Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021
By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan
The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th
Jun 13, 2021
-
How Correct are Geostatistical Models in Predicting Soil Transitions? - NAT2022
By Hongjie Yu, Mike Mooney
Transitions between geological/geotechnical soil units have a critical impact on the operation and performance of a tunnel boring machine (TBM). Geostatistics-based probabilistic modeling is used to q
Dec 1, 2022
-
Overcoming Sustainability Challenges for Design and Construction of Urban and Long-Distance Tunnels - NAT2024
By Bernd Hagenah, Eric C. Wang
New tunnels of significant alignment lengths such as mountain tunnels, base tunnels, as well as beneath urban centers pose unique environmental challenges. This paper highlights key environmental cons
Jun 23, 2024
-
Deep Rock Wastewater Tunnel in Delco - NAT2022
By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski
The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/
Dec 1, 2022
-
Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023
By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty
The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste
Jun 13, 2023
-
Evaluating Options in Design of the Akron Northside Interceptor Tunnel (NSIT) Tunnel Diversion and Flow Control Structure - NAT2024
By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel (NSIT) project to control and reduce combined sewer overflows. One component of the project a large diameter tunnel diversion / flow c
Jun 23, 2024
-
Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023
By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch
The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align
Jun 13, 2023
-
Sumner Tunnel Rehabilitation - NAT2024
By Joe Rigney, Conrad Stacey, David Nowak, Chris Blanchard, Michael Beyer, John Czach
Originally constructed in the 1930s, the 1-mile-long Sumner Tunnel is 31 feet in diameter and carries traffic deep below Boston Harbor, connecting Boston and East Boston. This project includes both de
Jun 23, 2024
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022
By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024
By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield
The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the
Jun 23, 2024
-
Orientation Of Tunnels Under Jointed Rocks By Using Key Block Theory
By M. Z. Rashad
The intersections of numerous joint sets at the surface of tunneling region of Abu-Tartour-Project in Egypt create blocks with irregular shape and size in the rock mass. Most of these blocks are not a
Jan 1, 1991
-
Integration Of Operations And Underground Construction: Sound Transit University Link
By John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
-
High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case History
By Joseph J. Diehl, Brian B. Khalighi
This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI
Jan 1, 1997
-
Recent Trends in Procurement of Tunnel Projects in the United Kingdom
By Richard L. Patterson, Alan P. Finch
Twenty years ago, when tunnel projects in the UK were generally procured by the public sector, many were completed late and over budget. Now a significant proportion of new infrastructure is devel
Jan 1, 2003
-
CP Rail Tunnels In The Rogers Pass, British Columbia, Canada
By Ronald S. Tanaka
In the planning stages for a dozen years, the 9.11 mile long Mount Macdonald Tunnel is the focal point of the $600 million dollar Rogers Pass Project. The paper will discuss the construction of the tu
Jan 1, 1987
-
Tunnel Boring Machine Concept for Converging Ground
By Rock M. Poulin, Bruce G. Moulton, Daniel E. Nowak, David T. Cass
The Yacambu Irrigation Tunnel Project of 34 km, 5 meter diameter circular and horseshoe section, has been under construction since the early 1970's. Notable among the excavation challenges is hig
Jan 1, 1995
-
The Development And Use Of Precast Concrete Tunnel Linings
By Terence G. McCusker
Precast concrete segmental tunnel linings have been used since at least 1903. More serious attention was devoted to them in England during the World War II steel shortage and they have become increasi
Jan 1, 1989
-
Determination Of The Direction Of Tunnels In Jointed Rocks Using Key Block Theory
By M. Z. Rashad, H. A. El-Sageer
The intersections of numerous joint sets at the surface of tunnels of the Abu-Tartour project in Egypt create blocks of irregular shape and size in the rock mass. Although most of these blocks are una
Jan 1, 1993
-
Groundwater Cut-Off for Jacked Tunnel with Ground Freezing
By Philip M. Rice, Paul Schmall, Peter W. Deming, Hugh S. Lacy
A groundwater cut-off is needed to provide a stable face of tunnels to be constructed by jacking precast rectangular tunnel segments beneath commuter rail tracks for the new I-90 extension in Boston,
Jan 1, 1999
-
Bergen Tunnels Rehabilitation–A Success After All
By St. Mergentime, K. Zeidler, V. Gall
2001, the New Jersey Transit Authority commissioned the JV Merco-Obayashi with the rehabilitation contract of the approximately 130-year-old, 4,200 ft long, partially brick- lined Bergen North Tunnel.
Jan 1, 2003