    Reducing the Variability in Dragline Operator Performance

    Australian coal mines have spent considerable capital on dragline improvements over the last two years. This has included ~$30 M on UDD conversions, >$20 M on new buckets, boom upgrades, electrical up

    Jan 1, 2005

  • AUSIMM
    Construction and Utilisation of the Olympic Dam Service Decline

    The mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a

    Jan 1, 1988

  • AUSIMM
    Emperor Expands in Fiji -- A Province with Good Potential for Extensive Gold Deposits

    By Barclay C, Jacobsen M, Towsey C

    The Emperor Gold mine at Vatukoula, Fiji, is a nine million ounce gold telluride deposit. In January 1992, the mine was on the verge of closure when the current management team took charge. Losses had

    Jan 1, 1997

  • AUSIMM
    Thermal Reactivation of Carbon Used in the Recovery of Gold from Cyanide Pulps and Solutions

    By Miovski P, Hooft P. V

    In the majority of recently commissioned gold mines granular activated carbon is used to adsorb gold from alkaline cyanide pulps or solutions. At the same time the carbon also adsorbs many other i

    Jan 1, 1987

  • AUSIMM
    Development of the West Cliff Extended Project

    In the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti

    Jan 1, 1983

  • AUSIMM
    Fragmentation - The Future

    The mining industry is facing tremendous economic challenges. Fluctuating and depressed commodity prices, the ever-increasing pressure from environmental legislation and the competing global opport

    Jan 1, 1995

  • AUSIMM
    Microprospecting for Minerals of the Platinum Group Elements

    By Woodcock J. T, Rummel P. H, Sparrow G. J, MacRae C. M

    A rapid automated search method, developed for the location of native gold grains in polished sections with a scanning electron microscope (SEM), has been extended to locate platinum group elements

    Jan 1, 1991

  • AUSIMM
    The Geological History of the Environment The Influence of Sand Mining of the Environment Spatial Relations in the Mining Province

    The environment under discussion is that of the sandy coastal plain and adjacent offshore sandy islands. The environment is the result of natural forces of the past which moulded it. Only very rece

    Jan 1, 1971

  • AUSIMM
    Comparison of Rock Tunnel Excavation Methods Used on the Melbourne Underground Rail Loop

    This paper describes the programing and specification requirements which affected the choice of excavation methods on the Melbourne Underground Rail Loop (M.U.R.L.). The various methods that were

    Jan 1, 1981

  • AUSIMM
    The Foundation of the Institute, and its First Ten Years

    When Matthew Flinders entered in his log `This land forms the South side of the large bight; and besides projecting beyond the coast line, and being a little higher than usual is remarkable for having

    Jan 1, 1993

  • AUSIMM
    Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?

    By Williams P. A

    Tailings dams constructed by the upstream method have traditionally been built using the sand fraction of the tailings, which has automatically provided a relatively permeable embankment material, and

    Jan 1, 1992

  • AUSIMM
    Concentration of Fine Grained Heavy Minerals Using the Kelsey Centrifugal Jig

    By Waldram JT

    The Kelsey Centrifugal Jig incorpo- rates the principles of operation of a conventional mineral jig, at the same time utilising high centrifugal forces to extend concentration to very fine heavy m

    Jan 1, 1986

  • AUSIMM
    A Sustainable Mine Water Treatment Initiative to Provide Potable Water for a South African City ù A Public-Private Partnership

    By A M. van Niekerk, W Mey

    Coal mining has an impact on the water management of the water scarce Upper Olifants River Catchment. A prefeasibility study was carried out by Anglo Coal and Ingwe Collieries Limited to establish the

    Jan 1, 2006

  • AUSIMM
    The Development and Implementation of a Three Dimensional Model of Blast Fragmentation and Damage

    By Cocker A, Kavetsky A

    A numerical model describing blast fragmentation and damage in three dimensions has been developed at the Julius Kruuschnitt Mineral Research Centre (JKMRC) and applied to numerous blasting operatio

    Jan 1, 1990

  • AUSIMM
    Experience with Boiler Furnace Walls at Mount Isa Mines Limited's Power Plant

    By Crawford M

    During the initial development of Mount Isa Mines power was supplied from a temporary power plant situated near the Man & Supply Shaft. The main power plant was placed in service early in 1931 and

    Jan 1, 1939

  • AUSIMM
    Sub-Surface Cracks due to Disc Cutter Spacing for Improved Rock Breakage and Ground Control

    By Guo H

    The importance of using disc cutters for rock excavation is reflected by their wide application in hard rock cutting machines such as tunnel boring machines and raise borers. The forces involved in

    Jan 1, 1992

  • AUSIMM
    Life of Mine Land Use Plan - Comalco Weipa

    This paper outlines the aims, objectives and means by which a life of mine land use plan was established for Comalco's bauxite mine at Weipa. Comalco realises the need to strategically plan for f

    Jan 1, 1992

  • AUSIMM
    A Short History of Coal Mining with a Review of Coal Mining Operations and A Glossary of Mining Terms Used

    By Sneddon J

    This Is not a highly technical paper, but rather an attempt to give a general outline of coal mining for the benefit of those present who may have little or no experience in the industry, and is inten

    Jan 1, 1947

  • AUSIMM
    Design and Rehabilitation of Large External Waste Dumps: a Case Study

    By Fletcher G

    This paper will outline the design process, and the constmction and rehabilitation techniques proposed for the external waste dumps associated with the mining of the Wolfang Basin coal measures.The ba

    Jan 1, 1992

  • AUSIMM
    Controlled Recirculation in South African Gold Mines

    Controlled recirculation of nine ventila- tion air is becoming an acceptable practice world-wide. A brief review of operating and planned schemes is given which illustrates the various purposes for

    Jan 1, 1988