Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of Dot Tunneling Method to Construction of Multi¬service Utility Tunnel Adjacent to Important StructuresBy Akihiro Higashide, Roy H. Patten
The DOT Tunneling method combines two conventional earth pressure balance shield machines in an overlapping cylindrical arrangement. The method allows two tunnels to be driven simultaneously with mini
Jan 1, 1995
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
Automating Modeling Of Operational Data To Identify The Most Important FactorsBy S. Agarwal
The mining industry collects a significant amount of operational data. However, gleaning useful information from the terabytes of data is difficult, and not just because of the sheer volume of the da
Jan 1, 2011
-
Using Rock Geomechanical Characteristics to Estimate Bond Work Index for Mining Production Blocks - Mining, Metallurgy & Exploration (2021)By Omid Asghari, Amin Mousavi, Arshad Ranjbar
Geometallurgical modeling of the production benches is an attempt to estimate the geometallurgical variables of the different ore domains, which leads to a better understanding of the ore and its prop
Oct 28, 2021
-
Decline Development At The Lakeshore PropertyBy Robert S. Hendricks
LOCATION AND HISTORY The Lakeshore Copper property is located on the Papago Indian Reservation approximately 30 miles South of Casa Grande, Arizona. This major porphyry type deposit was discovered
Jan 1, 1997
-
Mine and Mill Labor Productivity Study Shows Wide Range of ValuesBy Leons Kovisars
Introduction Labor is the major cost element for most mining operations. Labor costs are continually increasing, both in nominal and constant terms. This is true in developed as well as less develope
Jan 11, 1983
-
Solid Phase Characterization For Metal Mine Waste Drainage Quality PredictionBy K. Lapakko
Several static tests estimate the capacity of mine waste to produce and neutralize acid and are used as tools for predicting metal-mine waste drainage quality. Various methods and their accuracies ar
Jan 1, 2003
-
Organic Substrate Selection Criteria For Sulfate Reduction Treatment Of Mining Influenced Waters ? IntroductionBy P. A. Hagerty
Biological treatment of metals-impacted water using sulfate reduction is a viable means of treatment that has been applied in pilot and full scale at numerous projects. One of the fundamental challen
Jan 1, 2011
-
Collaborative Strategic Research Initiatives: Their Benefits and Best Practice Approaches for Establishing the SameBy Daniel Brutto
"Environmental considerations are a key driver within marine mining consenting processes across different national and international legislative regimes and are critical in shaping the global public p
Sep 1, 2014
-
Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, ArizonaBy William D. Leech, Ronald E. Romley, Gary N. Sheppard
The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The
Jan 1, 1991
-
Creation Of An Underground Mine Development Sequencing OptimizerBy M. J. Blattman
Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret
Jan 1, 2003
-
GIS and Bauxite Mining in JamaicaBy Jim Baumann
Deposited millions of years ago in irregular paleokarstic channels, Jamaica’s extensive bauxite deposits provide good quality ore for alumina production and subsequent aluminum smelting. Bauxite minin
Jan 1, 2002
-
TBM Excavability: Prediction and Machine–Rock InteractionBy Z. T. Bieniawski, José Miguel Galera, Benjamín Celada
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj
Jan 1, 2007
-
Improving Leaching Recovery Of Copper From Low-Grade Chalcopyrite OresBy J. M. Ekenes
New approaches that increase hydrometallurgical recovery from refractory minerals in below-mill-cut-off-grade sulfide copper ore can add significant value, improve profitability and increase ore reser
Jan 1, 2012
-
Rewards and Frustrations of Female Mining EngineersBy Christy Z. Lueders
Introduction More and more women engineers are joining the traditionally male mining industry. Are they successful? Do they encounter special problems? How do men in mining respond? How can the minin
Jan 10, 1981
-
Mining Company of the Future;Anglo American CEO Joins Group to Open DiscussionBy William Gleason
The mining industry is at a crossroads. Currently, there is an estimated $25 billion worth of projects around the world that have been stopped as the consequence of a dispute or disagreement with thei
-
Evaluation Of Cyanide Producing Microorganisms To Recover Gold From Low-Grade Ore ? IntroductionBy D. Shin
The gold leaching using cyanide from ore or waste has been almost universally in use [1]. Recently, biological gold bioleaching using cyanide producing bacteria, e.g. Chromobacterium violaceum, Pseudo
Jan 1, 2012
-
Cresson Mine Completes Two-Year ExpansionBy William R. Yernberg
The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini
Jan 1, 2002
-
Results given of studies concerning methane extraction from coalbedsBy M. A. Trevits, G. L. Finfinger
Various methods have been developed through US Bureau of Mines research to remove gas in advance of, during, and subsequent to mining. These include drilling horizontal or cross-measure boreholes from
Jan 8, 1986
-
New Crystal Springs Bypass (Polhemus) Tunnel—Design ChallengesBy Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang
The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit
Jan 1, 2007