Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New Fans

    Full aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials

    Performance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance

    Jan 1, 1967

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • AUSIMM
    Development of the Use of Roaster (SO2) Gas in the Treatment Plant at Gold Mines of Kalgoorlie Limited

    By Penrose E. K

    With the exception of occasional periods, when up to 80% of oxidized ore was treated, the G.M.K. plant treated all sulphide ore until October, 1939. The treatment was, briefly, as follows:The ore was

    Jan 1, 1942

  • AUSIMM
    Development of the West Cliff Extended Project

    In the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti

    Jan 1, 1983

  • AUSIMM
    Development of the WorldÆs Largest Flotation Machine

    By S P, F Villanueva, R Palomo, D Meadows

    During 2002, design and development of the worldÆs largest flotation cell was completed. The cell is the mineral industryÆs first 257 m3 flotation cell, and represents a major development in the desig

    Jan 1, 2005

  • AUSIMM
    Development of the Zafranal Geometallurgical Model

    By G Harbort

    The use of geological data for optimisation of operating plants has become a significant part of the modern process mindset. The underlying principle is to convert spatial geological data into metallu

    Sep 5, 2011

  • AUSIMM
    Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil Dump

    By Walton S, Wheeler D. J, Sargent D. M, Ting L. Y

    Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and

    Jan 1, 1992

  • AUSIMM
    Development of Underground Gold Processing Plants

    Development of Underground Gold Processing Plants Underground gold processing plants have potential advantages over traditional surface installations related to a smaller environmental footprint, red

    Sep 13, 2010

  • AUSIMM
    Development of Void Diffusion Models to Predict Subsidence due to Underground Coal Mining

    By Chugh Y. P

    A generalized void diffusion model for subsidence prediction has been developed based on theoretical concepts and physical principles. The general form of the model is a three-dimensional different

    Jan 1, 1992

  • AUSIMM
    Development Of, And Experience With, Underground Electric Loaders

    By Sillet R, Corin P. J, Wilson G

    Zinc Corporation of Broken Hi11 had some long hole stopes coming into use which could not be mined using diesel loaders, because of ventilation restrictions. In preference to use of pneumatic load

    Jan 1, 1977

  • AUSIMM
    Development Options for the Eyre Peninsula Magnetite – An Owner’s Perspective

    By J White

    The Eyre Peninsula (EP) has been known for its iron ore for more than a century. Edward John Eyre noted the ironstone outcrop at what is now Iron Knob in the 19th century. Sir Douglas Mawson visited a

    Jul 11, 2011

  • AUSIMM
    Development Philosophy

    By Bruington T, Perkins J, Hutton R

    Natural resource developments are among the largest and most challenging projects taking place in the world. They involve capital intensive investment with long lead times and the management of geo

    Jan 1, 1997

  • AUSIMM
    Development Practice and Ground Support Installation at Northparkes E26 Mine

    The Northparkes E26 Mine is AustraliaÆs first block cave mine. This paper presents an outline of the design and construction philosophies that drove the project development and details the excavation,

    Jan 1, 1999

  • AUSIMM
    Development Rates Using Conventional Continuous Miner Technology in Deep Underground Mines in Australia

    By Misra A

    The development of roadways in underground mines in Autralia is by conventional continuous miner technology. The rate of development achieved using this technology is improved by modifications to this

    Jan 1, 1991