Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Risk Quantified Ore Control in Open Pit Gold MiningBy Coskun B
The classification of selective mining units (SMU's) and the assignment of grades to those classified SMU's are very important in open pit mining, especially for precious metal mining. Dur
Jan 1, 1998
-
The Design And Use Of A Laboratory Pellet Plant AnalogueBy Roderick W. F
The equipment and procedures used for green pellet production on a laboratory scale are given, together with a description of the straight grate pellet strand analogue which has been developed to
Jan 1, 1974
-
Optimising the Yield and Distribution of Effective Explosion Energy in Fans and Rings of BlastholesThe cost-effectiveness of blasts involving radiating blastholes is cur- rently restricted in the following ways. (a) Significant percentages of potential explosion energy are not being liberated; the
Jan 1, 1988
-
Grangcold Pelletizing Of Hematite Iron OresBy Thulin D
In 1971 the first Grangcold Pelletizing Plant came into operation at Grangesberg, Sweden where from a rich magnetite low- phosphoric concentrate and a cement binder (Portland cement clinker and gra
Jan 1, 1974
-
Integrated Dredging AutomationMost mining dredges are adapted from canal/harbour dredges. Their automation and control systems are generally not designed for integrated mining operations. Consequently they have a number of limitat
Jan 1, 2001
-
The Selection of Granular Activated Carbon for use in a Carbon-in-Pulp OperationBy Tumilty JA, Douglas WD
With a view to characterising activated carbons with respect to their ability to adsorb gold from cyanide solutions, an attempt was made to establish correlations between the equilibrium capacity co
Jan 1, 1982
-
The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and PlanningBy E Hogan, M Goodz, R Wright
The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu
Jan 1, 1992
-
Cost Effective Blasting - A Case StudyBy Gigmai W
Ok Tedi Mine is a high production open pit porphyry copper mine located high in the Star mountains of Papua New Guinea. The mine produces an average of 160 000 tonnes of ore and waste daily at a 1:1 s
Jan 1, 1992
-
Sampling in Exploration: Theory and PracticeMetal grades and contents of ore deposits should be measured in an unbiased manner, and with a degree of precision that reduces to an acceptable level the risk to put into production inviable prospect
Jan 1, 1976
-
Long Term Supply and Demand Aspects of CoalThe energy crisis and the general increase in fuel prices have changed the position of coal in the world. Countries need to review their policies on coal, depending on available reserves and their ac
Jan 1, 1975
-
Plant and Method of Manufacture of Portland Cement at Limestone Island.WITH the exception of the deposits of the Milburn Cement Co near Dunedin, Wilson's Portland Cement Co., on the Mahurangi River (a short distance north of Auckland), and those of the New Zealand P
Jan 1, 1911
-
Multivariate Conditional Simulation of Iron Ore Deposits - Advantages Over Models Made Using Ordinary KrigingMine planning studies of iron ore deposits are often based on resource models generated by ordinary kriging. Ordinary kriging aims for local accuracy to minimise the variance of expected estimation er
Jan 1, 2009
-
Mining Towards 2000By Clifford C. E
1 eat my peas with honey I've done it all my lifeIt makes them taste rather funny But it keeps them on the knife.Innovation is that elusive characteristic which involves the determination of mult
Jan 1, 1993
-
Optimising Open Pit Mine Production Scheduling by Graph TheoryBy J M. Wang, Q M. Hao
A mathematical model is set up to solve the problem of optimal design of the production scheduling on exacting open pit mine. At the same time, the establishment of model in operation condition and it
Jan 1, 2003
-
Economics & Implications Of Mine Environmental Planning/Implementation And The Benambra JVThe expense of mine environmental and planning process approvals is a fundamental and proper part of mine planning and feasibility costs. It is not a cost that should be the subject of challenge nor i
Jan 1, 1992
-
Underground Mine Development - Past and FutureBy Bounsombath P
Underground mine development remains as one of the most important factors in cost effective mining. Various forms of continuous development have been proposed with some of the earliest conceived centu
Jan 1, 1992
-
Making Mines Perform BetterThe procedures for an audit and review process upon which continuous improvement programs may be based are described. The case for regular audits of mining operations to establish performance trends i
Jan 1, 1992
-
Some Metallurgical and Engineering Aspects of the Rum Jungle Water Treatment PlantThe reasons for including treatment of water in Whites and Intermediate open cuts in the overall rehabilitation strategy are given in the introduction. The target quality of the treated water also
Jan 1, 1984
-
The Role of Science and Technology in the Future of the Iron Ore IndustryBy R A. Bearman
Recent demand pressures for iron ore should not distract from the longer term view that intense competition in the industry has demanded technological innovation of a high order. There is a long track
Jan 1, 2005
-
Environmental Concerns in Operating a MineThe passage of a vast array of new State and Federal environmental legislation over the last couple of years has required many mine operators to sharpen their focus on environmental requirements. Esta
Jan 1, 1993