Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drawpoint Design in Caving and Stoping Mines
The design of drawpoints in caving and stoping mines has a significant impact on the productivity of the operation. Drawpoints must be designed to provide uniform drawdown and maximum recovery of the
Jan 1, 2000
-
The Use of a Decline at Mt. Windarra for Mine Access and Haulage
A system of decline mine entries and ore haulages has been designed for the Mt. Windarra mine. This choice was controlled by the nature of the ore- bodies, the mining method chosen and the capital
Jan 1, 1973
-
Reducing the Risk - Application of Three-Dimensional Modelling Methods to Evaluate of Underground Mining Scenarios
The availability of three-dimensional computer hardware and software makes the solid modelling of geological entities a realistic and logical alternative to previous sectional and plan 'models&ap
Jan 1, 1993
-
Total Quality Control Experiences in the BHP Collieries
The BHP Steel Group embarked on a Total Quality Control (TQC) programme in 1984 in response to enquiries from a major customer regarding procedures for quality in materials supply.The TQC initiative h
Jan 1, 1991
-
The Management of Project Development
By Conway KM
The traditional role of Australian Consultants in project development has been until recently restricted to the provision of discrete packages for survey and engineering services during the feasib
Jan 1, 1983
-
New Environmental Legislation: Implications and Issued for Coal Mining in NSW
In December 1997, a series of new environmental legislation was enacted including:ò Environmental Planning andAssessmentAmendmentAct 1997; ò Contaminated Land ManagementAct 1997;ò Protection of the En
Jan 1, 1998
-
Pilot Plant Study to Treat Typical Gold Mine Minewater Using the Savmin Process
By U E. Sibilski
A pilot plant evaluation of the Savmin process, for the purification of mine water was commissioned by Anglogold and conducted at the Stilfontein Gold Mine, Margaret Shaft at Stilfontein in the North
Jan 1, 2003
-
-
Simberi Oxide Gold Project - Licensing Approvals
In June 1996, Nord Resources Pacific (Nord) decided to work towards obtaining all necessary approvals from the government of PNG for a mine on Simberi Island in the Tabar Island Group, New Ireland
Jan 1, 1997
-
Mining and the Environmental Protection Legislation in N.S.W.
In September 1980 the N.S.W. Environ- mental Planning and Assessment Act was gazetted. This legislation created a new arena of government involvement in the procedure for obtaining approval to open
Jan 1, 1983
-
Due Diligence Requirements for Coal Property Acquisition
By Jr
This paper provides a comprehensive review of the requirements of a full due diligence study for a coal property acquisition in both text and table format. From the initial scoping of the assignment,
Jan 1, 2003
-
Aggressive Productivity Improvement: Killing Waste and Adding Value Using True TQM
Extensive personal experience in the USA and Australia has shown that Australians working in suitable work environments are capable of world-class performance. To build such work environments, minin
Jan 1, 1995
-
Introduction to the Project
The mining activities on the North Mine leases have, over the years, followed the orebody from the shallower depths at the southern end of the lease as it continued northwards at progressively increas
Jan 1, 1957
-
Orebodies in the Mt. Charlotte - Hannans North Area, Kalgoorlie
Orebodies in the Mt. Charlotte - Hannans North Area N. & B. of the town of Kalgoorlie provide a marked'dontrast to the pyrite - telluride lodes of the Golden Mile, although both groups of orebo
Jan 1, 1964
-
The Development of Metallurgical Practice for Poseidon Limited Nickel Ores
By Quadrio J. S, MacHunter A. M W
The initial development fl6tation testwork on Mt. Windarra op was completed on composited drill core intersections at the.Australian Mineral Development Laboratory. An exploratory winze provided
Jan 1, 1973
-
Haematite Recovery from a Tailings Stream
Haematite Recovery from a Tailings Stream Laboratory and pilot scale testing were carried out in 1999 on a tailing sample from a North American iron ore plant using gravity, magnetic and flotation te
Sep 13, 2010
-
A One-Sided View of the Development of Computer-Assisted Mapping and Modeling
By Johnson M, Gaudin A
With the advent of Computer aided mapping and surface modelling techniques Geologists and Engineers have had to become familiar with the capabilities and limitations of these systems to effectively
Jan 1, 1983
-
Modelling of Slag Blow in Copper Peirce-Smith Converters
By P Vix
A thermodynamic model of the copper Peirce-Smith (P-S) converter has been developed to predict the behaviour of magnetite in the converter slag, the amounts of slag and matte, the compositions of slag
Jan 1, 2005
-
Marketing Australian Bauxite
Until the early 1960s the world aluminium industry was dominated by six principle pro- ducers with integrated activities from bauxite mining to aluminium production. The growth in consumption of alu
Jan 1, 1974
-
Wirralie Gold Mine A Case Study
By Goode A, Belby P, Wardell-Johnson M
Within a short time frame of just over two years Wirralie Gold Mine has been developed from a virgin geological discovery to an operating gold mine with a mine life of six years and a production r
Jan 1, 1989