Search Documents

  • AUSIMM
    Avoid Average Design in Processing Plants

    The quantity, quality and detail of project information increases as project development moves from initial scoping level studies, to pre-feasibility and option studies, then definitive feasibility st

    Jan 1, 2004

  • SAIMM
    Reduction Of Emissions From Ferroalloy Furnaces

    By B. Andresen, S. T. Johansen, H. Tveit, S. Grådahl, B. Ravary

    The Norwegian ferroalloy industry has high ambitions regarding environmental standards. Basic research work has been performed to improve the fundamental understanding of ferroalloy processes and the

    Jan 1, 2007

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • TMS
    The Cathode Process of Aluminum Chloride Electrolysis

    By R. Tunold, Y. J. Zhang

    "The cathodic kinetics of aluminum deposition from aluminum chloridealkali chloride melts was studied by use of electro-cnemical transient techniques at 700 °C. Aluminum deposited as an insoluble prod

    Jan 1, 1988

  • NIOSH
    RI 7353 Electrowinning Aluminum From Aluminum Chloride - Operation Of A Single-Compartment Cell

    By D. E. Kirby

    The electrochemical reduction of AlC13 was investigated as a process for the production of aluminum. An externally heated, single-compartment cell with a rammed refractory lining was used with molten

    Jan 1, 1970

  • DFI
    Full-Scale Field Investigations & Numerical Analyses of Innovative Seismic Composite Fiber Reinforced Polymer and Reinforced Grouted Helical Screw Instrumented Piles Under Axial & Lateral Monotonic & Cyclic Loadings

    By M. Hesham El Naggar, Yasser Abdelghany

    "ABSTRACT: The axial and lateral monotonic and cyclic behavior of helical pile foundations was investigated and new innovative helical screw systems suitable for seismic loadings were developed and pa

    Jan 1, 2014

  • AUSIMM
    Ore Mineralogy of the BM37 Shoot of the Karangahake Deposit, New Zealand

    By P Atkinson, M P. Simpson, J R. Kyle

    BM37 is a bonanza-grade (>30 ppm Au) ore shoot of the Maria Lode of the Karangahake adularia-sericite epithermal deposit in the southern Hauraki Goldfield. Samples from BM37 contain up to weight pe

    Jan 1, 2006

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • AIME
    U.S. Bureau of Mines Preliminary Report

    A record $19.7 billion in minerals was produced by United States industries in 1963. This was some $800 million above the previous high established in 1962. Preliminary statistics compiled by the U.S.

    Jan 2, 1964

  • SME
    Monitoring Reclaimed Mine Land For Stray CO2 Hazards

    By M. Moagabo

    CO2 emissions from carbonate laden reclaimed mine spoil has been shown to pose a hazard to residents in homes built on or adjacent to such land. The objective of this project was to develop a soil CO2

    Jan 1, 2012

  • CIM
    Uranium Processing, A Review of Canadian Developments

    By K. D. Hester

    "1.0 INTRODUCTIONThe uranium industry started in Canada with the reopening of the gravity concentrator at Eldorado's Port Radium mine in the North West Territories in 1942. In 1948, uranium exploratio

    Jan 1, 1987

  • SME
    Silica Control At Reserve Mining Company

    By W. J. Nosek

    Reserve Mining Company completed construction on a major process modification project in June of 1980. These modifications enabled Reserve to reduce and control its final iron ore pellet silica conten

    Jan 1, 1983

  • ISEE
    Digital Detonators keep PA Coal Mine Operating

    By Douglas Bartley, Jay Elkin

    The state of Pennsylvania was at one time one of the leading coal producing states in the east. However, legislation and industry trends over the last 10 years have adversely affected the amount of bi

    Jan 1, 2003

  • SME
    Super Cycle: The Future

    By Douglas B. Silver

    Super Cycle future The final topic is mining?s future. The most important questions are ?How much longer is the Super Cycle going to last? What should we expect to see going forward? How will the Sup

    Jan 1, 2008

  • SME
    Palygorskite (Attapulgite) In Central China - Preprint 09-035

    By H. H. Murray

    The largest reserves of palygorskite in the world are located in Anhui and Jiangsu Provinces in East Central China. The deposits are Middle Miocene in age and range from 3 to 6 m in thickness. The d

    Jan 1, 2009

  • SME
    Groundwater Control For Two-Pass Soft Ground Tunneling

    By Cary Hirner, David Stacey, William A. Rochford

    Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T

    Jan 1, 2007

  • AIME
  • NIOSH
    RI 6008 Low-Temperature Phase Equilibria Of Helium-Bearing Natural Gases: Exell Gas ? Summary

    By W. J. Boone

    The Bureau of Mines has programmed for publication a series of Reports of Investigations of studies it has undertaken on low-temperature phase equilibria of several helium-bearing natural gases. This

    Jan 1, 1962

  • SME
    CFD Study On Hot Spot Location In Longwall Gob - Introduction - Preprint 09-064

    By S. Lolon

    Spontaneous combustion in underground coal mines has become a serious problem particularly in the caved area (gob). Recent statistic has shown that approximately 17% of total 87 underground coal mine

    Jan 1, 2009

  • AUSIMM
    Practical Stope Reconciliation in Large-scale Operations Part 2, Olympic Dam, South Australia

    By J Wesseloo and Y Kim, Y Potvin, G Mungur, D Grant

    At the previous MassMin conference held in Sudbury in 2012, the authors proposed a new framework going beyond dilution and equivalent linear overbreak sloughing (ELOS) for stope reconciliation in rela

    May 9, 2016