Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)
By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Radium Hospital Project in Oslo, Norway.
By Dominik Gächter, Wojciech Szczepiñski
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Sep 8, 2021
-
Radium Hospital Project In Oslo, Norway
By Wojciech Szczepiński, Dominik Gächter
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Oct 1, 2021
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large Warehouses
By Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont Tower
By Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Accuracy of Low-Strain Pile Integrity Test Results
By Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction
By Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
“Special Application Of Micro-Piles” For The Construction Of A Bridge Well Foundation
By Nagarajkumar BV
Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu
Nov 1, 2022
-
Practical Construction Considerations for Runway Extension and Taxiway Expansion over Soft/Organic Soil Using a Column Supported Load Transfer Platform
By Brian T. Nereson, Michael C. Penney
"This technical paper was prepared to describe the general process by which the authors designed a column-supported load transfer platform (LTP) for support of asphalt-paved runway and taxiway embankm
Jan 1, 2016
-
Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California
By Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa
"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un
Jan 1, 2015
-
Installation of Secant Pile Wall in Rock Adjacent to Fragile Building
By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks
"The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr
Jan 1, 2016
-
Application of Dry Jet Mixing to Earthquake Disaster
By Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) method as the representative deep mixing technique has been demonstrating best practice on ground mitigation works coping with complicated soil condition and limited site space.
Jan 1, 2015
-
Atoka Pipeline - Canadian River Crossing
By Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC
By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li
"Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu
Jan 1, 2015
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission Line
By Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017
-
Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study
By R. Radhakrishnan, C. Gunasekaran
"Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of
Jan 1, 2015
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site Ii
By Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.
By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction
By Stephen Buttling, Zhong Rui
"A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a
Jan 1, 1900
-
Design-Build Synergy To Deliver Pile Foundations
By David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa