Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development Of Experimental Procedures To Analyze Copper Agglomerate StabilityBy K. A. Lewandowski
The efficiency of heap leaching is reduced by poor solution flow characteristics (i.e., channeling and ponding) that result from fines migration. Agglomeration of the ore can immobilize fines, but for
Jan 1, 2008
-
The Challenge of Precise Measurement of PrecisionBy John Watson, Jay Rodgers
The world of blasting and explosive use continues to evolve into one which relies heavily on measurement, quantification, process control, and information feedback as a means of contributing to operat
Jan 1, 1998
-
Potencial de energía eólica y minihidráulica en las cuencas bajas de los ríos de las cordilleras, dada su topologíaBy José Salas, Vicente Salas, Fredy Butrón
El objetivo principal, de la presente investigación aplicada, es determinar cuantitativamente, la viabilidad tecnológica, del aprovechamiento de la energía eólica, minihidráulica, y combinadas de los
Sep 29, 2023
-
The Use Of Low-Toxic Heavy Suspensions In Mineral Sands Evaluation And Zircon FractionationBy Stafford McKnight, Larissa Koroznikova, Steve Hall, Cameron Klutke
This paper outlines a simple methodology for mineral characterisation, developed as part of the Australian Mineral Industry Research Association (AMIRA) managed research project P777 ?The Development
Jan 1, 2007
-
Productividad comparada de los hornos empleados en la fundición de cátodos de zinc en La OroyaBy José E. Rondoña
El presente trabajo desarrolla un estudio comparativo de la producción de dos tipos de hornos usados en la fundición de cátodos de zinc en la planta de La Oroya, para asi determinar cúal es el equipo
Nov 20, 1967
-
Characterization of the Flexural Properties of Polyester Matrix Composites Reinforced with Continuous Jute FibersBy Sergio N. Monteiro
Jute fiber reinforced polymer composites are among the most investigated and applied natural composites. In this past decade the mechanical properties of these composites has been assessed for various
Jan 1, 2010
-
Nanosecond Electrical Discharges between Semiconducting Sulfide Mineral Particles in WaterBy Igor Zh. Bunin
A model for developing electric discharges between sulfide mineral (pyrite) particles under high-voltage nanosecond pulses in a liquid medium (water) is considered. A possibility of electrical breakdo
Jan 1, 2010
-
Characterization and distribution of chrome spinel grains in magnetically fractionated ilmenite concentratesThe distribution of chrome spinels in a magnetically fractionated ilmenite concentrate sourced from the Murray Basin was characterized by XRF assaying, quantitative electron microprobeanalysis, grain
Jan 1, 2003
-
Future Supply Of Silver And GoldBy Gordon M. Miner
When I was originally invited to speak to this audience on the subject of the future supply of precious metals I was somewhat apprehensive and suggested that the Program Chairman select someone with m
Jan 1, 1980
-
Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical ApproachBy Rajagopala Reddy Kallu
After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo
Jan 1, 2007
-
IC 7105 Annual Report Of Research And Technologic Work On Coal, Fiscal Year 1939 ? IntroductionBy A. C. Fieldner
This report is the fourth of a series of annual summaries of research and technologic work on coal by the Technologic Branch of the Bureau of Mines. The coal research program of the Bureau has been
Jan 1, 1940
-
MLA 24-87 - Mineral Resources Of The Zwagg Island Wilderness Study Area, Curry County, Oregon ? SummaryBy Edward L. McHugh
In 1986, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied the 5-acre Zwagg Island Wilderness Study Area (OR-12-14) in order to evaluate its identified mineral res
Jan 1, 1987
-
Application Of A High-Intensity Cooling System To DC-Arc Furnace Production Of Ferrocobalt At ChambishiBy L. R. Nelson
A review is presented of the furnace cooling system design and operating developments since the initial furnace start-up in January 2001 of the Chambishi DC-arc furnace to produce ferrocobalt alloy. T
Jan 1, 2004
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
The New System of Structural Analysis in DrillcoreA comprehensive analysis of rock structures in non-oriented (axially oriented) drillcore is now available (Laing, in press). The system embodies new concepts which better equip the geologist and engin
Jan 1, 1990
-
Mineral Resources Of The Seven Blackfoot Study Area, Garfield County, Montana ? SummaryBy Michael S. Miller
In 1984, at the request of Bureau of Land Management, the Bureau of Mines studied 8,500 acres of the 20,250-acre Seven Blackfoot Wilderness Study Area (WSA) consisting of all 3,950 acres of MT-024-657
Jan 1, 1986
-
Logistical Processes in the Explosives Industry Using Examples from Daily WorkBy Frank Hirthammer
Productivity, customer relations, and effectiveness of work depend to an ever-increasing extent on a functioning logistics system tailored to the needs of the user. Of course, it is not possible to co
Jan 1, 2019
-
High-pressure direct injection of natural gas in a diesel engine for high performance/low emissions (ace69f9b-8abb-4cd4-9306-9db2c42ce4ca)By K. B. Hodgins, P. Ouellette
"The North American mining industry faces challenging emissions regulations in the coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, indu
Jan 1, 2005
-
Feasibility And Implementation Of Shield Machine Tunnel Passing Through An Operating Airport RunwayBy Hongjie Yang
The No. 10 metro line of Shanghai city is 36 kilometers in length and will pass through the operating airport runway by using tunnel boring machine with earth pres-sure balance mode. Although there ar
-
OFR-30-82 In-Mine Tests For Wetting Agent EffectivenessBy J. A. Kost
The objective of Contract J0295041 was to determine if the addition of a surfactant (wetting agent) to the water used for dust control in underground coal mines results in the reduction of airborne du
Jan 1, 1980