New York Subway Caverns and Crossovers—A Tale of Trials and TribulationsBy Charles Stone, Madan Naik, Drupad Desai, Karel Rossler
Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1
Jan 1, 2005
-
Using Steel Fibers to Reinforce Final Shotcrete LiningsBy Thomas Schwind, Pamela S. Moran
For short tunnels, a reinforced cast-in-place lining is not economical and shotcreteis a logical substitution. In the past, reinforced shotcrete linings have been constructed with lattice girders and
Jan 1, 2005
-
Method Of Academic Mining Engineering ResearchBy Syd S. Peng
University research in the U.S. consists of three components; faculty, funding, and graduate students or postdoctorals. Individual faculty is the unit area of research that is not limited, although
Jan 1, 2009
-
Stochastic Modeling Of Stormwater And Receiving Stream ConcentrationsBy R. W. Chappell, M. W. Hills, R. L. Olsen
A stochastic approach was developed and applied to the Butte, Montana Hillside abandoned mining site for modeling stormwater runoff and subsequent receiving stream loadings. This approach enabled cap
Jan 1, 2002
-
A Tunnel Boring Machine at the South PoleBy Michael R. Walsh, John H. Wright, Eivind B. Jensen
A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo
Jan 1, 2001
-
Processing researchers continue efforts to streamline US miningBy P. Rosten
US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing
Jan 5, 1985
-
The mineralogy of marine Fe-Mn oxides and consequences for the extraction of metalsBy Thomas Kuhn, Carsten Ruehlemann, Christina Heller, Anna Wegorzewski
The commercial extraction of metals from manganese nodules on an industrial scale requires more than 50% of the investment necessary to realize manganese nodule mining. This is mainly due to the fact
Sep 1, 2014
-
Parbati Hydroelectric Project Stage II, India—Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBMBy Wolfgang Gütter
India is targeting to boost its electrical capacity from 100 GW to 200 GW within the next 10 years. The National Hydroelectric Power Corporation (NHPC) has decided in2001 to take execution of the 800
Jan 1, 2005
-
Methods For Removing Arsenic From Aqueous SystemsBy L. R. Moore
Arsenic is among the list of major contaminants in mining aqueous waste streams. Though the elemental form is toxic, the aqueous oxyanions are more so. The most common forms of arsenic released duri
Jan 1, 2012
-
Nacimiento Lake TapBy Clay Haynes
In 2005, Black & Veatch Corporation began designing a raw water conveyance system for San Luis Obispo County from Lake Nacimiento to the city of San Luis Obispo. The first element of the water transfe
Jan 1, 2008
-
Application Of Ac Induction Motors With Variable Frequency DrivesBy B. J. Sauer
Variable frequency drives (VFD’s), or adjustable frequency controls (AFC’s) as they are more precisely identified, have been available to the mining industry for over 20 years. However, in recent yea
Jan 1, 2002
-
Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, GermanyBy Axel Nitschke, Josef Arnold
Bochum’s Underground Lot 306 was characterised by a confined site and unique tunnelling methods. A highly mechanized construction concept was developed to achieve high progress rates. Bespoke backup s
Jan 1, 2005
-
Evaluation Of Large-Scale Temperature Gradients To Support Assessment Of Convection And Cold-Trap Processes In Heated DriftsBy R. W. Fedors, S. T. Green, G. R. Adams, C. Manepally, L. B. Browning
This paper provides estimates of large-scale temperature gradients that can be used to support modeling of natural convection and cold-trap processes in thermally perturbed drifts. Temperature influen
Jan 1, 2004
-
Monitoring and Evaluation of Ground Movements Above a Deep Longwall Mine in the Eastern United StatesThe prediction and control of ground deformations due to underground mining are important considerations in the permitting, planning, and monitoring of coal mining operations. The prediction of mining
Jan 7, 2020
-
Use Of Geologic Parameters For The Development Of Low-Grade Copper Reserves, Silver Bell Mine, AZBy Q. J. Browne, M. A. Miller
Silver Bell produces about 22,000T of fine copper annually from low-grade chalcocite and oxidized copper ore that is recovered by sulfuric acid leaching and SX-EW processing. The current mineable res
Jan 1, 2002
-
Update On Refuge Alternatives: Research, Recommendations, And Underground Deployment - Preprint 09-013By E. R. Bauer
In response to the mandates in the MINER Act of 2006, NIOSH conducted refuge alternatives research that included characterizing the utility, practicality and survivability of refuge chambers and outby
Jan 1, 2009
-
Analysis of the Hydro-fracture Potential Around Water Tunnels in RockBy Emad Iskander
The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai
Jan 1, 2008
-
Reducing Emissions Through The Use Of A Fuel Borne Combustion CatalystBy R. Curtis
To achieve compliance with 2015 EPA Tier 4 Final regulations, which permit only around 10% of Tier 3 particulate matter (PM) and NOx emissions, a number of technologies are being implemented. Use of a
Feb 27, 2013
-
Ocean mining and deep-sea conservation: Who are the players? What is the game?By S. Kim Juniper
"This presentation aims to serve as a primer on conservation, research and regulatory organizations interested in the environmental impact of deep-sea mining. It will also consider a recent, early-sta
Sep 1, 2014
-
Planning and Fast Track Tunnel Design in Historical Downtown CharlestonBy James McKelvey, Larry Drolet, Jason Swartz
INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved
Jan 1, 2005