Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Optimisation of Excavator Performance When Mining Complex Polymetallic Ores

    By U Dzharlkaganov, B Bekmurzayevand M

    The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of

    Jan 1, 2003

  • AUSIMM
    Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara

    By K McCaffery, R P. Halomoan

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • AUSIMM
    Optimisation of Flotation Circuits With Large Flotation Cells

    The recent trend of installing flotation cells with volumes as large as 200 m3 in concentrators is driven mainly by economic considerations such as lower capital, operating and maintenance costs. Desp

    Jan 1, 2005

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of Cyanicides

    By B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon

    Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The

    Sep 26, 2013

  • AUSIMM
    Optimisation of Ore Selection in Mining: Method and Case Studies

    By Rolley P

    In the course of reviewing grade control practices at the Marvel Loch gold mine in Western Australia in 1992, FSSI Consultants developed and implemented a novel approach to ore selection using a met

    Jan 1, 1997

  • AUSIMM
    Optimisation of Overburden Blasting Mount Thorley Colliery

    By Mckenzie CK, Scott A

    The injection of coal as an auxiliary fuel in ironmaking blast furnaces has been introduced on many furnaces worldwide. This paper examines the present practice of coal injection and discusses fut

    Jan 1, 1987

  • AUSIMM
    Optimisation of Reinforcement Design of Coal Mine Roadways

    By Fabjanczyk MW, Guy RJ, Tarrant GC

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi

    Jan 1, 1992

  • AUSIMM
    Optimisation of Rock Disintegration Based on Acoustic Background of Drilling Machine

    By J Fut=

    The rotary drilling of rocks is widespread technology in mining and in tunnelling. The paper describes the results of research by aim to find relationships between optimal drilling and sound signal of

    Jan 1, 2003

  • AUSIMM
    Optimisation of Rotary Drilling

    Optimising drill performance has always been a primary goal of drilling and blasting managers. Improving drilling rates and utilisation will ultimately drive the cost per foot or metre downward. Ad

    Jan 1, 1995

  • AUSIMM
    Optimisation of Sampling Procedures at the Fimiston Open Pit, Kalgoorlie

    By Chapman G. J

    Mining operations require detailed and precise methods and procedures for the optimum selection of ore from waste. A fundamental procedure applied to achieve this selection is accurate sampling. The k

    Jan 1, 1993

  • AUSIMM
    Optimisation of Slope Angles at Rosario Mine, Collahuasi

    By A R. Bonani, M P. Pe±a

    The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p

    Jan 1, 2007

  • AUSIMM
    Optimisation of Spray Collers for Cooling Deep Coal Mines

    By Hagen G, Uhlig H

    In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa

    Jan 1, 1988

  • AUSIMM
    Optimisation of Steam and Energy Usage in a Nickel Refinery

    The nickel refinery at Yabulu consumes an average of 118,000 kg/h of low pressure steam in stripping operations to-recover ammonia and carbon dioxide from product liquor and ore tailings streams. The

    Jan 1, 1985

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018