Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Application of Dot Tunneling Method to Construction of Multi¬service Utility Tunnel Adjacent to Important Structures

    By Akihiro Higashide, Roy H. Patten

    The DOT Tunneling method combines two conventional earth pressure balance shield machines in an overlapping cylindrical arrangement. The method allows two tunnels to be driven simultaneously with mini

    Jan 1, 1995

  • SME
    Times Square Connection: ?Supporting The Cross Roads Of The World?

    By Victor F. Paterno

    In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu

  • SME
    Automating Modeling Of Operational Data To Identify The Most Important Factors

    By S. Agarwal

    The mining industry collects a significant amount of operational data. However, gleaning useful information from the terabytes of data is difficult, and not just because of the sheer volume of the da

    Jan 1, 2011

  • SME
    Using Rock Geomechanical Characteristics to Estimate Bond Work Index for Mining Production Blocks - Mining, Metallurgy & Exploration (2021)

    By Omid Asghari, Amin Mousavi, Arshad Ranjbar

    Geometallurgical modeling of the production benches is an attempt to estimate the geometallurgical variables of the different ore domains, which leads to a better understanding of the ore and its prop

    Oct 28, 2021

  • SME
    Decline Development At The Lakeshore Property

    By Robert S. Hendricks

    LOCATION AND HISTORY The Lakeshore Copper property is located on the Papago Indian Reservation approximately 30 miles South of Casa Grande, Arizona. This major porphyry type deposit was discovered

    Jan 1, 1997

  • SME
    Mine and Mill Labor Productivity Study Shows Wide Range of Values

    By Leons Kovisars

    Introduction Labor is the major cost element for most mining operations. Labor costs are continually increasing, both in nominal and constant terms. This is true in developed as well as less develope

    Jan 11, 1983

  • SME
    Solid Phase Characterization For Metal Mine Waste Drainage Quality Prediction

    By K. Lapakko

    Several static tests estimate the capacity of mine waste to produce and neutralize acid and are used as tools for predicting metal-mine waste drainage quality. Various methods and their accuracies ar

    Jan 1, 2003

  • SME
    Organic Substrate Selection Criteria For Sulfate Reduction Treatment Of Mining Influenced Waters ? Introduction

    By P. A. Hagerty

    Biological treatment of metals-impacted water using sulfate reduction is a viable means of treatment that has been applied in pilot and full scale at numerous projects. One of the fundamental challen

    Jan 1, 2011

  • SME
    Collaborative Strategic Research Initiatives: Their Benefits and Best Practice Approaches for Establishing the Same

    By Daniel Brutto

    "Environmental considerations are a key driver within marine mining consenting processes across different national and international legislative regimes and are critical in shaping the global public p

    Sep 1, 2014

  • SME
    Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, Arizona

    By William D. Leech, Ronald E. Romley, Gary N. Sheppard

    The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The

    Jan 1, 1991

  • SME
    Creation Of An Underground Mine Development Sequencing Optimizer

    By M. J. Blattman

    Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret

    Jan 1, 2003

  • SME
    GIS and Bauxite Mining in Jamaica

    By Jim Baumann

    Deposited millions of years ago in irregular paleokarstic channels, Jamaica’s extensive bauxite deposits provide good quality ore for alumina production and subsequent aluminum smelting. Bauxite minin

    Jan 1, 2002

  • SME
    TBM Excavability: Prediction and Machine–Rock Interaction

    By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada

    TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj

    Jan 1, 2007

  • SME
    Improving Leaching Recovery Of Copper From Low-Grade Chalcopyrite Ores

    By J. M. Ekenes

    New approaches that increase hydrometallurgical recovery from refractory minerals in below-mill-cut-off-grade sulfide copper ore can add significant value, improve profitability and increase ore reser

    Jan 1, 2012

  • SME
    Rewards and Frustrations of Female Mining Engineers

    By Christy Z. Lueders

    Introduction More and more women engineers are joining the traditionally male mining industry. Are they successful? Do they encounter special problems? How do men in mining respond? How can the minin

    Jan 10, 1981

  • SME
    Mining Company of the Future;Anglo American CEO Joins Group to Open Discussion

    By William Gleason

    The mining industry is at a crossroads. Currently, there is an estimated $25 billion worth of projects around the world that have been stopped as the consequence of a dispute or disagreement with thei

  • SME
    Evaluation Of Cyanide Producing Microorganisms To Recover Gold From Low-Grade Ore ? Introduction

    By D. Shin

    The gold leaching using cyanide from ore or waste has been almost universally in use [1]. Recently, biological gold bioleaching using cyanide producing bacteria, e.g. Chromobacterium violaceum, Pseudo

    Jan 1, 2012

  • SME
    Cresson Mine Completes Two-Year Expansion

    By William R. Yernberg

    The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini

    Jan 1, 2002

  • SME
    Results given of studies concerning methane extraction from coalbeds

    By M. A. Trevits, G. L. Finfinger

    Various methods have been developed through US Bureau of Mines research to remove gas in advance of, during, and subsequent to mining. These include drilling horizontal or cross-measure boreholes from

    Jan 8, 1986

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007