Environmental Advantages Of Highway Tunnels
By Howard A. Jongedyk, Jerry Wachtel
Advancements in tunneling technology and underground construction, plus rapidly rising costs of land, and a higher priority being placed on urban esthetics, make tunnels a more attractive option for c
Jan 1, 1974
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel
By Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Tunnels - The Owners' Problems
By T. J. Jr. Corwin
This paper will cover the problems confronting an owner when planning and estimating the cost of a proposed tunnel. Three factors are known: the length, size and the time allocated for the completion
Jan 1, 1974
-
High Speed Excavation By Drill & Blast With Mechanized Mucking System?Mitholz Railway Tunnels, Switzerland
By Stig Eriksson
In Switzerland two major railway systems as shown below in Figure 1 has recently been completed or is under construction: ¦Lötschberg, south of Bern which was commissioned in 2007 ¦Gotthard, south
-
Soft Ground NATM Tunnel Designs
By Mohammad Irshad, Larry H. Heflin
INTRODUCTION The planned 166 kilometer (103 mile) Metro rapid rail transit system in Washington, D.C. is being designed and constructed by the Washington Metropolitan Area Transit Authority. At the
Jan 1, 1987
-
Prestressed Concrete Pressure Tunnels
By David T. Swanson
The term "pressure tunnel" in the broad sense includes all hollow spaces, aligned along an axis and surrounded by rock, which are suitable for pressurization. In particular, this category includes:
Jan 1, 1981
-
Stillwater Tunnel Project
By Harold G. Arthur
INTRODUCTION Stillwater Tunnel construction is scheduled to start in the spring of 1973. The tunnel will be the site of an extensive program in rapid excavation research. This paper presents a prog
Jan 1, 1997
-
Recent Bureau Of Reclamation Experience In Tunnel Construction By Contract
By William R. Groseclose, Cecil E. Tackett
Since 1965 when the first mole was used on Bureau work, the Bureau of Reclamation has completed 17 tunnels of over 5,000 feet in length. The longest was 12.8 miles. Total length of the 17 tunnels was
Jan 1, 1974
-
Slurry Face Machine Tunnelling
By Alastair R. Biggart
ABOUT BENTONITE TUNNELLING Much has been written and many learned papers given on this subject whose generic term is Slurry Tunnelling. This paper is about the particular form of slurry tunnelling
Jan 1, 1979
-
Planning and Preliminary Design of the North-South Bypass Tunnel, Brisbane, Australia
By Tony Peglas, Harry Asche, Eva Wood
The North-South Bypass Tunnel is a new $AUD1.5 billion underground traffic route in Queensland, Australia, a project of the Brisbane City Council. The tunnel is approximately 5.2 km long, bypassing th
Jan 1, 2005
-
Metropolitan Water Tunnel Program in Massachusetts - RETC2023
By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh
Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o
Jun 13, 2023
-
Underwater Tunnel Repair with Stainless Steel Segmental Liner - NAT2022
By Matthew Goff, Russell Lutch
The Great Lakes Water Authority (GLWA) operates the largest regional water authority in the State of Michigan. Two of the tunnels supplying raw water to the system from the Detroit River are the Sprin
Dec 1, 2022
-
Singapore’s Deep Tunnel Sewerage System—Experiences and Challenges
By Richard F. Flanagan, Robert H. Marshall
The Republic of Singapore’s Public Utilities Board is implementing the Deep Tunnel Sewerage System Project. The project’s deep tunnel component, 48 km of deep, large diameter sewer tunnels has been su
Jan 1, 2007
-
Raw Water Tunnel Condition Assessment
By Rafael C. Castro
As part of its risk management plan, the South Central Connecticut Regional Water Authority (RWA) is assessing the condition of its system of raw water conveyance tunnels and connecting pipelines. In
Jan 1, 2008
-
Differences In Design Considerations For Tunnel Vs. Mine Ventilation Fan Systems -Preprint 09-056
By G. A. Gamble
Fans used to ventilate subway, passenger rail and vehicular tunnels are similar to the fans used to ventilate underground mines. However, tunnel ventilation fan systems are typically designed to meet
Jan 1, 2009
-
Comparison of Different Blast Design Models, Using a Blasting Software
By Roozbeh Afzali
Designing an appropriate tunnel blasting pattern reduces the cost of rock breakage and subsequent operations such as loading, haulage and support of tunnels. For that reason, we developed a software t
Jan 1, 2008
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box Jacking
By Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001
-
Innovative Rehabilitation of Existing Tunnels under Minimum Impact on Operation
By A. G. Nitschke, I. Ossenbühl, W. Dolsak, J. Dase
"The authors have successfully developed an innovative rehabilitation concept, which meets actual technical standards and minimizes the impact on the operation of a key conveyor tunnel. A flexible and
Jan 1, 2015
-
The True Cost of Boulders in a Soft Ground Tunnel
By Hugh E. Cronin, Joseph J. Coluccio
The Columbia Slough Consolidation Conduit Project is a 12 ft. 0 in. inside diameter—15 ft. 4 in. excavated diameter tunnel, 8,300 lf. in length. The tunnel is divided in two parts a 4,460 lf. reach to
Jan 1, 2003
-
Structural Impacts to Tunnels Due to Flooding
By Raymond Sandiford, Taehyun Moon
"In 2012, Superstorm Sandy (Sandy) caused extensive flooding in many of the tunnels in New York City. The inundation resulted in two distinct stress changes to the tunnel structures. The first stress
Jan 1, 2016