Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improvement Of The Metal Recovery From Dross By Centrifuging Of Hot Dross
By Bernd Kos
The management of waste materials in the aluminum industry is as important as in other basic industries. Due to the high value of the-by products of the melting process and their toxic properties we t
Jan 1, 1995
-
Improvement On Magnetic Properties Of Nanocomposite NdFeB Melt Spun Ribbons By Elemental Substitutions
By W. C. Chang
Phases and magnetic evolutions of melt spun Nd9.5(Fe1-xCox)85.5B5 (x=0, 0.05, 0.1 and 0.15), (Nd1-yLay)9.5Fe85.5B5 (y=0, 0.0.5, 0.1; and 0.15) and (Nd0.95La0.05)9.5(Fe1-zCrz)81.5B9 (z=0, 0.033, 0.06
Jan 1, 1997
-
Improvement On Performance Of Mg-C Refractories As Lining Of Vanadium-Extraction Converters
By Min Chen, Lei Xu, Weijun Huang, Shuai Zhang
For the purpose of extending the service life of MgO-C bricks used as linings of vanadium-extraction converters, the effect of Fe addition on properties of MgO-C bricks was investigated. The results s
Jan 1, 2015
-
Improvement on the Tribological Characteristics of Particulate Copper Silicon Carbide Composites
By Atinuke Oladoye, David Esezobor
"Particulate Copper Silicon carbide (Cu-SiCp) composites find application as wear and heat resistant materials in electrical sliding contacts such as in homopolar machines, railway overhead current co
Jan 1, 2011
-
Improvement to the Acid Pressure Leaching of Nickel Laterite Ores
By Walter Curlook
An improved process of hydrometallurgical treatment of laterite ores of the limonitic type for the recovery of nickel and cobalt using sulphuric acid has been developed and patented [I]. The major imp
Jan 1, 2004
-
Improvements at the Electrolytic Zinc Plant of Big River Zinc Corporation, Sauget, Illinois, U.S.A.
By L. L. Ludwig, S. E. James, B. L. Motycka
Significant modifications to the electrolytic zinc plant operated by Big River Zinc Corporation were made at the end of the 1990's resulting in increased capacity and improved efficiencies. A new cell
Jan 1, 2000
-
Improvements Carried out at Huelva Smelter in the 2007 General Shutdown: A Review
By Carlos Ortiz
The Huelva Flash Smelting Furnace was commissioned in September 1975. The Smelter and the Acid Plant were expanded in 1995 to their present capacity of 300,000 tpa new copper equivalent and one millio
Jan 1, 2008
-
Improvements in ceramics for boiler protection in WTE applications
By Stephan Mulch, Christian His, Patrick M. Stephan, Thibault Champion
"When fuel costs increase dramatically, waste to energy (WTE) conversion technologies become a good alternative to produce energy. The potential energy available in domestic wastes, in developed count
Jan 1, 2008
-
Improvements in Scrap Recycling and Dross Processing Using Oxygen
By Russell James Hewertson
Since 1989 Air Products and Chemicals, Inc. has converted over 40 air fuel fired furnaces to oxy-fuel and air-oxy-fuel. Advances in burner design, flow control technology and operating experience have
Jan 1, 2000
-
Improvements In Smelting And Refining Of Lead At Brunswick Smelting
By M. D. Street
Lead and zinc production commenced in 1966 at Brunswick Smelting using the Imperial Smelting Process. In 1972 the blast furnace was modified to produce lead bullion only which was refined to corroding
Jan 1, 1983
-
Improvements in the Design of Peirce Smith Converters for its Operation in Potrerillos Smelter
By Orlando C. Rojas
The Potrerillos Smelter commissioned a new El Teniente converter in 1985. As a result of the use of this technology, the Peirce-Smith converters have been processing only high grade matte or white met
Jan 1, 1993
-
Improvements in the Leaching Circuito of Immsa's Zinc Plant in San Luis Potosi, Mexico
By S. Castro, P. Alfaro, C. Moctezuma
IMMSA operates a conventional roasting-leaching-purification-electrolysis plant for the production of zinc from concentrates in San Luis Potosi, Mexico. The leaching circuit was designed to take into
Jan 1, 2000
-
Improvements In The Operating Practices At The Atlantic Copper Refinery
By P. Barrios
The copper refinery of Atlantic Copper was modernised and converted to the Isa permanent cathode system in 1995. The technology installed has proved to be an excellent platform for the development of
Jan 1, 1999
-
Improvements In The Tankhouse Of The Tamano Smelter
By M. Hashiuchi
In 1972, the tankhouse of the Tamano Smelter adopted a high current density electrolysis operation applying the PRC (Periodic Reverse Current) method. In 1994, the phase four production expansion proj
Jan 1, 1999
-
Improvements Of The Converter's Operation At Tamano Smelter
By T. Maruyama
Tamano Smelter of Hibi Kyodo Smelting Co., Ltd. has been operating with one Flash Furnace (FSFE) and three Peirce-Smith Converters since its start-up in 1972. Anode production capacity has increased f
Jan 1, 1998
-
Improvements Of Zinc Roaster Waste Heat Boiler
By Juha Järvi
Outokumpu Zinc Oy has two separate roasting lines with fluidized bed furnaces and waste heat boilers for calcine collection and heat recovery. During the last 30 years, zinc production in Kokkola plan
Jan 1, 2002
-
Improvements on Converter Operating Practice at Mufulira Smelter
By John Sakala, Jeyapandian Sasikumar, Sydney Kwalela
The Isasmelt Furnace was commissioned in September 2006 with a concentrates treatment capacity of 850,000 tonnes per annum. However, the converter section became a bottleneck to the high throughput. O
Jan 1, 2012
-
Improvements on the Process of Gold-Antimony Concentrate Smelting in China
By Wei-feng Liu
On the basis of the brief introduction of the gold-antimony concentrate smelting process in China, some problems in the original process were analyzed and the corresponding improvements were introduce
Jan 1, 2008
-
Improvements To BHP Hartley Platinum's Smelting Furnace
BHP Hartley Platinum operates an electric smelting furnace to treat Cu-Ni-PGM concentrate at its plant in Selous, Zimbabwe. The furnace, originally built by others, has experienced problems including
Jan 1, 1999
-
Improvements to Stillwater Mining Company's Smelting! Furnace Yielding Increased Capacity and Productivity
By N. Voennann
Stillwater Mining Company operates an electric furnace at its smelter in Columbus, Montana to treat a Ni-Cu-platinum group metal concentrate along with secondary PGM bearing materials. Hatch Associate
Jan 1, 1998