Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Influence of a Pipe Reactor to Improve Pre-Oxidation and Gold Recovery and Lower Cyanide ConsumptionBy G Senanayake, J Andreazza
The general experience in gold cyanidation research activities and plant practice is that high oxygen and cyanide concentrations improve gold leaching kinetics which in turn reduce residence time and
Jan 1, 2002
-
BOCCOST Modelling Tracking and Relating Mine and Mill Performance Indicators in Real Time to Increase SAG Mill ThroughputBy L E. Setiawan
The mining and milling groups at Batu Hijau are tasked with increasing SAG mill throughput by approximately ten per cent. Avenues used for this process are blasting and crushing optimisation, ore blen
Jan 1, 2002
-
The Use of Computer Based Blasting Models in Mine Feasibility AnalysesBy S Williams, N McBride
The aim of these analyses was to utilise the latest available production information for the Wandoo operation to determine the optimal blasting parameters, costing information and predicted results (f
Jan 1, 1999
-
Flotation Purification of Kaolin Clay With Hydroxamate CollectorsBy S A. Ravishankar, W Perez
Flotation is one of the main concentration processes to purify kaolin clay via the removal of naturally occurring impurity minerals containing Ti and Fe. Currently, there are two types of collector ch
Jan 1, 2005
-
Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes MinesBy F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan
"Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th
Oct 10, 2016
-
Fast and Efficient Procedures for Stability Analysis Using Generalised Limit Equilibrium MethodBy Arit I, Adisoma G
General Limit Equilibrium Method (GLE) and Janbu's Generalised Procedure of Slices (GPS) are two limit equilibrium methods in slope stability analysis which satisfy all equilibrium conditions.
Jan 1, 1998
-
The Economic Impact of Artificial Support in Open Pit MinesBy Fuller P. G, Dugan K. J
Artificial support can be used to improve wall stability in open pit mines. This is examined for a particular case where the factor of safety for a slope is kept constant by using artificial support
Jan 1, 1989
-
Study on Improving Roasting Behaviours and Metallurgical Properties of Brazilian Hematite Pellets by Adding Magnetite with High Sulfur ContentBy Z Li, J Pan, D Zhu, W Zhou
In order to enhance the roasting behaviours and metallurgical properties of hematite pellets, which have the problems of high roasting temperature and low compressive strength, a process of producing
Aug 12, 2013
-
Engineering for Mining InfrastructureInfrastructure is defined as all those parts of a mining development which are not directly concerned with mining and mineral processing. Infrastructure is of significant and growing importance in
Jan 1, 1974
-
Evaluation of a UAV-LiDAR system for mapping geological structures in an open pit highwallBy B Banerjee, H Masoumi, X Shen, S Raval, D Tannant
Structural mapping of pit walls can be performed using digital images and photogrammetry software, but the performance is limited by weather and environmental conditions including dust, rain and light
Nov 30, 2018
-
The Application of Heavy-Media Separation and Static Dry Cleaning of Coal at the Broken Hill Pty. Co. Ltd. Steelworks, NewcastleBy Martin C. H, Met B
INDEX OF CONTENTS:1. Introduction, Explanatory; and Reasons for Coal Cleaning.2. Principles on which Coal Cleaning is based.3. Location of Broken Hill Proprietary Co. Ltd. Plant.4. Description of Proc
Jan 1, 1946
-
Slime waste to boost agricultural productivityBy A K. Bhatnagar, S Saha, P Dixit, A K. Mukherjee, P Patra
TATA Steel’s R&D Division at Jamshedpur has developed a slime beneficiation process to recover iron values from iron ore slime. This process recovers iron ore concentrate containing 2.2 per cent alumi
Sep 18, 2023
-
Ore recovery on a room and pillar zinc mineBy J Santana, V Ferraz, G Pinto, G Cruzado
Morro Agudo is an underground zinc and lead mine owned by Nexa Resources. The mine uses room and pillar as the main mining method. The recovery of pillars as well as the opening of new excavations usi
Nov 29, 2022
-
A Review of the Broken Hill Lead-Silver-Zinc IndustryBefore presentIng my address I wish to acknowledge the honour which has been conferred on me by my appointment to the position of President of the Australasian Institute of Mining and Metallurgy.It is
Jan 1, 1940
-
Gaskets for Segmental Tunnel Liners - New Development Since the Channel TunnelElastomeric compression gaskets for segmental tunnel liners are capable of fulfilling all sealing requirements for one pass constructed tunnels.Once the segments are mounted and the gaskets are compre
Jan 1, 1993
-
The Growing importance of Gold in Eastern AustraliaThe 1980's have produced an outstanding revival of the Australian gold industry. In contrast to some previous mining booms, the economic aspects of the growth in gold production are soundly
Jan 1, 1987
-
New Developments in Manganese Module Prospects, with Emphasis on the Australasian RegionBy Colwell JB, Cronan DS
Manganese nodules cover great areas of deep ocean floor far from land, and have long been considered a major potential resource of nickel, copper, cobalt and perhaps manganese. A decade ago there was
Jan 1, 1990
-
Development of New High-Strenght Zinc AlloysBy Kubo H, Ninomiya R, Ojiro T, Sato T
New high-strength Zn alloys for moulds are demanded from the automobile and electric industries in Japan, because the s rength of Zn moulds is still not high enough for the mass production. There ar
Jan 1, 1993
-
Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case StudyAn enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over
Aug 1, 2010
-
New Tailings Dam at Ardlethan Tin N.L.In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of
Jan 1, 1978