Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Microscopic and Experimental Analysis of the Tribological System of TBM Tools
By A. Röttger, W. Theisen, J. Küpferle, M. Alber
"Wear of TBM tools significantly affects tunneling advance rates. Wear-prediction models are based (amongst others) on the abrasivity of the present geology, which is determined via laboratory tests.
Jan 1, 2016
-
Ventilation and atmosphere control inside a 3-bar compressed air TBM heading
By B. R. Zernich
Advances in tunneling technology, such as Earth Pressure Balance and Slurry Shield methods, have allowed the tunneling industry to construct tunnels in increasingly difficult ground conditions. In rec
Jan 1, 2009
-
Final Tunnel Liner At The Mill Creek 3 Project
By M. Schafer
The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a
Jan 1, 2008
-
World’s largest live tunnel connection at TARP McCook Tunnel
By Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Carmen Scalise, Miquel Sanchez
"The McCook Main Tunnel system consists of a 10-m (33-ft) finished diameter, 490-m (1,600-ft) long, hard rock tunnel constructed from a 27.5-m (90- ft) diameter and 92-m (300-ft) deep main gate and tu
Sep 1, 2016
-
Tunnel Safety—Command and Fire Code Official Perspective
By Gary English
"Tunnel safety is evolving as science, engineering and technology make advances. Applicable safety codes and standards simply do not cover all the potentials of design, construction and operation. Thi
Jan 1, 2016
-
Tunnel Deformation Mode and Loading Magnitude during Large Earthquake
By Nobuharu Isago, Atsushi Kusaka, Kosuke Kawata
"Rock tunnels suffered severe damage from recent large earthquakes in Japan, despite the empirical knowledge that tunnels tolerate earthquakes better than surface structures. Seismic design for rock t
Jan 1, 2016
-
Behavior Studies For A Highway Tunnel
By D. L. Misterek, E. J. Slebir, G. W. Ring, M. A. Laird
INTRODUCTION In 1973, the Federal Highway Administration (FHWA) initiated a 10-year program of research on tunneling technology for future highways as a part of a larger Department of Transportatio
Jan 1, 1976
-
Gateway Program—Cut and Cover Tunnels in Manhattan - RETC2023
By Drew Bazil, David Smith, Matteo Ferrucci, David Pittman
The Gateway program will provide additional rail capacity between New Jersey and Manhattan. This paper describes how a 70-foot-deep section of cut and cover tunnel was designed to directly support fut
Jun 13, 2023
-
Inspection Equipment Study on Subway Tunnel Defects
By Yadong Xue, Fei Wang, Hongwei Huang, Yan Sun
"Increasing attention to subway tunnel maintenance is being paid with the high speed development of urban rail transit system in China. A novel moving tunnel inspection equipment based on machine visi
Jan 1, 2016
-
Tunnel Destruction:State Of The Art
By Charles E. Joachim
Current Army tunnel destruction criteria (1) are based on limited nuclear-explosive (NE) and high-explosive (HE) test data. The PILE DRIVER (2) and HARDHAT (3) events investigated tunnel and support s
Jan 1, 1979
-
The Planning, Design and Construction of the Tuas Cable Tunnel and Future Power Transmission Cable Tunnels in Singapore
By G. D. Mainwaring, Weng L. W, Lam Y. K.
The first power transmission cable tunnel in Singapore was the 2.6km long undersea tunnel between Pulau Seraya and mainland Singapore, constructed in the1980s. Ten years later, similar concepts were u
Jan 1, 2001
-
3-Dimensional Analysis of EPB TBM Operation in Close Proximity to Pile Foundations
By Mahmoud Sepehrmanesh, Verya Nasri, Maziar Partovi
"This paper presents an assessment of the impact of tunneling and its associated risks on pile foundations located in the influence zone of tunneling operation. Tunneling in proximity of pile foundati
Jan 1, 2016
-
"Key Technologies of Large RectangularPipe Jacking Machine"
By Lianhui Jia, Yali Han
"The key technologies of a large rectangular pipe jacking machine with dimensions of 10.12m × 7.27m (width x height) include selection of rectangular cross-section cutting modes, analysis on the stren
Jan 1, 2016
-
San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case History
By Michael Jatczak
The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin
-
Boggo Road Busway Project, Brisbane, Australia
By Ted Nye
This paper describes a number of aspects of the design and construction of a driven tunnel which forms part of the Boggo Road Busway project. The driven tunnel is 430m long with an excavated width of
-
Chicago Sewer System Tunnels And Shafts - Addison To Wilmette
By E. O. Mixon, Jack D. Kennedy
INTRODUCTION This contract is the most northerly portion of the Metropolitan Sanitary District of Greater Chicago's Tunnel and Reservoir Plan. (TARP) The project begins at Addison Street in Ch
Jan 1, 1979
-
Urban Tunnelling Experiences on the UK’s Channel Tunnel Rail Link
By Keith Bowers, Frank Mimnagh, Eddie Woods
The CTRL London Tunnels The Channel Tunnel Rail Link (CTRL) London Tunnels comprise 36km of internal diameter bores that were driven by Earth Pressure Balance (EPB) Tunnel Boring Machines (TBMs).
Jan 1, 2005
-
Bergen And Beyond: Western Norway's Plans For A Tunnel And Bridge Network
By Josef Martinsen
This paper describes two-lane dual motorway tunnels under construction in Bergen. The tunnels are part of a by-pass motorway system throuth the most congested area of the city of Bergen. The tunnels a
Jan 1, 1987
-
Remediation of the Falls of Ground in a Water Conveyance Tunnel - NAT2024
By Amir Karami, Scott Munro
This paper focuses on remediation of a 3.6 km long water conveyance tunnel that suffered two large falls of ground (FoGs), one of which subsequently progressed to the ground surface, resulting in full
Jun 23, 2024
-
Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DC
By Charles E. Mergentime, J. Marshall Dean
Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,
Jan 1, 1985