Search Documents

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)

    By G. Miller

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant

    Jan 1, 2001

  • SAIMM
    Design tools to minimize the occurrence of ore pass interlocking hang-ups in metal mines

    A comprehensive review of ore pass records, from ten Quebec underground mines, indicated some of the limitations of available design tools to predict the occurrence of ore pass interlocking hang-ups i

    Jan 1, 2003

  • SME-ICGCM
    Design Trade-Off For Angle Roof Drilling

    By James H. Fletcher

    Much data and experience has been accumulated, especially in the last 5 or 6 years, to show that modern roof trusses, both of the Birmingham type and the bolt-and-channel type, perform well to support

    Jan 1, 1982

  • AUSIMM
    Design, Commissioning and Operation of Elura's Larox Pressure Filters

    By Jagger ND

    Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain

    Jan 1, 1985

  • CIM
    Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot Plant

    By Jack Zhang, Yunguo Tang, Baodong Zhao

    "Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance

    Jan 1, 2017

  • CIM
    Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding Circuit

    By Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski

    "Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi

    Jan 1, 2016

  • DFI
    Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of Structures

    By A. A. Gupte

    Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use

    Jan 1, 1989

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • AUSIMM
    Design, Construction and Commissioning of the Ridgeway Concentrator Regrind Circuit at NewcrestÆs Cadia Valley Operations

    By F Cesnik, P Griffin, S Green

    In July 2004 a flotation concentrate regrind circuit was commissioned in the æHigh GradeÆ Ridgeway concentrator at NewcrestÆs Cadia Valley Operations. This was the culmination of two years of project

    Jan 1, 2005

  • DFI
    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900

  • NIOSH
    Design, Construction And Development Of In Situ Mining Wells ? Objective

    Minimize failures or inefficiency in the operation of in situ mining wells. Approach The proper design, construction and development of wells are important to any in situ leaching operation. T

    Jan 1, 1984

  • CIM
    Design, Construction and Initial Operation of the Tailings System at Brenda Mines Ltd.

    By H. Tetu, F. Pells

    "The copper-molybdenum property of Brenda Mines Limited is located in the Okanagan district of British Columbia, approximately 25 miles west of Kelowna. The Okanagan Valley is a resort and fruit-growi

    Jan 1, 1971

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014

  • SME
    Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? Introduction

    By M. D. Scott

    Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972

    Jan 1, 1976

  • AUSIMM
    Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil Waterways

    By M D. Melville, B C. T Macdonald, T D. W

    The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T

    Jan 1, 2003

  • SME-ICGCM
    Design, Construction And Performance Of A Single Pass Lining For Soft Ground Coal Mine Tunnel Entries

    By Donald P. Richards

    West Elk Coal Company operates its Mt. Gunnison No. I mine on the western slope of the Rocky Mountains in Western Colorado. The mine is located along the north fork of the Gunnisson River near Somerse

    Jan 1, 1984

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • SME
    Design, Construction And Start-Up Of The Ilo Smelter Modernization Project

    By H. Walqui, C. Noriega

    Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000

    Jan 1, 2007

  • DFI
    Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch Bridge

    By William Auyeung

    Micro-piles are small-diameter, drilled and grouted reinforced piles used for both structural support and in situ earth reinforcement. They were conceived in Italy in 1952, but have become popular in

    Jan 1, 2004

  • DFI
    Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice

    By Martin D. Larisch, Ronald Damen

    The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre

    May 1, 2022