Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 6014 Composition And Mechanical Properties Of Selected Cold-Mold And Skull-Cast Titanium Alloys ? SummaryBy E. D. Calvert
The objective of this research was to examine variations in melting and forging practice for four titanium-base alloys and to determine their effect on the resultant product. Of particular interest wa
Jan 1, 1962
-
OFR-90-86 Coal Injection In An Experimental Blast Furnace - A Comprehensive ReportBy P. L. Woolf
Blast furnace coal injection tests conducted by the Bureau of Mines in cooperation with a consortium of 22 steel companies in 1963-1964 are described. These tests were part of a program of extensive i
Jan 1, 1985
-
RI 7964 Physical Property Data on Coal Waste Embankment MaterialsBy Richard A. Busch
Inadequate engineering design criteria for coal refuse embankments has allowed hazardous impoundment structures in coal mining areas to be created. A necessary first step to develop adequate design cr
Jan 1, 1974
-
The Oxidation of Stannite Ore at the Sardine Tin Mine, QueenslandBy Baker G
The exposures resulting from development work, following on the discovery of a new shoot of hIgh grade ore at the north end of the Sardine tin mine, during 1952, have provided an unusual opportunity t
Jan 1, 1954
-
IC 8941 Field Determinations Of A Probabilistic Density Function For Slope Stability Analysis Of Tailings EmbankmentsBy P. C. McWilliams
Theoreticians in soil mechanics have been pursuing a probabilistic approach to the factor of safety of an embankment or darn for the past 10 years. The motivation for this work is in contrast to the c
Jan 1, 1983
-
More Than 1,300 Underground Professionals Attend RETCIn June, 1,334 underground construction and tunneling professionals gathered in Toronto, Ontario for the 2007 Rapid Excavation and Tunneling Conference (RETC). This biennial event, sponsored by SME,
Jan 1, 2007
-
Metallurgical Progress in the Australian CommonwealthBy Met M. E
In choosing the subject for my address to you this evening I was actuated by the knowledge that in the past Australian metallurgical problems have been solved by the introduction of extremely interest
Jan 1, 1936
-
TBM Tunneling At The Ashlu Hydropower Project, Squamish, BCBy Serge Moalli
The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4
-
Circuit Modifications at Westmin Resources Myra Falls OperationsBy C. Veloo
"Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.
Jan 1, 1992
-
OFR-13-87 Demonstration Of Minos Coal Clearance System - Final Report: Installation, Operation And Assessment Of Results Of The MINOS System At Barnes & Tucker No 20 MineBy G. S. Beaumont
This report presents a programme of work to demonstrate the use of a surface-based centralised computer control system for the remote monitoring and control of underground conveyors in a US coal mine.
Jan 1, 1986
-
Gestion De Résidus Miniers Stabilisés Par Ajout De Chaux Et De Ciment Chez Zinc Électrolytique Du Canada À Valleyfield, QuébecBy Benoît Demers
Dans ses opérations de traitement de concentré de zinc, l?usine de Zinc Électrolytique du Canada à Valleyfield génère un résidu minier appelé « jarosite ». Jusqu?en 1998, le jarosite était transporté
Nov 1, 2002
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial SoilBy Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Mining - Sinking Two Shafts at the New Beatrix Mine by DrillingBy J. M. Weehuizen
Complete details are given of the drilling method by which two shafts were sunk at the new Beatm'x mine of Staatsmijnen in the Netherlands. The nature of the rock strata in the Dutch mining distr
Jan 1, 1961
-
New Design Software for Rockfall Simple Drapery SystemsBy A. Grimod
Rockfall drapery systems are commonly used as a simple, fast and cheap measure against the rock falling trajectories affecting very steep slopes. The system basically consists of a steel mesh, which i
Aug 1, 2013
-
Gaseous Reduction Of Isasmelt Lead Slag And Lead Blast Furnace SintersBy Baojun Zhao
Primary lead production using the lead blast furnace in conventional practice is carried out using sinter feed. At YMG, China, the sinter plant has been replaced with a lead ISASMELT furnace. The ISAS
Jan 1, 2008
-
The Re-Engineering Of The Ground Handling System At Cullinan Diamond MineBy A. W. Bester
Paper written on project work carried out in partial fulfilment of B. Eng. (Mining Eng.) Cullinan Diamond Mine currently handles 3.2 million tons of run of ore per annum. This is done by means of a
Jan 1, 2005
-
Latitudinal/land-mass proximity controls on ferromanganese crust composition and resource potential, Ninetyeast Ridge, Indian OceanBy Kira Mizell, James R. Hein, Tracy Conrad
"The Ninetyeast Ridge (NER) extends roughly N-S as a topographic feature for 5000 km, from 31° south to 10° north (Fig. 1) where it becomes buried beneath the Bengal Fan at its northern end. These two
Sep 1, 2014
-
Operations Research - Financial Analysis Applications in Mineral Exploration and DevelopmentBy Daniel T. Brian, O&apos
Exploration targets and results in the mining industry are commonly summarized in terms of tonnage and grade. Business appraisals require, as additional information, the expected profit or loss implie
Jan 1, 1970
-
A Hybrid Location MethodologyBy S. M. Spottiswoode
The aim of the hybrid location method is to improve seismic event locations by reducing the effects of errors in the wave velocity of ray paths between each event and each recording site. We report on
Jan 1, 2005
-
The Influence of Impurities on the Properties of Lead Part VI - The influence of Tellurium on the Creep Rate of Commercial LeadBy Met M, Worner H. K
In pursuance of the investigation into the influence of various elements on the properties of lead during the past year, the effect of several elements on the creep rate of commercially pure lead has
Jan 1, 1936