Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design Considerations And Evaluation Process For A New Tunnel And Ocean Outfall Project

    By Steve Dubnewych

    The Joint Water Pollution Control Plant, operated by the Sanitation Districts of Los Angeles County, treats wastewater generated by over three million people. A new tunnel and ocean outfall is being c

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008

  • SME
    Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone

    By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo

    The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p

    Jan 1, 2007

  • SME
    Case History Of The Wachovia?Knight Theater Pedestrian Tunnels

    By Eric Eisold

    The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea

  • SME
    Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project

    By Jean Habimana

    The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather

    Jan 1, 2008

  • SME
    Initial Support Design for Tunnels in Horizontally Bedded Sedimentary Rock

    By Irwan S. Halim

    For tunnels in horizontally bedded rock, geologic factors affect the selection and design of the initial supports, including the rock propensity toward parting along bedding and the resulting high pot

    Jan 1, 2008

  • SME
    Electrical Resistivity: An Answer to the Challenges Raised by the Design of a 17 Km-long Tunnel in the Andes

    By Farrukh M. Mazhar, Philippe P. Martin

    Electrical Vertical Sounding (EVS) profiling has proven to be a valuable tool to set the alignment and guide the design of a 17 km-long, 4.7m diameter water-conveyance tunnel in the Peruvian Andes at

    Jan 1, 2003

  • SME
    Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle Harbour

    By R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves

    Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse

    Jan 1, 2001

  • SME
    Ground Investigation and Tunnel Design for the Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

    By Guy Bridges, Elton Ko, Cheng Ting Ning, Owen Ng, Giovanni Chang, Robert Anderson

    "PROJECT OVERVIEWThe Liantang/Heung Yuen Wai Boundary Control Point (BCP) and Associated Works will be the seventhland crossing between Shenzhen and the Hong Kong Special Administrative Region (HKSAR)

    Jan 1, 2016

  • SME
    The 3D Geological Model of the Karavanke Tunnel, Using Leapfrog Geo

    By Tina Živec, Žibertm Marko

    "Civil design has changed in many ways using BIM (Building Information Modelling) technology in its most recent form. Such a technological breakthrough has not been successful so far in traditional or

    Jan 1, 2016

  • SME
    Shallow Microtunneling below a Critical Runway

    By Matthew Grzelak, Gulsah Erinc, David R. Chapman

    "The third phase of the Bagram Drainage System project at Bagram Air Force Base in Afghanistan included construction of a shallow, 540-m long, 1.8-m inside diameter drainage tunnel. The tunnel penetra

    Jan 1, 2016

  • SME
    A Model to Predict the Performance of EPB-TBMs in a Complex Geology in Istanbul

    By Aydin Shaterpour Mamaghani, Cemal Balci, Nuh Bilgin, Mucahit Namli, Hanifi Copur

    "It is expected that more than 10 Billion USD will be spent in Istanbul in coming years on tunnel boring especially with EPB-TBMs. However, the geology of Istanbul is very complex. Geologic formations

    Jan 1, 2016

  • SME
    DC Water First Street Tunnel – Integrated Engineering and Construction

    By Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda

    "INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob

    Jan 1, 2016

  • SME
    Sequential Excavation Method with Ground Freezing for DC Water’s First Street Tunnel

    By Stephen Njoloma, William Bracken, Harald Cordes, Ivan Hee

    "DC Water’s First Street Tunnel (FST) is part of the $2.6 billion Clean Rivers Project designed to reduce the occurrence of combined sewer overflows into local waterways. Due to flood events in the Bl

    Jan 3, 2018

  • SME
    Mechanized Tunnelling Driving Toronto’s Big Move - Eglinton–Scarborough Crosstown Tunnel Construction (ECLC1-15)

    By Osamu Nishikokura, Jumpei Yamashita, Darrell Liebno, Malcolm Sheehan

    "The Eglinton-Scarborough Crosstown Project builds a 19km LRT corridor that includes a 10km underground portion, between Keele Street and Laird Drive. The West Tunnel Contract (ECLC1-15) includes 6.5k

    Jan 1, 2016

  • SME
    Challenges and Solutions related to the Interaction of Soil Conditioning and Main Drive on Large Diameter EPB TBM’s - A Case History

    By Jens Classen

    "GENERAL PROJECT DATA The Sparvo Tunnel belongs to “Variante di Valico” project, a new 65 km highway link between Bologna and Florence, designed to renew the existing A1 route and to connect in a fast

    Jan 1, 2016

  • SME
    Geotechnical Considerations No. 7 Subway Line Extension Project in New York City

    By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts

    As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro

    Jan 1, 2005

  • SME
    Hard-Rock TBM Cutter Life Evaluation: A Case Study of NS3 Project Mixshield TBM

    By Dae Young Kim, Sim Bo Kyung, Ebrahim Farrokh, Ki Chang Hyun

    "TBM cutter life evaluation in abrasive granitic rocks is a very important issue, especially in pressurized face tunneling with mixshield TBM for which the planning of costly interventions becomes cru

    Jan 1, 2016

  • SME
    Comparison of Face Pressurized Shield Methods in Various Soil Conditions

    By Klaus Rieker

    Over the last 30 years Wayss & Freytag Ingenieurbau AG has gained a lot of experience in mechanized tunnelling on various major projects. During this period most important developments concerning the

    Jan 1, 2005

  • SME
    Drilling-And-Blasting For Small Tunnels

    By Robert S. Mayo

    My subject today is "Drilling-and-Blasting of Small Rock Tunnels". I am sure that there will be some people, primarily college students but perhaps Consulting Engineers, who will say: "Drilling-and-Bl

    Jan 1, 1981