Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)

    By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves

    The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t

    Jan 21, 2025

  • ISEE
    Drilling & Blasting of a Small Diameter Shaft Next to Historic Structure

    By Corry Goumans, Ron J. Elliot

    This paper discusses the challenges encountered in drilling and blasting of a small diameter shaft underneath a parking garage in historic Gastown, Vancouver, BC. This project involved drilling in a r

    Jan 1, 2004

  • ISEE
    Removing Booster Influences from Toxic Fumes

    By Michael S. Wieland

    "This report investigates whether it is tractable and thereupon reasonable to remove the boosterinfluences when ranking the toxic fumes of non-cap-sensitive mining explosives. The hazard potential is

    Jan 1, 1999

  • ISEE
    Tennessee's Largest Pipe Installation

    By James R. Houston, Wendel Clay Chaffin, John Loviza

    During the spring and summer of 1993 the largest pipeline in Tennessee was installed as part of the upgrading of Nashville's sewage needs through the year 2035. This new 3.3 million dollar outfall pro

    Jan 1, 1995

  • ISEE
    An Empirical Method of Comparing Brisance of Various Bulk Explosives

    By Neal Lee, Braden T. Lusk, Brendan McCray

    "Selection of a blasting agent for optimum performance is based on many variables. Often, a decision is made with regard to product cost and field testing. Defining optimum performance can be difficul

    Jan 1, 2017

  • ISEE
    Implementation of a Remote Blasting Engineering Center in Peru

    By Jorge Cárdenas, Luis Huaroc, Máximo Cari, Nestor Delgado

    In Peru, after four years of pandemic, some mining companies have chosen to install integrated operating centers in central offices where through network technology and video surveillance it allows th

    Jan 21, 2025

  • ISEE
    Application of the Selective Loading to the Rock Mass Characterized through Drill Monitoring for Autonomous and Manual Drilling Mode to Optimize Blasting Results in Open Pit Operations

    By Jorge Blázquez, Pablo Ravanal, Paulo Couceiro, Juan Navarro

    Blasting performance is influenced by rock mass properties and blast design parameters. From them, the rock is the only variable that cannot be modified, but it can be measured, so that, blast design

    Feb 6, 2023

  • ISEE
    Preventing the next Terrorist Attack is a Shared Responsibility

    By Joseph Kennedy

    How do terrorists and other criminal bombers acquire explosives to be used in an attack against U.S property and/or citizens? The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) with nearly

    Jan 1, 2010

  • ISEE
    Effects of Mid-Field Surface Blasts on a Tall Scaled Target

    By Ethan Steward, Kyle Perry

    Blast resistant structural design continues to be a research area of major concern for governments around the world due to explosive threats from both state and non-state actors. Glass and aluminum cu

    Jan 21, 2025

  • ISEE
    Natural Cavities in Iron Ore Deposits in Brazilian Northern Region: Challenges and Strategies

    By Anderson Meireles, Leonardo Soares Chaves, Raul Carretero Hoz, Carlos Eduardo Soares Feliciano, Renato Jacome Costa

    The large iron deposits in the northern region of Brazil located in the Amazon Craton have in common the presence of natural cavities. These cavities primarily occur in the upper layer of the ore body

    Jan 21, 2025

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal Mine

    By Ajoy Singh

    A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex

    Jan 1, 2012

  • ISEE
    Municipal Blasting: Blast Design, Vibration Monitoring & Control

    By Frank Lucca

    This paper includes research and investigation into blast design and blast optimization for vibration control in municipal and tight blasting situations, where specifications were extremely stringent.

    Jan 1, 2004

  • ISEE
    Use of Electronic Initiation System in Urban Shaft Sinking Project

    By Richard Turnbull, James Purssey

    "The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be

    Jan 1, 2017

  • ISEE
    Chemically Sensitised Bulk Emulsions and Pump Systems Used in Hong Kong Underground Civil Works

    By Weyman CT Ngain, Brian J. Kennedy

    Innovative chemically sensitised bulk emulsion explosives and pump delivery systems have provided contractors participating in the highly competitive Hong Kong underground construction market with a s

    Jan 1, 1997

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    Correlating Near-Source Damage from Single-Hole Explosions to Seismic Waves

    By Randy Martin, Jessie Bonner, Peter Boyd, Mark Leidig, Timothy Rath

    We conducted the Vermont Damage Experiment in central Vermont during July 2008. Five single-hole explosions with yields ranging from 60.8 kg (134 lbs) to 122.5 kg (270 lbs) were detonated in homogeneo

    Jan 1, 2010

  • ISEE
    Blasting Design and High-Energy Explosive Strategies to Achieve Fines Targets for Mill Performance

    By Jorge Cardenas, Diego Sanchez

    Maximizing SAG mill throughput and metallurgical recovery in hard rock operations requires achieving target fragmentation, particularly a sufficient proportion of fines (<25.4 mm). These fines thresho

    Jan 26, 2026

  • ISEE
    Improving Drilling and Blasting By Using TQM and Appropriate IT

    By John Hutchings

    Drilling and blasting is a clearly delineated work process, which has well defined inputs and outputs. Drilling and blasting is also a process with a number of steps each of which has measurable outco

    Jan 1, 2004

  • ISEE
    Fewer Surprises When You Measure the Sizes

    By Tom C. Palangio

    Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co

    Jan 1, 2016