Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Improving Leaching Recovery Of Copper From Low-Grade Chalcopyrite Ores

    By J. M. Ekenes

    New approaches that increase hydrometallurgical recovery from refractory minerals in below-mill-cut-off-grade sulfide copper ore can add significant value, improve profitability and increase ore reser

    Jan 1, 2012

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • SME
    Design And Construction Of Lake Mead Intake No. 3 Shafts And Tunnel

    By Jon Hurt

    INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3

  • SME
    Nonfuel Minerals Projections – Why They Were Wrong

    By Ira Sohn

    This article revisits global projections made in 1981of eight metallic and fertilizer minerals for the year 2000. The objectives here are to quantify the differences between the projected and observe

    Jan 1, 2005

  • SME
    Exploring a shallow seafloor hydrothermal system on the Arctic Mid-Ocean Ridge

    By R. B. Pedersen, A. Filipa, A. Marques

    "Shallow-depth (<200m) high temperature submarine hydrothermal systems are not commonly observed on mid-ocean ridge settings, as most known systems are located within arc - island-arc volcanic setting

    Sep 1, 2014

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • SME
    Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero Emissions

    By Tuncel M. Yegulalp, Anuta Belova

    This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu

    Jan 1, 2005

  • SME
    Reducing Enclosed Cab Drill Operator’s Respirable Dust Exposure At Surface Coal Operation With A Retrofitted Filtration And Pressurization System (83490ae4-de2e-4245-8093-9fec0a123d31)

    By W. A. Heitbrink, J. D. Ashley, R. E. Gresh, J. A. Organiscak, A. B. Cecala

    Many different types of mobile equipment used in surface coal mining utilize enclosed cabs to protect equipment operators. The overburden removal process is extremely dusty and can cause excessive ex

    Jan 1, 2002

  • SME
    Mineralogic Sources Of Metals In Leachates From The Weathering Of Sedex, Massive Sulfide, And Vein Deposit Mining Wastes

    By S. F. Diehl

    Weathered mine waste consists of oxidized primary minerals and chemically unstable secondary phases that can be sources of readily soluble metals and acid rock drainage. Elevated concentrations of met

    Jan 1, 2011

  • SME
    Investigation Of The Selectivity Of Ethoxylcarbonyl Thionocarbametes During The Flotation Of Copper Sulfides

    In this study, the flotation performances of ethoxycarbonyl thionocarbamate (ECTC), dialkyl thionocarbamate (DATC) and xanthate copper sulfide collectors are compared by the structure-reactivity relat

    Jan 1, 2008

  • SME
    Feasibility And Implementation Of Shield Machine Tunnel Passing Through An Operating Airport Runway

    By Hongjie Yang

    The No. 10 metro line of Shanghai city is 36 kilometers in length and will pass through the operating airport runway by using tunnel boring machine with earth pres-sure balance mode. Although there ar

  • SME
    Method To Evaluate Liberation Characteristics Of Feed In A Jigging Plant

    By A. K. Mukherjee

    The roles of pulsating mechanisms such as the amplitude and frequency of the jig cycle are well established in jigging. Also well established are the roles of the size ratio and the volume fraction of

    Jan 1, 2008

  • SME
    Investigation of Climatic Conditions in Underground Coal Mining Mining, Metallurgy and Exploration (63acde09-eb8c-4eb1-b788-340f56a030a7)

    By İbrahim Çınar, Hakan Özşen

    Mine workers in heavy and dangerous work are under several physical risk factors, for example temperature, humidity, noise, vibration, lighting and air velocity. Thermal comfort includes parameters su

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w

  • SME
    A Slope Stability Analysis For The Trojan Pit Expansion At The Wharf Resources Mine, Black Hills, SD

    By V. L. Franzen, Z. J. Hladysz, C. A. Kliche

    The Wharf Resources mine, located in the Bald Mountain Mining District approximately 6.4 km (4miles) west of Lead, South Dakota, has operated a surface gold and silver mine and heap leaching processin

    Jan 1, 2000

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005

  • SME
    Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case Study

    By Y. Q. Zhang, S. S. Peng

    Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st

    Jan 1, 2004

  • SME
    Engineering And Construction Of The Goldstrike Roaster Facility

    By B. Burke, R. Colquhoun, K. Thomas, R. Walton, D. Fentie

    The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • SME
    Are Nanoparticulates Present In Typical Mineral Processing Practices And Can They Be Suppressed?

    By C. R. Copeland

    Airborne dust emission standards are receiving growing attention. This trend is motivated by significant health studies that have shown adverse health effects due to exposure to dust. Currently, the a

    Jan 1, 2007