Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water SystemBy Jean-Pierre Nossereau, Allen J. Hulshizer
The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in
Jan 1, 1981
-
Process for the Recovery of Pure Palladium and Platinum Using an 8-Hydroxyquinoline ExtractantBy S. Monette, D. B. Dreisinger, D. Vleeschhouwer, G. B. Harris, G. A. Kordosky
A new process for the recovery of pure (>99.95%) palladium and platinum is described. The process, which has been tested at the pilot scale, comprises (i) the simultaneous solvent extraction of pallad
Jan 1, 1993
-
Shaft And Tunnel Lining Techniques Used At The Rocky Mountain Pumped Storage ProjectBy W. D. Presley, T. R. Harrell
This paper will be a case history of the shaft and tunnel concrete lining techniques used at the Rocky Mountain Pumped Storage Project located in northwest Georgia. Emphasis will be placed on the shaf
Jan 1, 1985
-
Design Of Mount Baker Ridge Freeway Tunnel In SeattleBy E. B. Johnson, G. Kjerbol, L. J. Holloway
The Mount Baker Ridge Tunnel is a major improvement of Interstate Route 90 in the State of Washington. The total length of planned underground construction is about 3,400 feet (1,040 m) of which 1,332
Jan 1, 1983
-
The Design And Operation Of Industrial Sulfide Mineralsize Reduction Circuits From The Viewpoint Of Maximizing Downstream Froth Flotation ProcessesBy Richard R. Klimpel
This paper discusses some important industrial interactions between size reduction and downstream froth flotation processes. Experience gained at the industrial level is clearly indicating that how si
Jan 1, 1995
-
Advanced Grinding Process Control System At Escondida Laguna SecaBy John Reynolds, Robert Sloan
The Escondida copper mine is located in the northern Atacama Desert of Chile at an elevation of 3,050 m. approximately 160 km southeast of the port of Antofagasta. The mine is a joint venture betwee
Jan 1, 2005
-
Chemical Oxidation of Municipal Landfill LeachatesBy Shuang Shuang Huang, John Fillos
Ozonation was evaluated as an alternative treatment process for leachates of municipal landfills. The study was carried out on leachate from the Fresh Kills Landfill, New York City. The leachate has s
Jan 1, 1992
-
Self-Propelled Abrasive Jet Reamer/Miner For Deviated Boreholes In Hard RockBy John H. Archibald, Arthur L. Miller, George A. Savanick
As part of its continuing research on selective mining, the Bureau of Mines has made progress toward developing a tool capable of remotely extracting hard minerals through a borehole. As the successor
Jan 1, 1991
-
Mineral Property Selection, Improvement And Disposition, How Small Companies CompeteBy J. R. Beeder
Minerals Engineering Company (MECO) is a relatively small, promotionally oriented mineral exploration company founded in Colorado in 1948 during the height of the uranium boom. The company has been: 1
Jan 1, 1979
-
Extraction of copper from chalcopyrite concentrates without sulfuric acid generation via chlorination - Part 2: Selective oxidation of chlorinated productsBy T. Tamagawa, I. Iwasaki, N. X. Fu, M. Kobayashi
A low-temperature-chlorination selective oxidation followed by aqueous chloride leaching and SX-EW for producing electrolytic copper, elemental sulfur and ferric oxide was investigated for hydrometall
Jan 1, 2000
-
Bay Park Conveyance Project, New York—Construction Update - RETC2023By David I. Smith, Kenneth Arnold, Bryan Aweh, Vincent Falkowsk, Brian Lakin, Andy Fer
Nassau County, New York, is undertaking several projects to improve the water quality in the Western Bays of Long Island. A major step forward will be the completion of the Bay Park Conveyance Project
Jun 13, 2023
-
Limestone-Nature's Gift To The EnvironmentBy F. A. Renninger
Limestone and dolomite are the most common rock types mined and quarried as industrial minerals in the United States. In 1993 over 720 million tons of limestone and dolomite valued at over 3.1 billion
Jan 1, 1995
-
Construction of the Inter-Island Tunnel Boston Harbor ProjectBy A. J. Stewart, R. L. Shufflebotham, D. W. Ferguson, T. L. Page
The Inter-Island Tunnel is a 7.7 kilometer (25,160 foot) long by 3.5 meter (11.5 feet) diameter concrete lined tunnel through the Cambridge formation below Boston Harbor. Constructed as part of the Bo
Jan 1, 1997
-
The Narragansett Bay Commission’s Deep Tunnel CSO ProjectBy Wern-ping Chen, Joseph Pratt, Thomas G. Brueckner, Tracy K. Lundin
To address and mitigate discharges from combined sewer overflows in the Providence, Rhode Island area, the Narragansett Bay Commission completed a comprehensive Combined Sewer Overflow (CSO) Facilitie
Jan 1, 1999
-
High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access ShaftBy T. Eggenberg
Mechanization and automation of logistic equipment has become one of the main key factors in raising productivity and competitiveness especially for complex and larger mining or tunneling projects.
Jan 1, 2010
-
Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021By Michael Schultz, Gregory Sanders
The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ
Jun 13, 2021
-
Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021By Joshua Farmer, Mike Gianforte, Tao Jiang, William Gettings
The Two Rivers Water Reclamation Authority (TRWRA) in Monmouth County, New Jersey, is replacing its aging Pleasure Bay Interceptor (PBI) with a new 54-in interceptor in a 3,250-foot long 8 to 10-foot
Jun 13, 2021
-
Process Choices For Carbon TechnologyBy R M. Whyte, D McArthur, A Macintosh
In designing a gold extraction circuit utilising carbonin-pulp (CIP) technology a number of process options can be considered. These include various combinations of leach or pre-leach, CIP or carbon-
Jan 1, 2000
-
Anticipated Ground Conditions for the Riverside Badlands TunnelBy D. B. Desai, J. T. Waggoner, J. S. Hill, R. R. Redd, S. J. Klein
The 13 km (8 mile) long Riverside Badlands Tunnel is planned for construction starting in 1998. Extensive geotechnical investigations indicate that the 3.7 m (12 ft) finished diameter tunnel will be
Jan 1, 1997
-
The Nature and Stability of Precipitated Solids From Arsenopyrite Bio-Oxidation EffluentsBy A. N. Islam, C. Simons, M. N. Hughes, J. Barrett
The effluent from the bio-oxidation of arsenopyrite contains high concentrations of iron(III) and arsenic(V), the pH being in the range 1.0-1.3. The use of lime to increase the pH causes the precipita
Jan 1, 1991