Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Buckling of Sheave Wheels

    Sheaves are a critical safety component in a winding system and are expected to survive such extreme loading events as rope break. Sheave designs have often been developed and evolved empirically, con

    Jan 1, 2005

  • AUSIMM
    Budget Estimation and Contingency Allocation of Block Cave Construction Using Least-squares Monte Carlo Real Options

    By H M. Ahmed, W S. Dunbar

    Construction of cave mining systems requires significant capital expenditure and long-term commitment of human, equipment and material resources before production commences. Risks and uncertainties of

    May 9, 2016

  • AUSIMM
    Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru

    By R Baumgartner

    The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic

    Sep 5, 2011

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013

  • AUSIMM
    Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation Data

    By F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz

    A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical

    Sep 29, 2013

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Building AsiaÆs Latest Hard Rock Mine

    By T J. V Duffy, L H. D Siahaan, P G. Albert

    G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard

    Nov 20, 2012

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Building Business Cases for Maintenance Improvement Projects

    By F Jullian, L Jofre

    Many maintenance managers find it difficult to justify investments in maintenance improvement initiatives. In part, this is due to a tendency by mine managers to regard maintenance purely as a cost ce

    Jan 1, 2006

  • AUSIMM
    Building Partnerships with Indigenous People to Improve their Economic Circumstances to Achieve Social Cohesion and Social Licence to Operate û A Case Study of the West Pilbara, Australia

    The relationships between Aboriginal Traditional Owners and mining companies have often been mired in dispute, particularly since the High Court Mabo decision and the Native Title Act of 1993. In the

    Jan 1, 2009

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    Building the Mining Corporate Image

    `WELL HE WOULD, WOULDN'T HE?' Public Relations people have something in common with advertising people and politicians: there exists a perception that their whole Raison d'Etre is to

    Jan 1, 1994

  • AUSIMM
    Building the Unified Comminution Model

    Building the Unified Comminution Model The Unified Comminution Model (UCM) was formulated with the vision of bringing all comminution models onto a common base. The structure of the model relies on k

    Sep 13, 2010

  • AUSIMM
    Bulk carrier vessel tracking automation – the Dalrymple Bay use case

    By W Russell, P Wighton, J Franke

    Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled

    Nov 8, 2021

  • AUSIMM
    Bulk Density as a Method to Evaluate Reducibility of Hard Hematite Ore in the Direct Reduction Process

    By R J. deMelo, A, V Suckal, R A. Vilela

    Massive hematite ore (MHO) is a special high-grade iron ore used as lump ore in the process of obtaining direct reduced iron (DRI). The influence of porosity on the reducibility was investigated using

    Jan 1, 2002

  • AUSIMM
    Bulk Density of Coal

    By Yu A. B

    An experimental study of the packing of a coal heap has been carried out. The bulk density of a coal heap is considered as a function of a number of variables, viz flow rate, conveyor belt speed, t

    Jan 1, 1991

  • AUSIMM
    Bulk Density of Stratified Iron Ores and Its Relationship to Grade and Porosity

    By Wylie A. W, Mathew PJ

    Bulk density and grade were determined on a variety of ore samples from the Mount Tom Price iron ore mine and the interrelationship between these properties and porosity deduced.Variable porosity is r

    Jan 1, 1978

  • AUSIMM
    Bulk Emulsion Explosives at the Sydney LPG Cavern - A First in Australian Tunnelling

    The Elgas Underground Storage Facility at Port Botany, Sydney, is the first purpose-built cavern of its kind in Australia and provides large capacity, safe and environmentally benign storage of Liquef

    Jan 1, 1999