for production. Hydrometallurgical p

    Jan 1, 2001

  • SME
    Making Headway: All-Tool Carriers And Attachments Are Making An Impact On Advanced Tunneling

    By Peter Bigwood

    Whether drilling through tough clay or breaking rock, or facing the most severe conditions including mixed face ground, perched water and running and flowing sands, working under-ground certainly come

    Jan 1, 2012

  • SME
    Development Of Duval Corporation's Sierrita Mire

    By Thomas Jancic

    Two of the open-pit, copper-molybdenum mining operations of Duval Corporation are located in the foothills of the Sierrita Mountains approximately 30 miles southwest of Tucson, Arizona. In March 1959,

    Jan 1, 1971

  • SME
    AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic Ridge

    By J. W. Jamieson, J. Escartin, A. Steinführer

    Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C

    Sep 1, 2014

  • SME
    Construction Of Explosion Resistant Seals – Preprint 97-83

    By C. R. Stephan

    Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations

    Feb 24, 1997

  • SME
    Use Of Tunnel Boring Machines At The Stillwater Mining Company's Underground PGM Mines

    Stillwater Mining Company has an extensive history with tunnel boring machines (TBM) at the Stillwater and East Boulder underground PGM mines in Montana. The first use of a TBM was a 4 m (13 ft) diame

    Jan 1, 2012

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008

  • SME
    Musculoskeletal Disorders Among Dozer Operators Exposed to Whole-Body Vibration in Indian Surface Coal Mines Mining, Metallurgy and Exploration

    By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady

    Dozer operators are frequently exposed to whole-body vibration (WBV) during the execution of their work. Occupational exposure to WBV in Indian surface coal mines was evaluated by measuring vibration

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • SME
    The Next Generation of TBMs and Conveyor Systems for Mining Applications

    By Greg Watson, Dennis Ofiara

    "TBMs have been used in mining in decades past, but their use has been limited and sporadic, due to both perceived and actual application difficulties. With new technology and mounting success stories

    Jan 1, 2016

  • SME
    A heat study and the modelling of future climatic conditions at Vale Inco?s Coleman/McCreedy East Mine

    By C. K. Kocsis

    A study was undertaken to evaluate the thermal environment and determine the contributing heat sources within the existing 153 Orebody of Coleman/McCreedy East Mine which would then enable the predict

    Jan 1, 2009

  • SME
    Possibilities of utilizing mineral wastes in Hungary

    By I. Gombköto, J. Bohm

    "In Europe, and therefore in Hungary opening a new mine is harder and harder. Depletion of mines, unfavourable legal and economic changes, and growing public concerns are the main reasons. Social and

    Jan 1, 2011

  • SME
    Face dust levels at deep-cut underground coal mines - SME Transactions 2011

    By J. F. Colinet, W. R. Reed, J. D. Potts

    Dust surveys were conducted at six underground coal mines to determine if deep-cutting practices expose face workers to higher levels of respirable dust. The surveyed mines were able to successfully m

    Jan 1, 2011

  • SME
    Reducing dust exposure from contaminated work clothing with a stand-alone cleaning system

    By A. B. Cecala

    A few years ago, the National Institute for Occupational Safety and Health and Unimin Corporation developed a clothes cleaning system that is able to quickly, effectively, and safely remove dust from

    Jan 1, 2009

  • SME
    Implementation Of The Hydrofloat Technology At The South Fort Meade Mine

    By M. Mankosa, G. Taylor, G. Luttrell, J. Yasalonis

    Several industrial-scale HydroFloat separators have recently been installed at Mosaic’s South Fort Meade beneficiation plant for the purpose of improving phosphate recovery and throughput capacity. Th

    Jan 1, 2007

  • SME
    Why Do Some Passive Treatment Systems Fail While Others Work?

    By J. J. Gusek

    There are hundreds of passive treatment systems accepting mining influenced water (MIW) throughout the world. Some systems do not perform to design expectations while others, including volunteer syste

    Jan 1, 2002

  • SME
    Successful Completion of LA Metro Regional Connector Transit Project - RETC2023

    By Mike Harrington, Tung Vu

    The Regional Connector Transit Project is a 1.9-mile-long underground light rail system that will connect LA Metro’s A (Blue), E (Expo), and L (Gold) Lines in downtown Los Angeles. This $1.75-billion

    Jun 13, 2023