Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Pillar Recovery Methods At The Zinc Corporation, Limited And New Broken Hill Consolidated Limited

    Various aspects of the history of mining at The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Limited (NHHC) are examined. There are some discussions about the various methods us

    Jan 1, 1983

  • AUSIMM
    Pilot Plant Heavy Medium Investigation for Mount Isa Lead/Zinc Ores

    By Di Pasquale S, Osler GD

    Mount Isa Mines Limited recently commiss ioned an 800 tph Heavy Medium Preconcentration Plant for lead/zinc/silver ores. The decision to build this plant was made in late 1979 based largely on inve

    Jan 1, 1978

  • AUSIMM
    Pilot Plant Objectives and Considerations for Evaluating the Waste Disposal of High Slimes Heavy Mineral Sand Deposits

    By N Ross, N Goldup

    In recent years the heavy mineral mining industry has started to look more closely at the feasibility of mining moderate to high slimes deposits. During the initial stages of orebody evaluation the pr

    Jan 1, 2001

  • AUSIMM
    Pilot Plant Scale Leaching of Zinc From Angouran Plant Flotation Thickener Overflow Using Sulfuric Acid

    By S Moradi

    The thickener overflow of zinc concentrate, obtained from flotation process in the Angouran plant located in Iran, contains a large quantity of slimes which were transferred to the tailing ponds. Thes

    Jan 1, 2004

  • AUSIMM
    Pilot Plant Studies in the Recovery of Copper from Copper-Lead Dross

    By Lewis IE

    Copper-lead dross is a by-product of the refining of lead bullion produced by the Imper- ial Smelting Process. This dross contains some 27 percent copper, 50 percent lead, four percent zinc and one

    Jan 1, 1975

  • AUSIMM
    Pilot Plant Study to Treat Typical Gold Mine Minewater Using the Savmin Process

    By U E. Sibilski

    A pilot plant evaluation of the Savmin process, for the purification of mine water was commissioned by Anglogold and conducted at the Stilfontein Gold Mine, Margaret Shaft at Stilfontein in the North

    Jan 1, 2003

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • AUSIMM
    Pilot Plant Treatment of Waste Liquors at Risdon

    In 1975, following a programme of solution characterization and small scale laboratory test work, a pilot plant was constructed to treat waste liquors from the Risdon works. The plant was designed

    Jan 1, 1977

  • AUSIMM
    Pilot Plant Work as an Aid to Process Flow Line Development and Process Choices

    Pilot plant work has played a major role in the process development and design phase of the Iscor Heavy Minerals project. The pilot plant campaigns have been aimed at three process areas, namely prima

    Jan 1, 2001

  • AUSIMM
    Pilot Reactor for Flash Smelting

    By Smith T. N, Wild M. B, Elliot B. J

    The process of flash smelting of nickel sulphide ores, as practised at the Kalgoorlie Nickel Smelter, is described. The critical variables in the operation of this process are identified. The design

    Jan 1, 1991

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • AUSIMM
    Pilot Scale Processing of Greenbushes Tantalite

    In an earlier paper(l) details of a laboratory method of extracting and separating tantalum and columbium oxides from tantalite have been given. In view of the fact that Australia may have need to be

    Jan 1, 1946

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • AUSIMM
    Pilot Scale Testing of Australian Coals for Nox Emmisions

    The pilot scale testing of Australian coals for their NO, emissions was carried out at the ACTC to investigate the influence of coal properties, furnace conditions and different NO,, control strate

    Jan 1, 1991

  • AUSIMM
    Pilot Studies of the Ravensthorpe Nickel ProjectÆs Pressure Acid Leach Slurry Heater

    By M Miller

    Operators of nickel laterite pressure acid leach and gold pressure oxidation technology frequently employ a series of steam condensing heaters to preheat the leach feed slurry. The heaters are an econ

    Jan 1, 2005

  • AUSIMM
    Pilot Study on Blast Movement Monitoring at Geita Gold Mine

    By F Mwijage

    "The benefits of measuring blast movement to reduce ore loss and dilution have been recognised by many people for many years and various methods have been used with limited success. Geita Gold Mine is

    Mar 26, 2012

  • AUSIMM
    Pilot Tests for Heavy Metals Removal in Mine Water

    By M Vendrup, T C. Christensen, C Dube

    The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u

    Sep 7, 2015

  • AUSIMM
    Pilot Tunnel and Blast Enlargement for Vibration Control

    By Lunardi P, Pelizza S

    The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section

    Jan 1, 1987

  • AUSIMM
    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore

    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore The results of pilot-plant tested ammoniacal-cyanidation of gold recovery from copper gold-bearing ore are

    Sep 13, 2010