Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Major Rehabilitation of the Montreal 55 Years Old Lafontaine Immersed Tube Highway Tunnel—Design Considerations - RETC2023

    By Laurent Rus, Bakar Amara, Jean Habimana

    The La Fontaine Tunnel in Montreal, Quebec is currently undergoing major structural rehabilitation work and systems upgrade work to comply with current codes, standards and best practices in fire life

    Jun 13, 2023

  • SME
    The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022

    By B. Catalano, D. Ifrim

    The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel

    Dec 1, 2022

  • SME
    Impacts Of The No-Blasting Specification On The Deep Tunnel Project, Chicago, Illinois

    By V. Rajaram

    The Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the Deep Tunnel

    Jan 1, 1991

  • SME
    Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024

    By Jeremy Cawley, Horry Parker Jr., Clint Wilson

    The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam

    Jun 23, 2024

  • SME
    Ultra-Long Tunnel Drive with TBM for the Construction of the Mineral Transport for the Woodsmith Project Polyhalite Mine - NAT2024

    By Karin Bäppler

    A new polyhalite fertilizer mine is currently being developed in the UK by Anglo American Crop Nutrients. The project includes the construction of a Mineral Transport Tunnel almost 37 kms long to hous

    Jun 23, 2024

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    Evaluating the Impact of DSC’s on TBM Performance in Devonian Dolomite - NAT2022

    By Greg Colzani, Emily Thompson

    The 3RPORT Project, includes a 5-mile tunnel excavated by a 19-foot diameter slurry Tunnel Boring Machine below the city of Fort Wayne, IN. The Geotechnical Baseline Report (GBR) indicated vuggy to ma

    Dec 1, 2022

  • SME
    Tunnel Construction For The Muck Valley Hydro Project

    By Jorge Martinez

    The Muck Valley Hydroelectric Project in Northeastern California required construction of a 3.65 meter tunnel through 6,623 meters of mixed volcanic flow deposits within a critical time frame. As Engi

    Jan 1, 1989

  • SME
    Small Diameter Tunnels - An Overview

    By Charles H. Arnold

    This topic addresses historic and current techniques of excavating, supporting and lining tunnels of 4 m (13.1 ft) and smaller. Special considerations relate to the economics of working in close qu

    Jan 1, 1981

  • SME
    Kemano Power Tunnel

    By Kenneth R. Dickson, I. Michael Gowring, Gary M. Davey

    The Kemano Power Tunnel is currently being constructed by a joint venture of Atkinson, Kiewit, and Commonwealth. The 5.73 m diameter, 16.1 km long tunnel is part of the Kemano Completion Project in Br

    Jan 1, 1991

  • SME
    Impacts Of The No- Blasting Specification On The Deep Tunnel Project Chicago, IL

    By V. Rajaram, D. P. O’Connor, L. Sakamoto

    In 1988, the Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the De

    Jan 1, 1993

  • SME
    The Boodex Method–A Way to Overcome Locally Very Poor Ground Conditions in Tunnelling

    By Gunnar Nord

    Shifting ground conditions when tunnelling often call for different methods of attacking the tunnel face. In order to overcome problems with local unstable soft ground in a hard rock tunnelling projec

    Jan 1, 2003

  • SME
    Drill and Blast Operations and Water Control Measures atLake Mead Intake No. 2

    By Richard W. Kimball, Richard F. Coon

    This paper describes drill and blast excavation and groundwater control measures at the Lake Mead Intake No. 2 project. The construction includes a deep access shaft, intake shaft, surge chamber, fore

    Jan 1, 1999

  • SME
    Integrated Seismic Imaging System for Geological Prediction Ahead in Underground Construction

    By P. Otto, G. Borm, Th. Dickmann, F. Amberg, R. Giese

    Based on many years experience, the well approved Tunnel Seismic Prediction System (TSP) has been substantially enhanced for online geological prognosis in underground construction. The method provide

    Jan 1, 2001

  • SME
    RETC 2003 Breaks Attendance Records

    By William R. Yernberg

    The 2003 Rapid Excavation and Tunneling Conference (RETC) was held at the New Orleans Marriott, New Orleans, LA, June 15-18. The New Orleans conference was the 16th since the RETC was formed in 1971.

    Jan 1, 2003

  • SME
    Durban Harbour Tunnel—First Use of a Slurry Tunnel Boring Machine in South Africa

    By Andrew K. hg` Officer, A. L. Griffiths, J. Andrew Hindmarch, Gert Wittneben

    Durban Harbour in South Africa is one of the continent’s busiest ports however the harbor entrance is currently too small for the new generation of container ships. There-fore it is to be deepened and

    Jan 1, 2007

  • SME
    Conceptual Design for a Deep Underground Science and Engineering Laboratory Cascades

    By Roberto J. Guardia, Robert A. Robinson, John Wilkerson, Wick Haxton

    Several candidate sites have been proposed for the Deep Underground Science and Engineering Laboratory (DUSEL), a facility that would provide over 2000 meters of overburden to screen out cosmic rays t

    Jan 1, 2005

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • SME
    Ground Characterization For CSO Tunnels In Washington, D.C.

    By Maurice A. Ponti

    The D.C. Water and Sewer Authority is implementing the Anacostia River Projects component of its Long-Term CSO Control Plan, including 21 kilometers of 3.7- to 7-meter-diameter CSO near-surface divers