Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Retention Of Palladium Within Condensed-Tannin Gel By Redox Mechanism And Separation Of Pd And Au In Chloride SolutionBy Yoshio Nakano
Keywords: Tannin gel, Palladium, Separation, Redox We have developed the novel recovery system of palladium from wastes, which is simple and generates little secondary waste in comparison with the
Jan 1, 2005
-
Problems With Rock Classification For Empirical And Numerical DesignBy Douglas Milne
Most empirical and numerical approaches to design in rock mechanics incorporate rock mass classification. Numerical design methods generally use classification values to calculate input parameters for
Jan 5, 2007
-
Augered Cast-In-Place Piles - Friday, May 5, 2006 - Title ? Table Of Contents - A Historical Perspective On Current Cast-In-Place Piling PracticeBy Willie M. NeSmith
Cast-in-place piling are a staple of the deep foundation industry, and are used (in various forms) worldwide. In assessing the application of cast-in-place piles, it is of value to reflect on the dev
Jan 1, 2006
-
Importance of failure mechanisms for management of surface instability risk above abandones minesBy J. P. Josien, Didier C.
ABSTRACT: France now faces the closure of most of its mining sites. Surface instability risk may sometimes remain, especially where large underground voids exist. This paper illustrates the importance
Jan 1, 2003
-
St Clair River Rail Tunnel, Sarnia Evolution Of The Design And Construction Methods For The TBM Cutterhead RetrievalBy Peter McDonald
In 1994 the world's largest underwater tunnel was constructed to link Canada and the U.S.A. This new tunnel was large enough to accommodate double-decker railway cars. The construction of an unpl
Jan 1, 1997
-
Federal Cooperation To Protect Watersheds Degraded By Coal Mine Drainage From Abandoned Mine LandsBy B. Samoski
In late 1994, EPA and OSM acknowledged that efforts by any one agency or by the many different agencies to remedy the water quality impacts of decades of contamination from abandoned coal mine lands
Jan 1, 2002
-
BHP Iron Ore Protocol for Mine ClosureBy Hillis R
As part of BHP Iron Ore's policy and goal of achieving a high standard of environmental management within its operations, a protocol for mine closure has evolved. The need to demonstrate sound
Jan 1, 1996
-
Scale effect on the geometrical and mechanical properties of rock jointsBy N. Fardin, O. Stephansson, L. Jing
A pair of silicon rubber replicas of size 250 mm by 250 mm, from a natural rock joint, was used to produce several high strength concrete fracture replicas of different sizes, from 50 mm by 50 mm to 2
Jan 1, 2003
-
Isa Mill Medium Competency And Its Effect On Milling PerformanceTraditional fine grinding mills in mineral processing relied on the use of steel medium for particle size reduction. The successful development of the Isa Mill(a horizontal stirred mill with 3000 litr
Jan 1, 2000
-
Further Discussion - Further Discussion on Water Gas Reservoirs: Uncertainty in Reserves Evaluation From Past HistoryBy W. Hurst
The authors of this paper, in substituting values in a material balance equation associated with a gas reserve and a water drive, cannot find sustainment of what the gas in place should be; therefore,
-
OFR-98-80 Concept Study Shuttle Car Cable ReelBy R. J. Gunderman
Cable reel systems for shuttle cars were investigated to determine whether an improved system could be identified. Interviews and mine visits were conducted to better define limitations and problems w
Jan 1, 1980
-
A MultiGaussian Approach to Assess Block Grade UncertaintyBy Julián M. Ortiz
Uncertainty quantification of a spatially distributed variable at any scale can be handled through geostatistical simulation. Large computation time, storage, and post-processing of the realizations a
May 1, 2004
-
Método de almacenamiento provisional aplicado a cuerpos irregulares. Alternativa para explotar la mina Santa BárbaraBy Elipio Pérez Coronado
El presente trabajo describe la aplicación del método de corte y relleno descendente mecanizado y el método de almacenamiento provisional en la mina Santa Bárbara, ubicada en Cerro de Pasco. Para el p
Nov 8, 1984
-
TBM Tunneling At The Ashlu Hydropower Project, Squamish, BCBy Serge Moalli
The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4
-
Chemical Stabilization Of Fine Coal Waste As An Alternative To Slurry ImpoundmentsBy Z. Duan
A novel concept involving the deployment of chemical stabilization has the potential to eliminate the need of slurry impoundments and significantly reduce the release of trace elements from the high s
Jan 1, 2012
-
NATM Tunnels at Stanford Linear Accelerator Center, Menlo Park, CaliforniaBy P. J. Doig
The LCLS project at SLAC will allow new insights into material properties, chemical reactions and biological processes. The project includes half a mile of new underground construction. Excavation in
Jan 1, 2008
-
History of the Institute - Title PageJan 1, 1971
-
Role of Technical Innovation on Production Delivery at the Polokwane SmelterBy F. Stober, D. Wanblad, J. Ndlovu, L. R. Nelson, L. P. S. de Villiers
The single six-in-line furnace of the Polokwane Smelter is the largest installed high-intensity furnace for platinum group metals (PGM) base metals sulphide smelting in the world. The furnace employs
Jan 1, 2005
-
Innovative mining method, related blasting system and quality assurance for large underground crusher excavation Freeport DOZ Mine, West Papua IndonesiaBy Rudi Toba
Several areas at the DOZ haulage were observed for the crusher’s location. Initially the new crusher designed position was west of the crusher 1, but due to concerns of the mine crack zone (deep MLZ)
Jan 1, 2007