Sampling and Measurement - The Foundation of Accurate Metallurgical AccountingMining companies around the world devote considerable effort to production reconciliation and metallurgical accounting. However, although sampling, weighing and analysis methods used to obtain the raw
Jan 1, 2002
-
Innovative Ground Support SystemBy Fabjanczyk M. W
Artificial ground support has developed into a refined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts a
Jan 1, 1992
-
The New Latent Conditions Clause in the Recent as 2124-1986, General Conditions of Contract and its Application in Tunnelling ContractsThe latent conditions clause in various general conditions of contract have traditionally proved to be a source of significant disputes in tunnelling contracts, even when extensive geotechnical i
Jan 1, 1987
-
Ore Reserves Estimates And Comparisons With Mine Production From The Cattlegrid Orebody, Mt. Gunson, South AustraliaBy Gelding P. W, van Herk H
The Cattlegrid copper orebody is a concealed thin, tabular sheet localised near an unconformity between two sub- horizontal Precambrian sandstone units. It extends over an area of 1,000 m by 500 m
Jan 1, 1979
-
Role of On-Line Analysis in Quality Control of Iron OreBy P J. Mathew
Quality and process control in the iron ore industry is based on measurements of ore grade from blast holes through to shiploading. Traditionally this has been carried out using conventional sampling,
Jan 1, 1998
-
Combustibles in MinesAlthough most N.S.W. coal mines contain large amounts of combustible materials such as coal and timber, the introduction of mechanisation has extended the range of combustible materials now found u
Jan 1, 1981
-
Pulp Density Soft-Sensor for a Grinding CircuitBy Torres F, Cerda I, Gimenez P, Gonzalez G, Castelli L
Slurry density measurement, specially in cyclone feed streams, is fundamental to grinding circuit control. With the purpose of increasing the availability of such a measurement, the design of a soft
Jan 1, 1995
-
Associations and Institutions in Support of the Australian Mineral IndustryThe paper reviews the majority of associations and institutions which operate in support of the Australian mineral industry. The review covers historical aspects of each organisation and the current
Jan 1, 1988
-
Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance TrialsPerformance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance
Jan 1, 1967
-
Geology and Blasting Objectives - Starting at Both EndsA key premise to this paper is that most people involved in the design and implementation of drilling and blasting operations could benefit from a greater understanding of the geological materials, de
Jan 1, 1999
-
The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq
Jan 1, 1978
-
Telfer Train 1 Copper Flotation Circuit ReconfigurationBy A Crawford, P Manton
Telfer is a gold/copper operation, currently operating one open pit mine and one underground mine. The ore processing plant consists of two parallel trains involving semi-autogenous mill, ball mill an
Jan 1, 2009
-
Continuous Improvement at Pasminco Metals - SulphideBy Coates J. R, Firth I. C
The Imperial Smelting Furnace at Cockle Creek, NSW, was constructed in 1961 and is the oldest facility using the Imperial Smelting process in operation. In recent years there have been significant i
Jan 1, 1993
-
A Method of Calculating Autogenous/Semi-Autogenous Grinding Mill Specific Energies Using a Combination of Bond Work Indices and Julius Kruttschnitt Parameters, then Applying Efficiency FactorsBy D Burgess
Since the days of mandatory high cost pilot plant testing in 6 ft + 2 ft SAG mills autogenous griding/semi-autogenous grinding (AG/SAG), mill specific energy is now calculated by various empirical for
Oct 29, 2012
-
The Southwest Pacific : Current and Future MiningThis paper provides an overview of current and future mine developments in the major island nations Indonesia, Papua New Guinea (PNG), New Zealand, and Fiji, and the French territory of New Caledonia.
Jan 1, 1990
-
Acid and Oxygen Plant Commissioning at the Olympic Dam Copper SmelterBy Collins D. N
The Olympic Dam Copper Smelter Acid Plant is a hybrid plant capable of producing sulphuric acid from either sulphur burning, metallurgical gases or a combination of both. Commissioning of the Acid
Jan 1, 1989
-
Outsource or Owner OperateThe decision to contract or owner mine should be independent of, and should be made before, definitive estimated cost comparisons could be available. There is substantial potential risk of estimated c
Jan 1, 2003
-
The Proterozoic Geology of the North-West Division of Western AustraliaThree main divisions of the. Proterozoic are recognised in the North- West of Western Australia. These are referred to, in order of decreasing age as the Mt. Bruce Supergroup, the Bresnahan Group and
Jan 1, 1964
-
The Application Of Ditch Witch Sampling In Oxidised Open Cut Gold MinesThe current boom conditions in the Gold Mining Industry, open cut low grade gold mines have become the initial cash flow source for most companies. To achieve the required cash flow the head grade
Jan 1, 1987
-
Computer Technology in Mine Surveying, Planning and DraftingBy Bebb G
This paper describes the use of SURPAC, a survey/mine planning software package as used at Central Norseman Gold. It details the basic operating principles of the package, the applications in which it
Jan 1, 1985